MONTHYEARML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206G7741999-05-0303 May 1999 Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20205N0821999-04-12012 April 1999 Forwards SE of NSP Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Licensee Adequately Addressed Actions Requested in GL ML20205N5301999-04-0909 April 1999 Discusses Arrangements Made on 990406 for Administration of Licensing Exams at Monticello Nuclear Generating Station During Wk of 990823.Requests That Exam Outlines Be Submitted by 990128 & Supporting Ref Matls by 990719 ML20205N4811999-04-0909 April 1999 Forwards Licensing Requalification Insp Rept 50-263/99-10 on 990308-12.No Violations Noted.However,Inspectors Through Observation of Simulator Scenario Exams Noted Difficulties in Ability of SM to Simultaneously Implement Duties of SM ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C4851999-03-26026 March 1999 Informs That on 990203,NRC Staff Completed PPR of Nuclear Plant.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20205A5881999-03-24024 March 1999 Forwards Request for Addl Info Re Submittal Requesting Rev of pressure-temperature Limits & Surveillance Capsule Withdrawal Schedule ML20204H4711999-03-18018 March 1999 Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05 ML20207H5161999-03-11011 March 1999 Forwards Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-09
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARIA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20151Y4681988-04-15015 April 1988 Partial Response to FOIA Request for Documents Re Event Involving Problems W/Msiv.App a & B Documents Available in Pdr.App B Documents Also Encl ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20149H8811988-02-18018 February 1988 Partial Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR ML20149G0731988-02-10010 February 1988 Responds to Re Announced Reorganization of NRC at TMI-2.NRC Personnel Stationed at Site,Region I & NRC Headquaters Will Continue to Provide Effective Regulatory Oversight of Cleanup Activities ML20147E6621988-01-19019 January 1988 Partial Response to FOIA Request.App G Documents Already Available in Pdr.App H Documents,Re INPO Accreditation Training,Encl & Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) ML20147D4821988-01-0606 January 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.Documents Also Available in Pdr.Portions of App B Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20236V7511987-12-0202 December 1987 Partial Response to FOIA Request for All NRC Records & Info Re Petition for Issuance of Show Cause Order.Forwards App N Documents.App M & N Documents Available in Pdr.Portions of App N Documents Deleted (Ref FOIA Exemption 6) ML20236L6761987-11-0909 November 1987 Ninth Partial Response to FOIA Request for Records,Including Notes of Interview of K Mcmahon.Forwards App K Documents. App K & L Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7,respectively) ML20245C4051987-10-29029 October 1987 Final Response to FOIA Request for Records.App a & B Documents Available in Pdr.App a Documents Encl ML20236D4491987-10-23023 October 1987 Partial Response to FOIA Request for Documents,Including Rd Martin 850716 Memo Re Allegation Processing Programs.Encl App E & F Documents in Pdr.App F & G Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 6) ML20235R8521987-09-30030 September 1987 Responds to Re EIS for Meltdown of Large Reactors & NRC Compliance W/Nepa.As Result of TMI-2 Accident on 790329,NRC Included Class 9 Accidents in Assessments in Fes Re Licensing of Plants.Related Info Encl ML20235K3461987-09-30030 September 1987 Partial Response to FOIA Request.App C Documents Re Deficient Practices by Util Bolt Supplier Encl & Available in PDR ML20235F8141987-09-24024 September 1987 Partial Response to FOIA Request for Documents.Forwards App B,C & D Documents.App a & B Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 4).App D Documents Withheld in Entirety (Ref FOIA Exemptions 5 & 6) ML20235A4371987-09-17017 September 1987 Final Response to Appeal Re Denial of FOIA Request for Documents Re Concerns of Individual About Util & S&W Technical Svcs.Records Two Through Five on Encl App Forwarded.Record One Withheld (Ref FOIA Exemption 7) ML20238F7581987-09-14014 September 1987 Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees IA-87-512, Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees1987-09-14014 September 1987 Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees ML20238E3931987-09-10010 September 1987 Final Response to FOIA Request.App D Documents Re SALP Rept Preparation Encl & Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5).App F Documents Partially Withheld (Ref FOIA Exemption 4) ML20238E0081987-09-0101 September 1987 Responds to 870715 Questions Re Plant Concerning GE Pumps ML20237F5921987-08-19019 August 1987 Partial Response to FOIA Request.Lers Indicated in Request for Dockets 50-220,322 & 410 Not Issued by Licensee.Forwards Documents Listed in Apps a & B.App a Documents Available in Pdr.App B Documents Being Made Available in PDR ML20236K2621987-08-0404 August 1987 Partial Response to FOIA Request for Records Re AO Reporting.Forwards App D & E Documents.Documents Also Available in PDR ML20236H0831987-07-30030 July 1987 Responds to Re Possibility of LOCA at Plants. Majority of LOCA Research Complete & Understanding of ECCS Performance During LOCA Greatly Improved.Conservatism of Methods Specified in Commission Rules Demonstrated ML20235Y6091987-07-21021 July 1987 Forwards Photocopy of Fr Notice That Incorporates DOJ 740304 Advice Ltr in Entirety,Per Request for DOJ Advice Ltrs Rendered in Conjunction W/Cp Antitrust Review of Plants ML20215H4231987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Plant Feedwater Line Failure.Forwards App H Documents.App G & H Documents Available in Pdr.Document Listed in App I Completely Withheld (Ref FOIA Exemption 5) ML20238E0341987-05-28028 May 1987 Responds to Questions Raised in Re Plant IA-87-221, Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR1987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR ML20214E2841987-05-18018 May 1987 Final Response to FOIA Request.No PRAs on File for McGuire 1,Bellefonte 1 & Gassar.Pras for Susquehanna 1 & Oyster Creek Available in PDR ML20213G1241987-05-12012 May 1987 Final Response to FOIA Request.App a Documents Already Available in Pdr.App B Documents Encl & Available in PDR ML20215H8901987-05-0505 May 1987 Sixth Partial Response to FOIA Request for Documents Re Allegations.Forwards App C & D Documents.App B Documents Also Available in PDR ML20215K5311987-05-0505 May 1987 Informs That Because Plants Adjudicatory Hearings Currently Before Nrc,Comments on Merits of Plant Issues Would Be Inappropriate,Per Encl Recipient .Served on 870506 1989-09-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206G7741999-05-0303 May 1999 Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205N0821999-04-12012 April 1999 Forwards SE of NSP Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Licensee Adequately Addressed Actions Requested in GL ML20205N5301999-04-0909 April 1999 Discusses Arrangements Made on 990406 for Administration of Licensing Exams at Monticello Nuclear Generating Station During Wk of 990823.Requests That Exam Outlines Be Submitted by 990128 & Supporting Ref Matls by 990719 ML20205N4811999-04-0909 April 1999 Forwards Licensing Requalification Insp Rept 50-263/99-10 on 990308-12.No Violations Noted.However,Inspectors Through Observation of Simulator Scenario Exams Noted Difficulties in Ability of SM to Simultaneously Implement Duties of SM ML20205C4851999-03-26026 March 1999 Informs That on 990203,NRC Staff Completed PPR of Nuclear Plant.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205A5881999-03-24024 March 1999 Forwards Request for Addl Info Re Submittal Requesting Rev of pressure-temperature Limits & Surveillance Capsule Withdrawal Schedule ML20204H4711999-03-18018 March 1999 Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05 ML20207H5161999-03-11011 March 1999 Forwards Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20202B7191999-01-26026 January 1999 Discusses 990125 Telcon with T Witschen & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Monticello Nuclear Generating Station.Insp Planned for Week of 990308 ML20199H8321999-01-20020 January 1999 Forwards Insp Rept 50-263/98-18 on 981201-990111.No Violations Were Identified.Conduct of Activities at Monticello Facility Was Generally Characterized by safety- Conscious Operations & Sound Maint Practices ML20199G7721999-01-14014 January 1999 Forwards Request for Addl Info Re GL 88-20, Individual Plant Exam of External Events (IPEEE) for Severe Accident Vulnerabilities, Issued in June 1991 ML20206R8631999-01-12012 January 1999 Informs That Staff Has Prepared TS Interpretation of Requirements for Extending Surveillance Intervals at Plant,Per NRC Request ML20199E4791999-01-0606 January 1999 Forwards SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Monticello ML20206R8741999-01-0404 January 1999 Discusses Clarification of Understanding of Safety Evaluation Related to Deviation from Emergency Procedure Guidelines for Monticello.Staff Agrees with NSP Characterization & Resolution of Issues ML20198R2001998-12-30030 December 1998 Forwards Insp Rept 50-263/98-19 on 981214-18.No Violations Noted.Purpose of Insp Was to Review Plant Chemistry Program, PASS & REMP ML20198P0501998-12-28028 December 1998 Informs of Completion of Review of Relief Request 9 Re Third 10-year Interval ISI Program Plan,Entitled Use of High Alloy/High Nickel Calibr Block for Dissimilar Metal Welds. Supporting SE Encl ML20198G0761998-12-21021 December 1998 Acks Receipt of Notifying NRC That Commitment Noted in Is Complete Re Tornado Effects on Reactor Bldg Superstructure ML20198D0181998-12-15015 December 1998 Informs That as Part of PRA Implementation Plan,Commission Assigned Two SRAs to Each Regional Ofc.Sras Will Routinely Assess Licensee Event Repts,Plant Events,Insp Findings & EAs from Risk Perspective ML20198B7721998-12-14014 December 1998 Forwards Insp Rept 50-263/98-16 on 981014-1130 & Notice of Violation Re Fire Brigade Drill Participation ML20198D0641998-12-10010 December 1998 Forwards SE Accepting Licensee 971118 Request for Review & Approval of Deviation from BWROG Epg,Rev 4,NEDO-31331, March,1997.Deviation Will Permit Rev of Plant EOPs to Recognize 2/3 Core Height as Adequate for Core Cooling ML20196C2411998-11-24024 November 1998 Forwards Insp Rept 50-263/98-17 on 981026-30.No Violations Noted.Security Dept self-assessment Efforts Continue to Be Very Strong ML20196D5641998-11-20020 November 1998 Discusses 981104 Insp Resource Planning Meeting for Monticello & Advises of Planned Insp Effort for Next 6 Months at Plant.Info Provided to Min Resource Impacts on Staff & to Allow for Rescheduling Conflicts to Be Resolved ML20195J8811998-11-19019 November 1998 Informs That EOP Flow Charts C.5-1100 RPV Control, Rev 5 & C.5-1100... Rev 6 Marked Proprietary & Submitted as Attachments 3 & 4 to Util Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20196G6081998-11-19019 November 1998 Submits Correction to Which Advises Licensee That EOP Flow Charts, C.5-1100 RPV Control, Rev 5 & C.5-1100 RPV Control, Rev 6,marked Proprietary,Will Be Withheld from Public Disclosure.Ltr Reissued to Correct Date of Issuance ML20195E3321998-11-12012 November 1998 Forwards SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Facility Has Adequately Addressed Purpose of 10CFR50.54(f) Request.Usi A-46 Program Was Established in Response to GL 87-02 ML20196D7291998-11-10010 November 1998 Forwards Insp Rept 50-263/98-15 on 980831-1014.No Violations Noted.Investigation Team Assembled by Station Mgt to Determine Root Cause of Offgas Sys Problem Was Thorough & Aggressive ML20154L2951998-10-0909 October 1998 Informs That Effective 981011,project Mgt Responsibility for Plant Will Be Transferred from Tj Kim to CF Lyon.Cf Lyon May Be Contacted at Listed Number ML20154F4971998-10-0606 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-263/98-09 Issued on 980730 ML20154J2501998-10-0202 October 1998 Forwards Audit of Year 2000 Program at Monticello Nuclear Generating Plant on 980915-17 as Followup to NRC GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants, Issued on 980511 ML20153C4611998-09-21021 September 1998 Submits Comments on Draft Environ Impact Statement for Minnesota Lake Superior Coastal Program 1999-09-09
[Table view] |
Text
. . . . .. . ..-.. . . . . -- . . - - . .. .
. ~
hu & W
..~uy UNITED STATES g NUCLEAR REGULATORY COMMISS!ON
[ a nEoion m t
g / vos noosavatt mono
/ SLsN sLLYN. lLLINOIS 80137 e...*
JUN 0 5 E85 Docket No. 55-4EE5 This is to inform you that you passed the written examinetion administered to you on April 30, 1985, and the operating test administered to you on May 1,1985, but did not pass the simulator
,g oxamination administered to you on May 1, 1985, in connection with your application for a senior operator license for the
~
Monticello Nuclear Facility. Accordingly, your application for o senior operator license is hereby denied. Enclosed is a copy of the Examiner's notes that indicates those areas in which you exhibited deficiencies.
You may file a new application after two months from the date of this letter in accordance with Section 55.12(a) of 10 CFR Part 55, a copy of which is enclosed. Under the regulations, each examination and reexamination consists of both written and operating tests. However, the Commission may, at its discretion, under Section 55.12(b), excuse an applicant from reexamination on the part of the examination which he has previously passed, if sufficient justification is presented. A request to be excused may be made at the time of reapplication.
In connection with the foregoing, your attention is directed to the provisions of Part 2, Title 10, Code of Federal Regulations, entitled, " Rules of Practice," copy enclosed, and more par-ticularly, Section 2.103(b)(2), wherein it is provided, in part, L
that an applicant has the right to request a hearing within twenty (20) days from the date of the denial.
If you request a hearing, include with your request a list identifying which of your responses to the examination questions you allege were graded incorrectly or graded too severely. In addition, provide the basis, ili as much detail as possible, for your opinion that those responses were graded incorrectly or too severely.
For the ear Regulatory Commission
,6' Luis A. yes, Chief .
Operati s Branch
Enclosures:
As st at ed l CC* . - - - s 8607180280 FOIA 860709 ppR PDR u gg g m PUNTENN86-36n
~. .
ES-601 F
ATTACHMENT 2 FORM LETTER TO FACILITY VICE PRESIDENT - REFERENCE MATERIAL REQUIRED Date:
, To:
Subject:
Requalification Program Evaluation In a telephone conversation between Mr. ~
(title, i.e., training coordinator) and Mr. (section chief),
arrangements were made for an evaluation of the requalification program at the (facility name). The evaluation visit is scheduled for the week '
~3 of (date).
For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for these examinations. For the examiner to adequately prepare for this.
- visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1 " Reference Material Requirements for Requalification Program Evaluations," by (date). Mr.
has been advised of our reference material requirements and where they are
~to be sent. ,
i This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires June 30, 1986.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.
Thank you for your consideration in this matter. If you have any a questions on the evaluation process, please contact (regional section chief and telephone number).
Sincerely, i I (Appropriate Regional Representative)
DISTRIBUTION:
Project Manager Resident Inspector -
Regional Section Leader Examiner (s)
Facility Training Coordinator Examiner Standards. 8 of 11 i
_ . . . . . . .