Forwards Amend 3 to License NPF-58 & Safety Evaluation. Amend Revises Max Isolation Time Allowed by Tech Specs from 50 to 20 for Operation of RCIC Sys Inboard Containment Isolation Valve
ML20205Q941
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/01/1987
From: Bernero R
Office of Nuclear Reactor Regulation
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20205Q946 List:
References
NUDOCS 8704060138
Download: ML20205Q941 (4)


Text

F r g.

'/ o

? ,, UNITED STATES

!" o NUCLEAR REGULATORY COMMISSION

$ 9 WASHING TON, D. C. 20555 April 1,1%7 Doc'k'et No.: 50-440 i

Mr. Murray R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Company P. O. Box 5000  ;

Cleveland, Ohio 44101

Dear Mr. Edelman:

SUBJECT:

EXIGENT CHANGES TO TECPNICAL SPECIFICATIONS FOR RCIC SYSTEM INBOARD CONTAINMENT ISOLATION VALVE RE: Perry Nuclear Power Plant, Unit No.1 The Comission has issued the enclosed Amendment No. 3 to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 4, 1987, as supplemented on March 19, 1987 This amendment changes the maximum isolation time allowed by the Technical Specifications from 50 seconds to 20 seconds for operation of the Reactor Core

, Isolation Cooling (RCIC) system inboard containment isolation valve. It also deletes from the Technical Specifications the load represented by the valve's direct-current (DC) operator and identification of the motor centrol center through which DC power is supplied to the operator. These changes are being made in relation to conversion of this normally-closed, DC motor operated valve to be normally-open with an alternating-current (AC) cperator.

We note your commitments in the March 19, 1987 letter to making an evaluation of the proposed and alternative configurations for the RCIC system steam line prior to December 31, 1987, and to implementing appropriate recomendations or modifications resulting from this evaluation prior to startup from the first refueling outage. Please inform us by October 31, 1987, as to what configurations are being evaluated.

We have reviewed the exigent circumstances associated with your request and have concluded that these changes to the TSs are necessary to allow Perry Unit I to continue startup testing and operation. We have also concluded that you provided a sufficient basis for findino that the exigent circumstancer, could not have been avoided, as required by 10 CFR 50.91(a)(6).

0

[ 0IDOS 5 P

i l

l t

j A copy of our Safety Evaluation is also enclosed. Notice of Issuance will be 1 included in the Comission's biweekly Federa1_ Register notice.

Sincerely, Robert M. Bernero, Director  ;

Division of BWR Licensing '

Enclosures:

1. Amendment No. 3 to License No. NPF-58
2. Safety Evaluation cc w/ enclosures:

See next page

)

i DISTRIBUTION:

heiERTHe Woodhead OGC EButcher NRC PDR RDiggs,LFMB NThompson Local PDR T8arnhart(4) JPartlow PDf4 Rdg File EJordan RBerrero LHarmon l

WButler BGrimes Pleech WJones M0'Drien DYassallo  !

ACRS(10) CMiles. OPA i

)

P PD#4/PM J FOR/D CfiC1 jk PDf4/D A DIR/DRL[8  !

n Pleechica DVassallo ad W8utler RBernero

/ /87 bbh y/87 j 43t/87 V// /87 y///87 (3 /f{/87 !_j/j '

l l

l l i

_ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ ___--___________--_-______-__-____J

l l

)

i J

2-i A copy of our Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Regis_ter notice.

Sincerely, w, - - _,

j Robert M. Bernero. Director i

Division of BWR Licensing j

Enclosures:

1 1. Amendment No. 3 to

2. Safety Evaluation 1

l cc w/ enclosures:

See next page ,

]

f P l

4 f

{

i

[

i l

.l 1

4 a

I I  !

l

~

Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and 2 Illuminating Company cc:

Shaw, Pittman, Potts & Trowbridge Mr. James W. Harris, Director 2300 N Street, N.W. Division of Power Generation Washington, D. C. 20037 Ohio Department of Industrial Relations Post Office Box 825 Donald H. Hauser, Esq. Columbus, Ohio 43?!6 The Cleveland Electric Illuminating Corpany P. O. Box 5000 The Honorable Lawrence Logan Cleveland, Ohio 44101 Mayor, Village of Perry 4203 Harper Street Resident Inspector's Office Perry, Ohio 44081 U. S. Nuclear Regulatory Commission Parmly at Center Road The Henorable Robert V. Orosz Perry, Ohio 44081 Mayor Village of North Perry North Perry Village Hall Regional Administrator, Reglen Ill 4778 Lockwood Road U. 5. Nuclear Regulatory Commission North Perry Village, Ohio 44081 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General Frank P. Weiss, Esq. 30 East Broad Street Assistant Prosecuting Attorney Columbus, Ohio 43216 105 Main Street Lake County Administration Center Radiological Health Program Painesville, Ohio 44077 Ohio Department of Health 1224 Kinnear Road Ms. Sue Hiatt Columbus, Ohio 43212 OCRE Interim Representative 8275 Munson Mentor Ohio 44060 Ohio Environmental Protection Agency 361 East Broad Street Terry J. Lodge, Esq. Colurrhus, Ohio 43266-0558 618 N. Michigan Street Suite 105 Toledo, Ohio 43624 Mr. James R. Socor, Chairman John G. Cardinal Esq. Perry Township Board of Trustees Prosecuting Attorney Box 65 4171 Main Street Ashtabula County Courthouse Perry, Ohio 44081 Jefferson, Ohio 44047 State of Ohio Eileen M. Duzzelli Public Utilities Conmission Tbc Cleveland Electric IE0 East Broad Street i Illuminating Company Columbus, Ohio 43266-0573 P. O. Box 97 E-210 Perry, Ohio 44081 l

l l