' age 1 of 5 6

f V

EVALUATION RESEARCH CORPORATION

,?

- -~

m,?"

3.__

.a--

JG""*'

COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII b.3 INSTRUCTION NO.: QI-037 REVISION: 2 EFFECTIVE DATE: 10-10-86 REINSPECTION OF PIPE SUPPORTS TRT ISSUES-PIPE SUPPORTS IN ROOM 77N, SAFEGUARDS BLDG., UNIT 1 s

7 M!86 Prepared by:

e Date:

Issue Coordinator

/

/

w Approved by:

Date:

1 ilardware Supervisor Approved by:

Date:

/d 8 ((

On-Site QA Rep ntative

/

Approved by:

kf\\

/0 [1O !/76 Date:

QA/QCReviewTeamLegder

/

8702110265 860926 PDR ADOCK 05000445

^

PDR

4 QI-037 Rev. 2 1.0 PURPOSE To provide the methods _and requirements for the visual reinspection of pipe supports by the QA/QC Inspection Team for the purpose of verifying the validity of deficiencies identified by the Technical Review Team (TRT).

2.0 APPLICABILITY This procedure is applicable to the pipe' supports identified in population items list "TRT Issues-Pipe Supports In Room 77N, Safeguard Building Unit 1."

3.0 REFERENCES

3.1 Memo QA/QC-RT-3813 to M. Obert delineating documentation used in the development of this procedure including specific sources for attributes.

3.2 CPP-009. " Performance of Reinspection and Documentation Reviews."

4.0 GENERAL 7s(

4.1 Responsibilities A.

QA/QC Discipline Engineers The QA/QC Discipline Engineers prepare the inspection procedure delineating reinspection requirements and attributes.

B.

QA/QC Inspectors QA/QC Inspectors perform reinspection / verification in accordance with Ref. 3.2 and this inspection procedure.

The results shall be documented on checklist (Attachment 6.4).

4.2 Policy Activities performed under this procedure shall conform to the policies contained in the latest Comanche Peak Response Team Program Plan and Issue-Specific Action Plan (s).

l l

O l

2

4 QI-037 Rev. 2 5.0 INSTRUCTION

\\.

i.

4 NOTES: 1. 'The inspector shall indicate the inspection tools used (and serial number / calibration date when applicable) by filling in the Attachment 6.5.

The tool. codes required by Attachment 6.5 are listed on.6.

j 2.

Additional space is provided on Attachment 6.7 for supplemental remarks.

l 5.1 Support Identification 5.1.1 Verify that the support is permanently marked with the (1) support mark number.

Identification may have been accomplished by die stamping, vibro. etching or nameplate securely fastened to support structure.

5.1.2 Verify that the installed support components, mark (1) number and configuration are the same as shown on the design drawings (DWG) or component modification card (CMC). Detail dimensional checks are not a requirement for support identification purposes, however, they may be checked to the extent necessary to identify the support.

5.2 Pipe Clamp Halves Parallel 5.2.1 Verify that pipe clamps halves are parallel. For (2) acceptance criter,ta see Attachment 6.1.

5.2.2 MeasureandrecordthedimensionsshownonAttachment (2) 6.1.

5.3 Spherical Bearing Gap

\\

5.3.1 Verify bracket / pipe clamp has installed bearing n

(3) spacers.

It is acceptable to have one spacer.

f' Record the number of spacers on each side of the spherical bearing on Attachment 6.2.

5.3.2 Verify that the resultant gap (see Attachment 6.2)

(3) between the spherical bearing and the bracket or clamp is less than the thickness of the thinnest installed spacer. Record the resultant gap to the nearest 1/32

[

inch on Attachment 6.2.

i l

l 5.3.3*Ifthereifmorethanonesizespacerorifthespacer thickness.Is not as shown on Attachment 6.2, record the nominal thickness of each installo.d spacer to the l

nearest f/32 inch on Attachment 6.2.

/*

l (m,

  • NOTE:

This is not an accept / reject criteria.

l l

3

4 QI-037 Rav. 2 5.0 INSTRUCTION (Cont'd) 5.4 " Snubber Adapter Plate Bolt Thread Engagement Length 5.4.1 Verify minimum thread engagement of bolting in adapter (4) plate. Snubber sizes 1/4 and 1/2 are inaccessible for this inspection. When these sizes are. encountered, enter N/A on the reinspection checklist and note the snubber size in remarks. Acceptance criteria is as follows:

Snubber Size 1

3 10 35 100 Thread Engagement 5/16" 5/16" 9/16" N/A N/A 5.4.2 Record the nominal thickness of the snubber adapter plate, nominal bolt diameter and depth of bolt recess for each' recessed bolt as shown on Attachment 6.3.

5.5 Pin and Bolt Locking Devices *

  • NOTE: The pins, bolts, and stuis to be inspected for locking devices are shown on Attachment 6.8.

5.5.1 Verify that cotter pins and snap rings are in place (5)

(see Attachment 6.8).

(T 5.5.2 Verify that the cotter pins are fully opened.

They

\\s l (5) should be the maximum size the hole will-accommodate.

i 5.5.3 Verify that the load bolts are provided with (5) locking devices (see Attachment 6.8).

Verify all other threaded fasteners, except SA-193 and SA-325 Bolting Materials and Hilti Bolts, are provided with locking devices as shevn in the design drawing.

When not specified on DWG/ CMC the locking device will be one'of the following:

t lock nuts jam nuts drilled and wired nuts l

upset threads. Record the distance from i

the top of the nut to the upset thread in the j

remarks column of the checklist. At least two thread cross sections should be deformed in at least two places approximately 180*

apart.

l

\\lO 4

i

~-

4 QI-037 Rev. 2

(

5.0 INSTRUCTION (Cont'd)

'N 5.5.4 Verify safety wire on snubber bolts is installed, is (5) not damaged and is crimped.

(Except for size 35 and 100 snubbers which do not utilize wire.)

5.5.5 Record legible identification markings on snubber (5) bolt heads.in remarks.

If no identification marks are present, state so in remarks.

If identification marks are illegible, state so in remarks. -This is for information only and is not an accept / reject criteria.

4 6.0 ATTACHMENTS 6.1 Pipe Clamp Halves Parallelism 6.2 Spherical Bearing Gap-S y Struts and Snubbers 6.3 Snubber Adapter Plate Bolt Thread Engagement Length 6.4 Inspection Checklist 6.5 Inspector Tools Used e

6.6 Inspection Tools and Codes 6.7 Supplemental Remarks 6.8 Pins and Bolts / Studs i

l I

t I

i O

5

4 A : achmant 6.1 QI-037 Rev. 2 Page 1 of 1 O

COMANCHE PEAK REVIEW TEAM INSPECTION CHECKLIST VERIFICATION PACKAGE NO.

I-S-PS7N HANGER MARK NO./ DRAWING NO.

PIPE CLAMP HALVES PARALLELISM ENTER ALL DIMENSIONS, TO NEAREST 1/32", IN INCHES 1

2 3

S1 S2 A

Si and S2 dimensions are taken at opposite sides of the clamp.

B

  • Comments:

"S** dimensions on the same side of the clamp at points 1, 2 and 3 shall be within 1/16" of each other to be acceptable. Also, the clamp shall be not more than 1/16" out of parallel from side to side at points 1, 2 and 3 to be acceptable.

fat coups, es saac pm)

(AT tw o es ei,4

,)

C1 casusa a uwe)- -,,

SiOG Of CLAP 1A

=

S r9 M II es 1:

+

i

/

H tr Jj w a'

\\

u

/

- A

=

I O'

J-Inspector Date

e Attachmant 6.2 QI-037 Rev. 2 Page 1 of 3 m-COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO.

I-S-PS7N HANGER MARK NO./ DRAWING NO.

SNUBBER / STRUT SERIAL NO.

SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS FORWARD BRACKET / PIPE CLAMP AND BEARING wQ

-o SPACER NUMBER OF SPACERS INSTALLED ON gI%

NOMINAL EACH SIDE OF SPHERICAL BEARING SN 6 THICKNESS gy SIDE G1 SIDE G2

/ /

y

/

O s' /

15 5 Hb

\\

sm. M'\\@b RESULTANT CAP =

s ens N

-qxxx, uI + G2 - RESut uNT gip l

1 BRAcke r OR PIPE CLMP OV Inspector Date l

l l._ _

achmsnt 6.2 QI-037 Rev. 2 m

COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST VERIFICATION PACKAGE NO.

I-S-PS7N HANGER MARA NO./ DRAWING NO.

SNUBBER / STRUT SERIAL NO.

SPHERICAL BEARING GAP - SWAY STRUTS AND SNUBBERS REAR BRACKET / PIPE CLAMP AND BEARING SPACER NUMBER OF SPACERS INSTALLED ON e--(

NOMINAL EACH SIDE OF SPEERICAL BEARING

-e ICUESS SIDE G1 SIDE G2 6, --+

+

$M406A cesmur C\\

?

v s & :ls

\\ '[") \\

s RESULTA!.T CAP =

\\l

  • 5ksa A.

h>C N

5

\\

G1 + c2 - RESULTANT GAP 4

...\\\\\\\\

/

BRACM& 7" OR PIPE CLMP Ob Inspector Date 2

a At:schment 6.2 QI-037 Rev. 2 COMANCHE PEAK REVIEW TEAM INSPECTOR CHECKLIST j '

VERIFICATION PACKAGE NO.

HANGER MARK NO./ DRAWING NO.

SPHERICAL BEARING GAP - SWAY STRUTS ND SNUBBERS SPACER THICKNESSES XRB SIZE

  • SPACER THICKNESS EACH 06 08 1/8" 1/16" 10 3/32" i

12/14 3/32" 20 11/32" 24 5/16" 36 13/32" SPC PIPE CIAMP SIZE

  • SPACER THICKNESS EACH i

06 5/32" 08 3/32" 10 1/8" 12/14 3/16" 20 3/8" 24 3/8" 36 1/4" l

  • Nominal Dimensions I

I r

! O

,,-...e.--

e v

, -, - --r~w m m~---m-

~~w

~ ' - ' " " ~

At achmtnt 6.3 QI-037 Rev. 2 Page 1 of I COMANCHE PEAK REVIEW TEAM INSPECTION CHECKLIST VERIFICATION PACKAGE NO.,

HANGER MARK NO./ DRAWING NO.

~

SNUBBER SERIAL NO.

SNUBBER ADAPTER PLATE BOLT THREAD ENGAGEMENT LENGTH r

3-

[SOLT dg tp - nominal thickness

\\

-- J g

of snubber adapter plate.

D E

D - nominal bolt.

g A

3 a

d amater.

f d - depth of recess b

/

/

.eN ubSE R. //h)

N q

gpApyg SNupang

. ADN7ER PLATE BOLT tp D

dm t

1 2

l 3

4 lO Inspector Date

Attachmsnt 6.4 QI-UJ7 Rev. 2 INSPECTION CHECKLIST COMANCRE FEAE RESPONSE TEAM i

CHECELIST ForvLATION DESC VERIFICATION FKG No.

FIFE SUFFORTS I-$-PS7N NE 1 0F _4, QUALITY INSiiswi10N QI-037 QREINSFECTION Q UNIT 1 syutrnaus MARK / TAG NO.

[DOCUMENTATIONRETIEW Q UNIT Z O a = oW

~

VERIFICATION AMM ACCEPT R&7ECT DATE 1 Identification 2 Fipe Claep Halves Parallel 3 Spherical Bearing Cap

(

4 $nubber Adapter Flete Bolt Thread Engagement Length S Fin & Bolt / Stud Locking Device l

l i

I l

l l

FREFARED ST:

AFFi m mu B':

i

(

DISCIPLINE ENGR.

DATE LEAD DISCIFLINE DIGa.

DATE l

Laurmwamu ETs Arrauvan BY:

tsarawava UATE LEAD taarsw wu OAT E CFF-007.1A. Revision 0 l

1 i

l

. - -. _ -. ~.

_ _ _ _. =. _ _ _ _.

().5 QI-037 Rev. 2 I

INSPECTION TOOLS USED VERIFICATION PACKAGE NO.

I-S-PS7N

}

HANGER MARK NO./ DRAWING NO.

ATTRIBUTE TOOL CODE (s)

SER #/CALIB DUE DATE i

1.

Identification l

2.

Pipe Clamp Halves Parallel 3.

Spherical Bearing Cap 4.

Snubber Adapter i

Plate Bolt Thread Engagement Length I

e 5.

Pin and Bolt / Stud l

Locking Device l

I INSPECTOR DATE l

l

\\

O i'

,--,n,,,n _ __-_._

netachment 6.6 QI-037 Rev. 2 INSPECTION TOOL AND CODES CODE TOOL AF ANGLE FINDER BL BUBBLE LEVEL BS BOR0 SCOPE BW 1/32", 1/16", 3/32", 1/8" WIRE CG CONTOUR GAGE DF DRY FILM THICKNESS GAGE FG FEELER GAGES FL FLASHLIGHT IN FIBRE METAL FILLET GAGES GG GAL FILLET GAGES HL HI-LOW GAGE MG MAGNIFYING GLASS MI MICROMETERS MM MIRROR MN MAGNET

~

PB PLUM BOB PR PROTRACTOR SC SLIDE CALIPER SR 6" RULE ST STEEL TAPE MEASURE TG TAPER GAGE TW TORQUE WRENCH UD UNDERCUT GAGE (DIAL)

UP UNDERCUT GAGE (PIT)

VC VERNIER CALIPER VT INSPECTION O

-A

..e 2

m e,s.

...ae a

.m..

m-m 4

.a.

s 4

A:ttchment 6.7 i

QI-037 Rev. 2 N

Page 1 of 1 j

SUPPLEMENTAL REMARKS VERIFICATION PACKAGE NO.

~

HANGER MARK MO./ DRAWING NO.

W l

ATTRIBUTE (NO./ DESCRIPTION)

REMARKS 4

S J

b 4

{

l

' O 1

6 t

__..-.-.,--_,._,,m,..m,,-_,._m.

__,_._,.m_.m.__,

..8 QI-037 Rev. 2 O

PINS AND BOLTS / STUDS N

i 1.owsourtsrvolew

_L

/

)

U-N suffoMr O

SUPPORT STRUCTURhl /

Mem868 3

g i.ono sour /sruo/ Pin

~

< v l.. ~

.. b.

< =

3 (s~

Pipe q'Clerg i

1 4

_F.N

\\

8ocr/srup l0 l

l

.