ML20210H662

From kanterella
Jump to navigation Jump to search
Change Notice 1 to Rev 1 to Procedure CPP-027, Reinsp/ Documentation Review of Purchased Safety-Related Matl & Equipment
ML20210H662
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/23/1986
From: Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20210F162 List:
References
CPP-027-01, CPP-27-1, NUDOCS 8702110457
Download: ML20210H662 (6)


Text

.

'o

(

Page 1 of 2

\ l 1

~

EVALUATION RESEARCH CORPORATION O i

~

HCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE NO: 001 PROCEDURE N0; CPP-027 REVISION: 1 ISSUE DATE: 10/23/86 O -

REINSPECTION / DOCUMENTATION REVIEW OF PURCHASED SAFE 1Y-RELATED' MATERIAL AND EQUIPMENT l

Prepared by: ~4 A/, '

Date: /)<f 23 APs%,

Approved by:

On-Site M epresentative Date: f(/[$$!Y[

/ '

Approved by: (; Date: /O J-3!M4 QN/QCReviewTaanpender / j' O

8702110457 870126 PDR ADOCK 05000445 A PDR

-- - .- ,,----n- - - -

~

'Y t

i [O Chtnge Notice-001 CPP-027 i

Revision: I .

O

6. Change Section 5.4.6 third paragraph to, read:

" Reference (3.7)"

1 D

I O

I I

I

(

l I

iO 1

2 l =

INSTRUCTION SHEET (DAP's)

REMOVE INSERT NOTES Table of Contents Table of Contents Behind Tab Rev. 21 Rev. 23 Table of Contents List of Effective List of Effective ~

Behind Tab Addenda, Rev. 7 Addenda, Rev. 9 Table of Contents Design Adequacy Program Design Adequacy. Program Behind Tab Quality Assurance Program Quality Assurance Program Quality Assurance Rev. 1 Rev. 2 Program Civil / Structural Civil / Structural Behind Tab Discipline Instructions Discipline Instuctions Discipline Inst.

Table of Contents Table of Contents Rev. O, 7/3/86 Rev. 1, 11/12/86 DI-C/S-003 Behind DI-C/S-002 Mechanical Discipline Mechanical Discipline Behind Instructions Instructions DI-C/S-003 Table of Contents Table-of Contents Rev. O, 7/3/86 Rev. 2, 1/9/87 DAP-DI-M-001 Behind M-DI Rev. O, Addendum 1 Table of Contents DAP-DI-M001 Behind DAP-DI-M-001 Rev. 0, Addendum 1 DAP-DI-M002 Behind DAP-DI-M001 DI-M-003 Behind DAP-DI-M-002 Electrical Instrumentation Electrical Instrumentation and Control Discipline and Control Discipline DI-P-002 Instructions Instructions Rev. 1, 7/3/86 Rev. 2, 12/1/86 DAP-DI-EIC-003 Behind DI-EIC-002 DAP-2, Rev. 4 DAP-2, Rev. 5 Behind Tab DAP-2 DAP-7, Rev. 1 DAP-7, Rev. 2 Behind Tab DAP-7

^~ '

' _-- _^ 1 ! ~; i^'

l Rev 23: November 20,1986

,- 3 TABLE OF CONTENTS Revision Date )

POLICY STATEMENT -

10/8/85 i TABLE OF CONTENTS 23 11/20/86 LIST OF EFFECTIVE ADDENDA 8 II/17/86 QUALITY ASSURANCE PROGRAM 2 11/12/86 DISCIPLINE INSTRUCTIONS (See Discipline Instruction Tob)

DESIGN ADEQUACY PROCEDURES DAP-1 PREPARATION AND REVIEW OF 3 6/19/86 CRITERI A LISTS DAP-2 DOCUMENTATION AND TRACKING S I1/7/86

, OF ISSUES AND DISCREPANCIES DAP-3 DEVELOPMENT AND VALIDATION OF l 7/25/86 SELF-INITIATED REVIEW SCOPE DAP-4 PREPARATION OF CHECKLISTS 4 9/12/86 DAP-5 REVIEW OF CALCULATIONS, 3 9/12/86 EVALUATIONS AND OTHER IMPLEMENTING DOCUMENTS DAP-6 REVIEW OF DRAWINGS, 3 9/12/84 SPECIFICATIONS, AND OTHER DESIGN OUTPUT DOCUMENTS DAP-7 TRENDING AND GENERIC 2 Ii/7/86 IMPLICATIONS EVALUATIONS DAP-8 PREPARATION OF ENGINEERING 3 8/18/86 EVALUATIONS DAP-9 PREPARATION AND APPROVAL OF l 7/18/86 DISCIPLINE SPECIFIC RESULTS REPORTS AND DAP COLLECTIVE EVALUATION REPORT

~~~

-777~ ' ~

TN-85-6262 _

,! ~

h- ) . .

._..'. ^,

- - - - - - - - ~ '

I l l Rev 23: November 20,1986 ,

^

TABLE OF CONTENTS Revision Date DAP-10 DEVELOPMENT AND USE OF DAP 3 6/16/86 PROCEDURES AND DISCIPLINE INSTRUCTIONS DAP-lI DOCUMENT CONTROL 2 7/25/86 DAP-12 DAP INTERFACES AND 2 6/16/86 COMMUNICATIONS DAP-13 PREPARATION OF 1 S/28/86 CALCULATIONS DAP-14 DESIGN ADEQUACY PROGRAM 2 8/15/86 RECORDS DAP-15 TRAINING AND GUALIFICATIONS 2 8/l4/86 DAP-16 AUDITS 2 6/30/86 DAP-17 CORRECTIVE ACTIONS I 1/27/86

[Ol DAP-18 CONTROL OF SUBCONTRACTORS 0 7/14/86 DAP-19 PROCESSING AND REVIEW OF 3 8/l4/86 INFORMATION BETWEEN THE QUALITY OF CONSTRUCTION, GA/QC ADEQUACY PROGRAM AND THE DESIGN ADEQUACY PROGRAM DAP-20 DAP OVERVIEW OF ACTIVITIES 3 8/19/86 PERFORMED BY THE CPSES PROJECT OR OTHER EXTERNAL ORGANIZATIONS DAP-21 HOMOGENEOUS DESIGN ACTIVITY 0 12/9/85 VALIDATION AND SELECTION OF SPECIFIC ITEMS FOR REVIEW DAP-22 PREPARATION OF SAFETY I 9/18/86 SIGNIFICANCE EVALUATIONS DAP-23 DAP OUALITY ASSURANCE O 7/18/86 AUDITOR QUALIFICATIONS DAP-24 COMMUNICATION OF POTENTIAL 0 9/18/86 A SAFETY CONCERNS V

TN-85-6262

I Rev: 9 12/24/86 COMANCIE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURES LIST OF EFFECTIVE ADDENDA DAP # Revision Addendum Effective Date 9 I I 9/15/86 12 2 1 9/15/86 21 0 1 1/29/86 21 0 2 9/5/86 DI-M-001 0 1 12/23/86 J

l O TN-85-6262

, ,,s,

, ;-7;.

i,0}[thi (L5b~bCF/

, m ;m. P ,

t

  • . 'ig.. ' 57 M .M1. _...

~

- - - _ . , - - - - - - . -,