ML20210H662
| ML20210H662 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/23/1986 |
| From: | Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| CPP-027-01, CPP-27-1, NUDOCS 8702110457 | |
| Download: ML20210H662 (6) | |
Text
.
'o(
Page 1 of 2
\\
~
EVALUATION RESEARCH CORPORATION O
~
HCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE NO: 001 PROCEDURE N0; CPP-027 REVISION:
1 ISSUE DATE:
10/23/86 O
REINSPECTION / DOCUMENTATION REVIEW OF PURCHASED SAFE 1Y-RELATED' MATERIAL AND EQUIPMENT l
Prepared by:
~4 A/,
Date: /)<f 23 APs%,
f(/[$$!Y[
Approved by:
Date:
On-Site M epresentative
/
Approved by:
(;
J-3!M4 Date:
/O QN/QCReviewTaanpender
/
j' O
8702110457 870126 PDR ADOCK 05000445 A
,,----n-
'Y
~
t i [O Chtnge Notice-001 CPP-027 i
Revision:
I O
6.
Change Section 5.4.6 third paragraph to, read:
" Reference (3.7)"
1 D
O I
I I
I
(
l I
i O 1
2 l
=
INSTRUCTION SHEET (DAP's)
REMOVE INSERT NOTES Table of Contents Table of Contents Behind Tab Rev. 21 Rev. 23 Table of Contents List of Effective List of Effective Behind Tab
~
Addenda, Rev. 7 Addenda, Rev. 9 Table of Contents Design Adequacy Program Design Adequacy. Program Behind Tab Quality Assurance Program Quality Assurance Program Quality Assurance Rev. 1 Rev. 2 Program Civil / Structural Civil / Structural Behind Tab Discipline Instructions Discipline Instuctions Discipline Inst.
Table of Contents Table of Contents Rev. O, 7/3/86 Rev. 1, 11/12/86 DI-C/S-003 Behind DI-C/S-002 Mechanical Discipline Mechanical Discipline Behind Instructions Instructions DI-C/S-003 Table of Contents Table-of Contents Rev. O, 7/3/86 Rev. 2, 1/9/87 DAP-DI-M-001 Behind M-DI Rev. O, Addendum 1 Table of Contents DAP-DI-M001 Behind DAP-DI-M-001 Rev. 0, Addendum 1 DAP-DI-M002 Behind DAP-DI-M001 DI-M-003 Behind DAP-DI-M-002 Electrical Instrumentation Electrical Instrumentation and Control Discipline and Control Discipline DI-P-002 Instructions Instructions Rev. 1, 7/3/86 Rev. 2, 12/1/86 DAP-DI-EIC-003 Behind DI-EIC-002 DAP-2, Rev. 4 DAP-2, Rev. 5 Behind Tab DAP-2 DAP-7, Rev. 1 DAP-7, Rev. 2 Behind Tab DAP-7
- ' _-- _^ 1 ! ~; i^'
^~
l Rev 23: November 20,1986
,- 3 TABLE OF CONTENTS Revision Date POLICY STATEMENT 10/8/85 i
TABLE OF CONTENTS 23 11/20/86 LIST OF EFFECTIVE ADDENDA 8
II/17/86 QUALITY ASSURANCE PROGRAM 2
11/12/86 DISCIPLINE INSTRUCTIONS (See Discipline Instruction Tob)
DESIGN ADEQUACY PROCEDURES DAP-1 PREPARATION AND REVIEW OF 3
6/19/86 CRITERI A LISTS DAP-2 DOCUMENTATION AND TRACKING S
I1/7/86 OF ISSUES AND DISCREPANCIES DAP-3 DEVELOPMENT AND VALIDATION OF l
7/25/86 SELF-INITIATED REVIEW SCOPE DAP-4 PREPARATION OF CHECKLISTS 4
9/12/86 DAP-5 REVIEW OF CALCULATIONS, 3
9/12/86 EVALUATIONS AND OTHER IMPLEMENTING DOCUMENTS DAP-6 REVIEW OF DRAWINGS, 3
9/12/84 SPECIFICATIONS, AND OTHER DESIGN OUTPUT DOCUMENTS DAP-7 TRENDING AND GENERIC 2
Ii/7/86 IMPLICATIONS EVALUATIONS DAP-8 PREPARATION OF ENGINEERING 3
8/18/86 EVALUATIONS DAP-9 PREPARATION AND APPROVAL OF l
7/18/86 DISCIPLINE SPECIFIC RESULTS REPORTS AND DAP COLLECTIVE EVALUATION REPORT
~~~
-777~
~
TN-85-6262
~
h- ).
- - - - - - - - ~ '
^,
I l
Rev 23: November 20,1986
^
TABLE OF CONTENTS Revision Date DAP-10 DEVELOPMENT AND USE OF DAP 3
6/16/86 PROCEDURES AND DISCIPLINE INSTRUCTIONS DAP-lI DOCUMENT CONTROL 2
7/25/86 DAP-12 DAP INTERFACES AND 2
6/16/86 COMMUNICATIONS DAP-13 PREPARATION OF 1
S/28/86 CALCULATIONS DAP-14 DESIGN ADEQUACY PROGRAM 2
8/15/86 RECORDS DAP-15 TRAINING AND GUALIFICATIONS 2
8/l4/86 DAP-16 AUDITS 2
6/30/86
[Ol DAP-17 CORRECTIVE ACTIONS I
1/27/86 DAP-18 CONTROL OF SUBCONTRACTORS 0
7/14/86 DAP-19 PROCESSING AND REVIEW OF 3
8/l4/86 INFORMATION BETWEEN THE QUALITY OF CONSTRUCTION, GA/QC ADEQUACY PROGRAM AND THE DESIGN ADEQUACY PROGRAM DAP-20 DAP OVERVIEW OF ACTIVITIES 3
8/19/86 PERFORMED BY THE CPSES PROJECT OR OTHER EXTERNAL ORGANIZATIONS DAP-21 HOMOGENEOUS DESIGN ACTIVITY 0
12/9/85 VALIDATION AND SELECTION OF SPECIFIC ITEMS FOR REVIEW DAP-22 PREPARATION OF SAFETY I
9/18/86 SIGNIFICANCE EVALUATIONS DAP-23 DAP OUALITY ASSURANCE O
7/18/86 AUDITOR QUALIFICATIONS DAP-24 COMMUNICATION OF POTENTIAL 0
9/18/86 A
SAFETY CONCERNS V
TN-85-6262
I Rev: 9 12/24/86 COMANCIE PEAK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURES LIST OF EFFECTIVE ADDENDA DAP #
Revision Addendum Effective Date 9
I I
9/15/86 12 2
1 9/15/86 21 0
1 1/29/86 21 0
2 9/5/86 DI-M-001 0
1 12/23/86 J
l O
,,s,
, ;-7;.
m ;m. P,
TN-85-6262 i,0}[thi (L5b~bCF/
- . 'ig..
' 57 M.M1. _...
t
~
, - _.. ~.
-