Text
[
i Mr. R. P. N:cci - Vic2 Przsid:nt -
..Octcher.4, 1999 h
l Nucl:ir Ovarsight and R:gulatory Affairs c/o Mr. Divid A. Smith
' c'
- Northust Nucl: r Enzrgy Company C
P. O. Box 128 L
Watedord, CTL O6385.
L I
SUBJECT:
. MILLSTONE UNIT 2, MODIFICATION OF SELECTED TESTING
- COMMITMENTS RELATED TO GENERIC LETTER 83-28 (TAC NO. MA3948)
Dear Mr. Necci:
. By letter dated September 30,1PM, the' Northeast Nuclear Energy Company (the licensee)
_ submitted a request for changes to certain commitments made on Action items 4.2.1,4.2.2,
.4.5.1, and 4.5.'2 with respect to Generic Letter (GL) 83-28 at Millstone Nuclear Power Station (Millstone), Unit 2. Since the implementation of GL 83-28, the licensee has been reevaluating
- its reactor trip circuit breaker (RTCB) maintenance program, trending RTCB parameters measured during testing, and performing ~on-line functional testing of the reactor trip system to
. ensure reliable RTCB operation. The licensee has determined that the RTCBs are being tested l
more frequently than necessary, which, in turn, could cause premature degradation of the breakers, and increase the probability of a test-induced plant transient. Therefore, the licensee
' proposes to modify commitments made for Action items 4.2.1,4.2.2,4.5.1, and 4.5.2 of GL 83-28 by providing additional justificab9ns or a safety basis for the changes.
- The staff has reviewed the proposed changes and did not identify any safety concerns, l.
l therefore, no further action is required by the staff. This completes our effort and closes TAC No. MA3948.
l Sincerely, p
Original signed by:
i Ronald B. Eaton, Sr. Project Manager, Section 2 L
Project Directorate I Divisior of Licensing Project Management t
Office of Nuclear Reactor Regulation Docket No. 50-336 '
cc: See next page lI DISTRIBUTION:
h Docket File' T. Clark-OGC PUBLIC R;Eaton ACRS-PDI-2 R/F
- J. Durr, RI fg DOCUMENT NAME: ' G:\\PDI-2\\ MILLSTONE 2\\MA3948.WPD
- -To receive a copy of his document, indicate in the box
- "C" = Copf without attachment / enclosure "E" = Copy
' with cttachment/g/
ure - "N" = No copy OFFICE PM:P$h 1 lE LA:PDI-2,pf, IN SC fC 4 l
l l
J NAME kEmthz /rsl TClark f/ W !/
JCIffJord DATE-10/ " /99 10/4 /99 10/"f /99 10/
/99 10/
/99 Official Record Copy 9910; M 991004 1
PDR ADOCK 05000336
.P, PDR
3 3-I
'g
[
\\.
UNITED STATES
]
NUCLEAR REGULATORY COMMISSION J
If WASHINGTON, D.C. 2066tWOO1
,o!
October 4, 1999 Y.Tf. P. Necci Vice President
{
Nuclear Oversight and Regulatory Affairs
{
c/o Mr. David A. Smith j
Northeast Nuclear Energy Company P. O. Box 128 Waterfoid, CT 06385.
SUBJECT:
MILLSTONE UNIT 2, MODIFICATION OF SELEC RED TESTING COMMITMENTS RELATED TO GENERIC LETTER 83-28 (TAC NO. MA3948) i Dear Mr. NeccP By letter dated September 30,1998, the Northeast Nuclear Energy Company (the licensee) submitted a request for changes to ::ertain commitments made on Action Items 4.2.1,4.2.2, 4.5.1, and 4.5.2 with respect to Generic Letter (GL) 83-28 at Millstone Nuclear Power Station (Millstone), Unit 2. Since the implementation of GL 83-28, the licensee has been reevaluating its reactor trip circuit breaker (RTCB) maintenance program, trending RTCB parameters measured during testing, and performing on-line functional testing of the reactor trip system to ensure reliable RTCB operation. The licensee has detennined that the RTCBs are being tested more frequently than necessary, which, in turn, could cause premature degradation of the breakers, and increase the probability of a test induceu plant transient. Therefore, the licensee proposes to modify commitments made for Action items 4.2.1,4.2.2,4.5.1, and 4.5.2 of GL 83-28 by providing additional justifications or a safety basis for the changes.
The staff has reviewed the proposed changes and did not identify any safety concerns, therefore, no further action is required by the staff. This completes our effort and closes TAC No. MA3948.
Sincerely, f)
Ro 'ald' fy B~. Eaton, Sr. Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page
E l.
Millston2 Nucl:ar Pow:r Station Unit 2 cc:
Ms. L. M. Cuoco Ernest C. Hadley, Esquire Senior Nuclear Counsel 1040 B Main Street Northeast Utilities Service Company P.O. Box 549 P. O. Box 270 West Wareham, MA 02576 Hartford, CT 06141-0270 Mr. R. P. Necci Edward L. Wilds, Jr., Ph.D.
Vice President - Nuclear Oversight Director, Division of Radiation and Regulatory Affairs Department of Environmental Protection Northeast Nuclear Energy Company 79 Elm Street P. O. Box 128 Hartford, CT 06106-5127 Waterford, CT 06385 Regional Administrator, Region i Mr. J. T. Carlin U.S. Nuclear Regulatory Commission Vice President - Human Services 475 Allendale Road Northeast Utilities Service Company King of Prussia, PA 19406 P. O. Box 128 Waterford, CT 06385 First Selectmen Town of Waterford Mr. Allan Johanson, Assistant Dire tor 15 Rope Ferry Road Office of Policy and Management Waterford, CT 06385 Policy Development and Planning Division Mr. Wayne D. Lanning, Director 450 Capitol Avenue - MS# 52ERN Millstone Inspections P. O. Box 341441 Office of the Regional Administrator Hartford, CT 06134-1441 475 Allendale Road King of Prussia, PA 19406-1415 Mr. M. H. Brothers Vice President - Millstone Operations Charles Brinkman, Manager Northeast Nuclear Energy Company Washington Nuclear Operations P.O. Box 128 ABB Combustion Enoineering Waterford, CT 06385 12300 Twinbrook Pkwy, Suite 330 Rockvil!s, MD 20852 Mr. J. A. Price Director - Unit 2 Operations Senior Resident inspector Northeast Nuclear Energy Company Millstone Nuclear Power Station P.O. Box 128 c/o U.S. Nuclear R79ulatory Commission Waterford, CT 06385 P.O. Box 513 i
Niantic, CT 06357 Mr. L. Olivier Senior Vice President and Chief l
Mr. F. C. Rothen Nuclear Officer - Mitistone Vice President - Nuclear Work Services Northeast Nuclear Energy Company Northeast Utilities Service Company P.O. Box 128 P. O. Box 128 Waterford, CT 06385 Waterford, CT 06385
r7
]
l i i
' ' Millstons Nucl::r Pow:r Station Unit 2 j
. cc:
(
Citizens Regulatory Commission Ms. Nancy Burton ATTN: Ms. Susan Perry Luxton 147 Cross Highway 180 Great Neck Road Redding Ridge, CT 00870 Waterford, CT 06385.
Deborah Katz, President
- Citizens Awareness Network P. O. Box 83 Shelburne Falls, MA 03170
- Ms. Terry Concannon j
Co-Chair i
Nuclear Energy Advisory Council k
Room 4100
)
Legislative Office Building Capitol Avenue Hartford, CT 06106 i
Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 l
Little Harbor Consultants, Inc.
l Millstone - ITPOP Project Office l
P. O. Box 0630 i
Niantic, CT 06357-0630 I
Attorney Nicholas J, Scobbo, Jr.
Ferriter, Scobbo, Caruso, Rodophele, PC l
75 State Street,7th Floor l
Boston, MA 02109 Mr. D. B. Amerine l
Vice President - Engineering Services
{
('
Northeast Nuclear Energy Company l
P. O. Box 128 Waterford, CT 06385 Mr. D. A. Smith
)
Manager - Regulatory Affairs 1
Northeast Nuclear Energy Company P. O. Box 128 Waterfnrd, CT 065 5 i
L