Forwards Safety Insp Repts 50-245/90-11,50-336/90-12 & 50-423/90-09 on 900611-15 & 25-29.No Violations Noted
ML20059C826
Person / Time
Site: Millstone  
Issue date: 08/28/1990
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059C828 List:
References
NUDOCS 9009050378
Download: ML20059C826 (2)


See also: IR 05000245/1990011

Text

..

_.

W

"

. .

'

s.

.

.

..

AUG 2 81990-

1

~ Docket Nos. 50-245-

50-336

50-423

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Eagineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

i

Gentlemen:

Subject: Combined Inspection Report Nos. 50-245/90-11, 50-336/90-12 and

50-423/90-09

This letter refers to the routine safety inspection conducted by Mr. R. J. Paolino

of this office on June 11-15, 1990 and June 25-29, 1990 at the plant site in

-

Waterford, Connecticut and at the corporate office in East Berlin, Connecticut.

4

'

The inspection examined activities which included engineering support,'the

emergency diesel generator fuel oil program and environmental qualification of

equipment issues.that are authorized by NRC License Nos.-DPR-21, DPR-65 and

NPF-49.

Discussions of our findings were held by Mr. Paolino with

Mr.' G. L. Johnson and other members of your staff at the-conclusion- of the

inspection.

Areas examined during this inspection are described,in the NRC Region I

-

Inspection Report which is enclosed with this letter. Within these areas, the

'

. inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection,-no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

)

is appreciated.

Sincerely,

Or181aal Sicusd By:

Jacque P,. Lart

L

Jacque P. Durr, Chief

l

Engineering Branch

Division of Reactor Safety

Enclosure: NRC Region I Combined Inspection Report Numbers

0 ', a d A

50-245/90-11. 50-336/90-12; 50-423/90-09

n

.

0FFICIAL RECORD COPY

IR MILL 3 90-11 - 0001.0.0

08/15/90

gg

9009050378 900828

PDR

ADOCK 05000245

0

PDC

M '.0/

.

.

.

.

.

-

,

-Q

_

.

.e

AUG 2 81990-

'

,

'

Northeast Nuclear' Energy Company

2

.

cc w/ enc 1:

1

<

W. D. Romberg, Vice President, Nuclear Operations-

D. O. Nordquist, Director .'of. Quality Services

R.. M. Kacich, Manager, Generation Facilities Licensing

-

S. E. Scace, Station Superintendent

O. D. "il kr, Stati:n

per'ntendent, 4:dder Nect

Public Document Room (POR)

local Public Document Room (LPDR).

Nuclear Safety Information Center (NSIC)~

!

,

NRC Senior Resident Inspector

<

,

State of Connecticut

i

bec w/ enc 1:

-

,

'

Region I Docket Room (with concurrences)

Management Assistant DRMA (w/o enc 1)

R. Bellamy, DRSS

t

DRP Section Chief.

M. Conner, SALP Reports Only

S. Pindale, RI, Beaver Valley

W. .,aymond, SRI,' Millstone 1&2

,

K.' Abraham, PA0 (20) SALP Re,nort and (2) All Inspection P.eports

_

J. Caldwell, EDO

-

D. Jaffe, LPM, NRR

.

I:

4

e

&

RI:DRS

.

H

RI:DRS

RI:0RS

!

Paolino/k1/rw

Anderson-

Durr

'8/o7 /90

8/ 9 /90

8/.fT/90

0FFICIAL RECORD COPY

IR MILL 3 90-11 - 0002.0.0

08/08/90