ML20210G960
| ML20210G960 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/10/1986 |
| From: | Patterson A, Talbian J EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| QI-066-04, QI-66-4, NUDOCS 8702110356 | |
| Download: ML20210G960 (2) | |
Text
w c
Page 1 of 2 o
V EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c UNCONTROLLED COPY CHANGE NOTICE 004 INSTRUCTION NO.:.QI-066 REVISION:
1 ISSUE DATE:
11/10/86 REINSPECTION OF EQUIPMENT SUPPORTS The QI identified above is hereby changed as shown on the attached page of this notice.
Prepared by:
A
.D A Date:
G kjevmber 66, U
\\
Approved by: MPd M v d /d h Date:
///4/>"6 IssueCoordinftdr Approved by:
Date:
O-dd"8d On-Site QA Regtdsentative Approved by:
Date:
l'
@d QA/Q teview Team Lehder
/
/
8702110356 870126 PDR ADOCK 05000445 A
e.
Chs.ngs Notics 004 l
QI-066 Rev. 3
^
1.
Revise "5.0 INSTRUCTION" to read as follows:
" Measurements shall be made using standard inspection tools. Attachment 6.2 provides a list of standard inspection tools and their corresponding codes. The inspector should record on the checklist (Attachment 6.1) the tool code for tools used in the inspection. Where tools have serial numbers or calibration due dates, these shall be recorded on the checklist.
The information is for possible future use and is not a requirement for these inspections."
O O
2
.~,. _. _. _.. _._
.