ML20210G544

From kanterella
Revision as of 03:42, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Change Notice 1 to Rev 3 to Instruction QI-045, Reinsp Procedures for Structural Steel
ML20210G544
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/24/1986
From: Patterson A, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20210F162 List:
References
QI-045-01, QI-45-1, NUDOCS 8702110293
Download: ML20210G544 (2)


Text

a >

Pega 1 of 2

\ -

n

./N, V EVALUATION RESEARCH CORPORATION MCORROLLED copy COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE 001 INSTRUCTION N0' QI-045 REVISION NO: 3 ISSUE DATE: 10/24/86

~

\

(Q REINSPECTION PROCEDURES FOR STRUCTURAL STEEL The QI identified above is hereby changed as shown on the attached pages of this notice.

Prepared by: Date: MO8 f l

U '

Approved by: /W/NM. Dater / " D'Id Issue Coordinator Approved by: '

Date: /deO//-Yd On-Site Q p presentative Approved by: Date: '

h '

yQCReviewTeamLeadcr 8702110293 870126 PDR ADOCK 05000445

_..A PDR_ _ _ __ _ _ _ _ _ _. _ ,_ _ _ _ _ _ . _ , _ . , __. _

. .s8

- u.j _

Changs Notico 001 4

QI-045 ,

, Rev. 3

'l. Revise Note 5 to read:

The inspector should record the inspection tool code, on Attachment 6.14 for those tools used in the inspection. The information'is for possible future use and is not a requirement for these inspections.

The serial number and calibration due date of any torque wrench used for the inspection shall be recorded on Attachment 6.14 and is a requirement for these inspections.

I i

iO s

I I

l l

[

. O 2

_ _ _ . ~ _ - _ _ _ _ _ _ _ _ . . . - . - _ _ _ _ _ . _ _ _ _ _