ML20210H662

From kanterella
Jump to navigation Jump to search
Change Notice 1 to Rev 1 to Procedure CPP-027, Reinsp/ Documentation Review of Purchased Safety-Related Matl & Equipment
ML20210H662
Person / Time
Site: Comanche Peak  
Issue date: 10/23/1986
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20210F162 List:
References
CPP-027-01, CPP-27-1, NUDOCS 8702110457
Download: ML20210H662 (6)


Text

.

'o(

Page 1 of 2

\\

~

EVALUATION RESEARCH CORPORATION O

~

HCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE NO: 001 PROCEDURE N0; CPP-027 REVISION:

1 ISSUE DATE:

10/23/86 O

REINSPECTION / DOCUMENTATION REVIEW OF PURCHASED SAFE 1Y-RELATED' MATERIAL AND EQUIPMENT l

Prepared by:

~4 A/,

Date: /)<f 23 APs%,

f(/[$$!Y[

Approved by:

Date:

On-Site M epresentative

/

Approved by:

(;

J-3!M4 Date:

/O QN/QCReviewTaanpender

/

j' O

8702110457 870126 PDR ADOCK 05000445 A

PDR

,,----n-

'Y

~

t i [O Chtnge Notice-001 CPP-027 i

Revision:

I O

6.

Change Section 5.4.6 third paragraph to, read:

" Reference (3.7)"

1 D

O I

I I

I

(

l I

i O 1

2 l

=

INSTRUCTION SHEET (DAP's)

REMOVE INSERT NOTES Table of Contents Table of Contents Behind Tab Rev. 21 Rev. 23 Table of Contents List of Effective List of Effective Behind Tab

~

Addenda, Rev. 7 Addenda, Rev. 9 Table of Contents Design Adequacy Program Design Adequacy. Program Behind Tab Quality Assurance Program Quality Assurance Program Quality Assurance Rev. 1 Rev. 2 Program Civil / Structural Civil / Structural Behind Tab Discipline Instructions Discipline Instuctions Discipline Inst.

Table of Contents Table of Contents Rev. O, 7/3/86 Rev. 1, 11/12/86 DI-C/S-003 Behind DI-C/S-002 Mechanical Discipline Mechanical Discipline Behind Instructions Instructions DI-C/S-003 Table of Contents Table-of Contents Rev. O, 7/3/86 Rev. 2, 1/9/87 DAP-DI-M-001 Behind M-DI Rev. O, Addendum 1 Table of Contents DAP-DI-M001 Behind DAP-DI-M-001 Rev. 0, Addendum 1 DAP-DI-M002 Behind DAP-DI-M001 DI-M-003 Behind DAP-DI-M-002 Electrical Instrumentation Electrical Instrumentation and Control Discipline and Control Discipline DI-P-002 Instructions Instructions Rev. 1, 7/3/86 Rev. 2, 12/1/86 DAP-DI-EIC-003 Behind DI-EIC-002 DAP-2, Rev. 4 DAP-2, Rev. 5 Behind Tab DAP-2 DAP-7, Rev. 1 DAP-7, Rev. 2 Behind Tab DAP-7

' _-- _^ 1 ! ~; i^'

^~

l Rev 23: November 20,1986

,- 3 TABLE OF CONTENTS Revision Date POLICY STATEMENT 10/8/85 i

TABLE OF CONTENTS 23 11/20/86 LIST OF EFFECTIVE ADDENDA 8

II/17/86 QUALITY ASSURANCE PROGRAM 2

11/12/86 DISCIPLINE INSTRUCTIONS (See Discipline Instruction Tob)

DESIGN ADEQUACY PROCEDURES DAP-1 PREPARATION AND REVIEW OF 3

6/19/86 CRITERI A LISTS DAP-2 DOCUMENTATION AND TRACKING S

I1/7/86 OF ISSUES AND DISCREPANCIES DAP-3 DEVELOPMENT AND VALIDATION OF l

7/25/86 SELF-INITIATED REVIEW SCOPE DAP-4 PREPARATION OF CHECKLISTS 4

9/12/86 DAP-5 REVIEW OF CALCULATIONS, 3

9/12/86 EVALUATIONS AND OTHER IMPLEMENTING DOCUMENTS DAP-6 REVIEW OF DRAWINGS, 3

9/12/84 SPECIFICATIONS, AND OTHER DESIGN OUTPUT DOCUMENTS DAP-7 TRENDING AND GENERIC 2

Ii/7/86 IMPLICATIONS EVALUATIONS DAP-8 PREPARATION OF ENGINEERING 3

8/18/86 EVALUATIONS DAP-9 PREPARATION AND APPROVAL OF l

7/18/86 DISCIPLINE SPECIFIC RESULTS REPORTS AND DAP COLLECTIVE EVALUATION REPORT

~~~

-777~

~

TN-85-6262

~

h- ).

- - - - - - - - ~ '

^,

I l

Rev 23: November 20,1986

^

TABLE OF CONTENTS Revision Date DAP-10 DEVELOPMENT AND USE OF DAP 3

6/16/86 PROCEDURES AND DISCIPLINE INSTRUCTIONS DAP-lI DOCUMENT CONTROL 2

7/25/86 DAP-12 DAP INTERFACES AND 2

6/16/86 COMMUNICATIONS DAP-13 PREPARATION OF 1

S/28/86 CALCULATIONS DAP-14 DESIGN ADEQUACY PROGRAM 2

8/15/86 RECORDS DAP-15 TRAINING AND GUALIFICATIONS 2

8/l4/86 DAP-16 AUDITS 2

6/30/86

[Ol DAP-17 CORRECTIVE ACTIONS I

1/27/86 DAP-18 CONTROL OF SUBCONTRACTORS 0

7/14/86 DAP-19 PROCESSING AND REVIEW OF 3

8/l4/86 INFORMATION BETWEEN THE QUALITY OF CONSTRUCTION, GA/QC ADEQUACY PROGRAM AND THE DESIGN ADEQUACY PROGRAM DAP-20 DAP OVERVIEW OF ACTIVITIES 3

8/19/86 PERFORMED BY THE CPSES PROJECT OR OTHER EXTERNAL ORGANIZATIONS DAP-21 HOMOGENEOUS DESIGN ACTIVITY 0

12/9/85 VALIDATION AND SELECTION OF SPECIFIC ITEMS FOR REVIEW DAP-22 PREPARATION OF SAFETY I

9/18/86 SIGNIFICANCE EVALUATIONS DAP-23 DAP OUALITY ASSURANCE O

7/18/86 AUDITOR QUALIFICATIONS DAP-24 COMMUNICATION OF POTENTIAL 0

9/18/86 A

SAFETY CONCERNS V

TN-85-6262

I Rev: 9 12/24/86 COMANCIE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURES LIST OF EFFECTIVE ADDENDA DAP #

Revision Addendum Effective Date 9

I I

9/15/86 12 2

1 9/15/86 21 0

1 1/29/86 21 0

2 9/5/86 DI-M-001 0

1 12/23/86 J

l O

,,s,

, ;-7;.

m ;m. P,

TN-85-6262 i,0}[thi (L5b~bCF/

  • . 'ig..

' 57 M.M1. _...

t

~

, - _.. ~.

-