Requests Addl Info Re Testing of Standby Liquid Control Sys Demonstrating Total Flowrate of 82.4 Gpm Can Be Achieved Against Full Reactor Operating Pressure W/O Lifting Pump Relief Valve
ML20207G449
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/15/1988
From: Colburn T
Office of Nuclear Reactor Regulation
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
References
TAC-62767, NUDOCS 8808240121
Download: ML20207G449 (3)


Text

_

, s August 15, 1988 Docket No. 50-440 DISTRIBUTION:

fDocket: Files A NRC & Local PDRs

~PDIII;3'r/f' KPerkins GHolahan PKreutzer TColburn 0GC-WF1 EJordan BGrimes Mr. Alvin Kaplan, Vice President ACRS(10) PDIII-3 Gray Files Nuclear Group The Cleveland Electric Illuminating Company 10 Center Road Perry, Ohio 44081

Dear Mr. Kaplan:

SUBJECT:

STANDBY LIQUID CONTROL SYSTEM (SLCS) TESTING TO ENSURE COMPLIANCE WITH 10 CFR 50.62 FOR THE PERRY NUCLEAR POWER PLANT (PNPP) UNIT 1 (TAC 62767)

We have reviewed your iluly 12, 1988 response to our June 9,1988 request for additional information concerning the subject item. We requested information sufficient to determine that adequate testing had been conducted to demonstrate that a SLCS total flowrate of 82.4 gallons per minute (gpm) can be achieved against full reactor operating pressure without lifting the SLCS pump relief valve. You referenced two Technical Specification surveillance requirements 4.1.5.c and 4.1.5.d which you believed demonstrated this capability for the Perry Unit 1 SLCS pumps.

We have reviewed your response and have detennined that your response does not sufficiently demonstrate that a SLCS total flowrate of 82.4 gpm against full reactor operating pressure can be met without lifting the pump relief valves.

While your response demonstrates that routine surveillances are conducted which demonstrate that either pump can provide 41.2 gpm flow against full reactor pressure without lifting the relief valves and a total SLCS flowrate of 82.4 gpm at reduced pressure, it is not responsive to the staff's concern. Therefore, you are requested to commit to demonstrating through testing, on a one-time basis, prior to the end of your first refueling outage, that the SLCS pumps at Perry have the capability of achieving a total system flowrate of 82.4 gpm against full reactor operating pressure without lifting the SLCS pump relief valves.

J OFcI Ij 0 8803240121 880315 0 DR ADOCK 0500

. s

.' M Mr. Alvin Kaplan This request for information affects fewer than 10 respondents; therefore OMB clearance is not required under Pub. L.96-511..

If you have any questions concerning this request, please contact me at (301) 492-1369.

Sincerely,

/s /

Timothy G. Colburn, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Projects cc: See next page F F 3

i l

i b M Office: LA/P III-3 PM/PDIII-3 SRXB PD/P 13 Surname: P er TColburn/tg WHodges KPerkin's Date:  ;/ /88 7/t5/88 f//f /88 j/if/88 l I

i

, o i

~

1 Mr. Alvin Kaplan Perry Nuclear Power Plant The Cleveland Electric Unit 1 Illuminating Company cc:

Shaw, Pitt: nan, Potts & Trowbridge Mr. James W. Harris, Director 2300 N Street, N.W. Division of Power Generation I Washington, D.C. 20037 Ohio Department of Industrial Relations David E. Burke P.O. Box 825 ,

The Cleveland Electric Columbus, Ohio 43216 I Illuminating Company P.O. Bov 5000 The Honorable Lawrence Logan Cleveland, Ohio 44101 Mayor, Village of Perry 4203 Harper Street Resident Inspector's Office Perry, Ohio 44081 U.S. Nuclear Regulatory Comission Parmly at Center Road The Honorable Robert V. Orosz Perry, Ohio 44081 Mayor, Village of North Perry North Perry Village Hall Regional Administrator, Region III 4778 Lockwood Road U.S. Nuciear Regulatory Commission North Perry Village, Ohio 44081 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General Frank P. Weiss, Esq. 30 East Broad Street Assistant Prosecuting Attorney Columbus, Ohio 43216 105 Main Street Lake County Administration Center Radiological Health Program Painesville, Ohio 44077, Ohio Department of Health 1224 Kinnear Road Ms. Sue Hiatt Columbus, Ohio 43212 OCRE Interim Representative 8275 Munson Ohio Environmental Protection Mentor, Ohio 44060 Agency 361 East Broad Street Terry J. Lodge, Esq. Columbus, Ohio 43266-0558 618 N. Michigan Street Suite 105 Mr. Phillip S. Haskell, Chairman Toledo, Ohio 43624 Perry Township Board of Trustees Box 65 John G. Cardinal, Esq. 4171 Main Street Prosecuting Attorney Perry, Ohio 44081 Ashtabula County Courthouse Jefferson, Ohio 44047 State of Ohio Public Utilities Comission Eileen M. Buzzelli 180 East Broad Street The Cleveland Electric Columbus, Ohio 43266-0573 Illuminating Company P. O. Box 97 E-210 Mr. Murray R. Edelman Perry, Ohio 44081 Centerior Energy 6200 Oaktree Blvd.

Independence, Ohio 44131

,