Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves 1999-09-08
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARDD-90-05, Advises That Time Provided for Commission to Review Director'S Decision DD-90-05 Expired.Commission Declined Review & Decision Became Final Agency Action on 901001. W/Certificate of Svc.Served on 9010121990-10-11011 October 1990 Advises That Time Provided for Commission to Review Director'S Decision DD-90-05 Expired.Commission Declined Review & Decision Became Final Agency Action on 901001. W/Certificate of Svc.Served on 901012 DD-90-04, Informs That Time Provied by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-90-04 Expired.Commission Declined Review & Decision Became Final Action on 900803.W/Certificate of Svc.Served on 9008141990-08-14014 August 1990 Informs That Time Provied by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-90-04 Expired.Commission Declined Review & Decision Became Final Action on 900803.W/Certificate of Svc.Served on 900814 ML20056B1841990-08-0202 August 1990 Advises That Aslab Cannot Accept P Pierce-Bjorklund 900730 Submission,Seeking to Appeal 900709 Director'S Decision DD-90-4.W/Certificate of Svc.Served on 900803 ML20055C7291990-05-31031 May 1990 Forwards Response to Questions Raised in 900226 & 0325 Ltrs Re Plant First 10-yr Interval Inservice Insp Program Plan ML20248J3651989-10-13013 October 1989 Comely Ltrs to I Smith, & Chilk, .* Advises That Listed Documents Reviewed by Seabrook ASLB & Will Be Placed in Pdr.Served on 891013 IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247J0561989-09-13013 September 1989 Responds to Suggestion Re Establishment of Natl Control Ctr to Monitor Cooling Water Temp of Nuclear Reactors. Establishing Natl Control Ctr to Monitor Reactor Coolant Temps of All Reactors Would Not Provide Added Safety Margin ML20246Q0711989-09-0101 September 1989 Ack Receipt of Re Plant Augumented Insp Team Rept on Natural Circulation Test at Facility.Augmented Insp Team Rept Will Not Be Changed & Further Interview W/Recipient Not Planned ML20246A8591989-08-17017 August 1989 Final Response to FOIA Request.Partially Withheld App a Document Re Confirmatory Action Ltr 89-11 Encl & Available in PDR (Ref FOIA Exemption 5) ML20245G4311989-08-11011 August 1989 Final Response to FOIA Request for Documents.Forwards App a Documents Also Available in PDR ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20244C3221989-06-0707 June 1989 Responds to Re Conversion of Plant & Production of Pollution Free Power.Doe Should Be Contacted for Info Re Research Programs Associated W/Alternative Energy Sources ML20247C4131989-05-18018 May 1989 Responds to 890418 Request for Clarification of Scope of Required Evacuation & Supporting Traffic Mgt for Serious Emergency at Facility.During Evacuation,Traffic Will Be Directed to Follow Predetermined Routes in Evacuation Plan ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20248J2231989-04-12012 April 1989 Final Response to FOIA Request for Records.No Records Subj to Request Located IA-89-145, Final Response to FOIA Request for Records.No Records Subj to Request Located1989-04-12012 April 1989 Final Response to FOIA Request for Records.No Records Subj to Request Located ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20205L9451988-10-28028 October 1988 Forwards Rept, Seabrook Yrs, Per 881019 Telcon Request ML20205F6921988-10-27027 October 1988 Advises That NRC Brief Responding to New England Coalition on Nuclear Pollution Appeal of Board 880808 Memorandum & Order Must Be Filed No Later than 881107.ASLAB Deferring Determination Re Hearing Oral Argument.Served on 881027 ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20155E5691988-10-0404 October 1988 Responds to to President Reagan Re Substandard Piping Fixtures,Unqualified Inspector Concern & Thoroughness of Licensee Insp to Determine Counterfeit Bolts.Nrc Issued NRC Bulletin 88-005 Concerning Problem IA-88-443, Final Response to FOIA Request.App a Documents Encl & Available in PDR1988-09-20020 September 1988 Final Response to FOIA Request.App a Documents Encl & Available in PDR ML20205A5301988-09-20020 September 1988 Final Response to FOIA Request.App a Documents Encl & Available in PDR ML20153D1801988-08-24024 August 1988 Advises of NRC Official Hours for Persons Wishing to Serve Pleadings,Papers or Documents on NRC Attys in Hearing Div of Ofc of General Counsel ML20153D1421988-08-24024 August 1988 Advises of NRC Official Hours for Persons Wishing to Serve Pleadings,Papers or Documents on NRC Attys in Hearing Div of Ofc of General Counsel ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20155G3441988-06-0808 June 1988 Responds to 880526 Postmarked Ltr Re Protracted Litigation on Acceptability of Emergency Plan for Plant.Nrc Will Continue Processing Lilco License Application Per 880601 Request ML20155E5981988-06-0707 June 1988 Forwards 880517 Memo from J Gutierrez to W Kane Re Allegations of Wrongdoing,Per 880601 Request ML20155E5851988-06-0303 June 1988 Responds to to DOJ & 880601 Telcon Re Concerns Related to Conduct of Insps by Unqualified Authorized Nuclear Inspector & to Deliberate Attempt by ANI Insurance Co to Conceal Discovery.Addl Followup Activities Planned ML20153D0621988-04-28028 April 1988 Responds to Appeal Re Denial of FOIA Request for Document. Encl Aslp 880323 Memorandum & Order Agrees to Withhold Identity of Individuals & Organizations Needed to Implement Plan.Document Withheld ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20151Y4681988-04-15015 April 1988 Partial Response to FOIA Request for Documents Re Event Involving Problems W/Msiv.App a & B Documents Available in Pdr.App B Documents Also Encl ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20150C7601988-03-15015 March 1988 Final Response to FOIA Request for Documents.No Agency Records Subj to Request Located.Plant Not Authorized to Begin Low Testing ML20196K0281988-03-0808 March 1988 Final Response to FOIA Request.No Agency Records Subj to Request Located ML20149N0851988-02-25025 February 1988 Final Response to FOIA Request for Documents Re Portions of Util Evacuation Plans.Documents Listed in App a Withheld (Ref FOIA Exemption 4) 1990-08-02
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As 1999-09-30
[Table view] |
Text
FaiO D. L lC pgc,b) S0 YY
, [a na,,,#'o, UfelTED STATES 9 , 3 y g _g. 3 l t yT ,,-
e i NUCLEAR REGULATORY COMMISSION i
!c h W A$HINGTON. O C 20555 CC(X[ T( ~
., May 5, 1987 OFFICE OF THE COMMISSION E R l
OFFL. . .
00ChElihi . wi' BR:.NCa l Mr. John Gondek !
Box 443 SERVED MAY -61987 Belchertown, Massachusetts 01007 1
Dear Mr. Gondek:
l i
Thank you for your recent letter concerning issues related to the Seabrook and Shoreham plants. Because those plants are currently the subject of ,
adjudicatory hearings before this agency, it would be inappropriate for me i to coment on the merits of the issues related to those plants. I can assure you, however, that public health and safety is the paramount consideration in my decisions on the licensing of new plants and the ;
continued operation of existing plants.
I appreciate your views on the Cormiission's responsibilities.
Sincerely, t
g JJ AW Kenneth M. Carr Commissioner cc: Seabrook Service list Shoreham Service list 8706250356 870505 .
DR ADOCK 050 2 .-
[
a-e \
t April 22, 1987 Commissioner Kenneth Carr Nuclear Regulatory Commission Washington, D. C. 20555 '
Dear Commissioner Carr.
I don' t write many letters, but I feel compelled to do so now because you folks down there at the NRC seem to be on the~ verge of i making a serious mistake by allowing the Seabrook nuclear power plant to open.
How can you possibly choose to expose millions of people to nuclear disaster while contaminating another part of the earth with radioactive poisons that will endure for hundreds of centuries? No thinking, moral human being who looks at all the facts concerning nuclear power would ,
ever want a nuclear plant situated anywhere, let alone at a major human population area. And it's total lunacy to consider opening one on a popular seacoast, crowded with human beings, and next to the only interstate highway that reaches into Maine, where countless millions drive by each year.
Can you not see that horrible accidents are inevitable with nuclear power, that such a complicated technology is easily defeated by-mechanical and electrical failure as well as human error? Were your eyes not open when the Three' Mile Island accident occurred in 1979, or ,
the Chernobyl disaster last year? Must the ultimate accident occur !
before you admit that nuclear power was a mistake'from the beginning? Ei Do you not understand that the use of nuclear power must come to an ;
end, that your primary responsibility is to. protect the people of this country, and not the investments of those who chose to ignore all the warning signs over the yeapt?
Why do you persiot in pushing such a deadly system on us, especially when you, as experts who.have studied the facts, should realize the great dangirs involved? How shall you explain-to the crippled survivors, anc' the relatives of the dead, that you saw no harm in what you were permitting? How do you know that you will not be treated as nuclear criminals, no different than the war criminals who have been hunted down and prosecuted for their great crimes against humanity?
FOR HEAVEN'S SAKE, PLEASE OPEN YOUR EYES! SEE THE TRUTH! '
STOP THESE PLANTS! DON'T WAIT UNTIL IT'S TOO LATE!
You must understand the magnitude of what you are doing. The lives and well-being of aillions of people are far more important than any l
-amount of money poured.into these ill-conceived projects.- Those ;
utilities who stand to loue financially from backing nuclear power should be thankful that their losses can.only be measured in dollars, and not in terms of human. suffering.and death. Just because they have spent billions,'they.think that gives them a right to open. Well, this i is America! You invest your. money in the hopes of a big return and sometimes you lose - your shir t!
f Congress can easily lift the' liability limits from a nuclear power accident, and there probably isn't a plant out there that would.be able to buy all the insurance they would need. This industry can't even j stand or. Its own feet economically, so why should tae mis guided souls who invested in it be supported by the taxpayers? Even the electric 1 utilities themselves recognize that nuclear power is a very bad choice; it's no coincidence that dozens of. nuclear plants have been cancelled and no new ones started in nearly a decade.
1 Nuclear energy has never lived up to any of its promises.
Too cheap to meter, they said in promoting it. Safe and reliable was the cry in succeeding years. We can't live without it, they now say.
All wrong, every last bit of it.
For you people at the NRC to favor the opening of these plants, you !
are creating the appearence that you have been bought off--a charge you l will have to defend yourselves against when the day of recriminations is !
at hand. How can you bet your, futures on more than 100 aging nuclear reactors--time-bombs, every one of them? Surely one of them is going to go off sooner or later, especially the way you've allowed them to keep running despite all their problems.
What possibly can you be thinking of that can outweigh the enormous
-inherent dangers in this technology? Why count yourselves among the last foolhardy supporters of a bankrupt system whose horrible legacy is only beginning to unfold? .
Real human lives are at. stake here, lives just as your own. Never has the evidence been so clear. No man of any conscience can ignore it, and those of you with important decisions to'make shall be held fully.
responsible. If you cannot face up to the nuclear industry now, then how will you be able to face yourselves in the mirror in the years to come? -
Let's stop playing games with the rules. . Whc6 state and local governments say there's no way to evacuate the people in the event of an ,
accident, believe them--they know what they're talking about. To concoct regulation changes to exclude their approval of evacuation. plans i is pure stupidity. To suggest that the evacuation zones can be shrunk to one mile, when all the evidence from Chernobyl dictates that they ;
should be expanded to hundreds, is criminal.
Did just 31 people die in the Soviet Union as its government says, or was it more than 15,000 as claimed by Soviet physicist'Igor Gerashchenko in a recent hearing of the Helsinki Commission?- His figure was just for the two biggest hospitals in Kiev--what about all the other hospitals in the region? What about those who never made it to.any hospital? What-about all those who only recently have begun'to feel ill from the accumulated effects? And what'about all those.the !
world over who will sicken and. die in the' years to come from the {
radiation released? The actual death toll 1from.Chernobyl OR ANY NUCLEAR !
POWER PLANT could-easily.be'in;the hundreds of thousands with millions of other lives ruined by sickness and grief, a fact so horrifying in its f dimensions that no sane person could ever support opening.any new l
. plants. l
e k
Everything man has ever built breaks down. and the more powerful the forces we try to harness, the more likely things will go wrong in a big way. Witness the Challenger disaster as well as the catastrophe at )
Chernobyl. As someone who makes a'living from software design and l implementation, I know quite well that countless unforseeable ,
possibilities exist in any complex system. Have you forgotten the hydrogen bubble that threatened to blow open the Three Mile Island 3 reactor? We should siever have tried to use so complicated and dangerous a technology to do something as simple and safe as boiling water. l 1
You have it in your power to prevent Seabrook and other nuclear i boondoggles like Shoreham from ever opening. Do your job and turn back j these plants. Stand up at last for a sane nuclear policy.
In addition to preventing the opening of any more nuclear reactors, l you should immediately shut down all those with any questions whatsoever about their safety. If we can get these plants closed before the next big accident, then we can all breathe more easily. There is enough non-nuclear electrical generating capacity to meet all our national needs, particularly if conservation, including load leveling, is maximized.
The only short term problem is getting the electicity from those areas with an excess to those without enough through new transmission lines.
Somehow, as a society, we must come to grips with the deadly remains of all the nuclear power plants, and keep them insulated from the surrounding environment for the next 300 centuries. What a mark against us in this nuclear age that we should be leaving behind poisonous legacies many times worse than all the ages before.
Governments often fail in their actions like children, but historically, they have been gradually learn.ing the lessons of moral understanding. The nuclear lesson is surely one of the biggest and most costly, but the sooner it is learned, the better the world will be.
Please find the courage to do what's right.
Sincerely, vohn ondek
";x 3 f,s Belchertown, Massachuse 01007 Cootes of this letter are being sent to each member of the Nuclear Regulatory Commission, the President, the Governors of Massachusetts, New York, and New Hampshire, members of Congress, and selected newspapers.
.