ML20210G690
| ML20210G690 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/30/1986 |
| From: | Patterson A, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| QI-055-01, QI-55-1, NUDOCS 8702110313 | |
| Download: ML20210G690 (2) | |
Text
l.
g; Psgs 1 of 2 v
i
]
EVALUATION RESEARCH CORPORATION UNCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 INSTRUCTION NO.: QI-055 REVISION NO.: 2 ISSUE DATE:
10/30/86 REINSPECTION OF INSTRUMENT PIPE / TUBE SUPPORTS /I-S-INSP O
The QI identified above is hereby changed as shown on the attached page of this notice.
I
\\
~ Date: to 78 Prepared by:
x<
~
- (
N Approved by: d[dA///M Date:
/0/rf/'fd IssueCooptinator Approved by:
Date: /d "M-Ed On-Site QA Rgsentative M Z.9 h Approved by:
Date:
QA/
' Review Team Lead &r f
I l
8702110313 870126 PDR ADOCK 05000445 A
t
. g'
.2 I
t
.q'.'
e-Changs Notice: 001 '
QI-055 Revision 2 i
O 1.
Add the following sentence to Note 2 in the " Notes" section of the QI:
.With the exception of_ tools requiring calibration data, the information is for possible future use and is not a requirement for these inspections.
?
F 4
h i
4 I
I k
e i
4 l
i l
l
_