5, Page 1 of 2

  • 4

'J EVALUATION RESEARCH CORPORATION

~

UNCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE SPECIFIC ACTION PLAN VII.c

\\

CHANCE NOTICE 001 INSTRUCTION NO: QI-039 REVISION:

1 EFFECTIVE DATE: 11-25-86 O

REINSPECTION OF HVAC DUCTS AND PLENUMS l

l The QI identified above is hereby changed as shown on the attached pages of this notice.

loft!8[

Prepared by: I 11 toc Date:

QA/QC DiscipPine Engineer M*

Approved by:

Date:

Issue Coordinator Approved by:

Datei

// #4 7d On-Site Q @ epresentative

/

It ))o 3 (,

Approved by:

[A Date:

QA/fC Review TeamjLe'ader

/

/

hg05000445 7 870126 A

PDR

i Change Notice 001 Rev 1 QI-039

~

i 1.

Remove Attachment 6.1, Revision 1, page 3 of 3 and replace

.with' Attachment 6.1, Revision 1, Change Notice 001, page 3 of

~~

.3.

t 9

('

f.

l-e l

l~

1.

i I

1 i

1 -

1

/

s 1

i, 4

l l

4 s

2 i

l-i

I J

4

'd COMANCHE PEAK RESPONSE TEAM.1 CHECKLIST QI-039

[

Rev. 1 CN001 POPULATION DESC VERIFICATION PKG NO.

HVAC Ducts and, Plenums

-I-M-DUPL PAGE L OF 1 VERIFICATION A

ACCEPT REJECT DATE 11; Tubing Connection

a. Installation
b. Nuts and bolts
12. Pipe Connection
a. Pipe Size
b. Pipe Length
13. Instrument Mounting

^

a. Installation
b. Mounting 3 racket
c. Aats, Bolts and Washers f
14. Plenues s
a. Location
b. Sheet Metal Gage
c. Reinforcing Angle Size
d. Reinforcing Angle Spacing
e. Gasket
f. Nuts and Bolts
15. Flexible Connection
a. Location
b. Companion Angle Size
c. Nuts, Bolts and l

Washers

d. Misalignment l

l t

2 l

..E' _~'!':' ') hJY P?? *.. --.--, - _ _ _ - - _

l

INSTRUCTION SHEET.

(CPP's)

REMOVE

' INSERT NOTES Table of Contents Table of contents 09/17/86 10/16/86 CPP-010, Rev. 7 In front of Change Notice 002 CPP-010, Rev. 7 Change Notice 001 CPP-011, Rev. 2 In front of Change Notice 002 CPP-011, Rev. 2 Change Notice 001 CPP-012, Rev. 2 In front of Change Notice 001 CPP-012, Rev. 2 CPP-012, Rev. 2 In front of Change Notice 002 CPP-012, Rev. 2 Change Notice 001 CPP-013, Rev. 1 CPP-013, Rev. 1

' Notice of Cancellation CPP-014, Rev. 2 CPP-014, Rev. 3 CPP-016, Rev. 3 In front of Change Notice 001 CPP-016, Rev. 3 CPP-017, Rev. 2 In front of Change Notice 001 CPP-017, Rev. 2 CPP-020, Rev. 2 CPP-020, Rev. 2 Change Notice 001 CPP-027, Rev. 1 Behind CPP-026, Rev. O CPP-027, Rev. 1 CPP-027, Rev. 1 Change Notice 001

'l

_..J

I

,o h/

]

Page 1 of 2 l

COMANCHE PEAK RESPONSE TEAM QA/QC REVIEW TEAM PROJECT PROCEDURES TABLE OF CONTENTS UNCONTi101. LED COPY 10-16-86 CPP TITLE CHANGE NUMBER REV DATE NOTICE DATE Table of Contents 10-16-86 CPP-001 Preparation of Project 2

01/07/86 1

02/18/86 Procedures and Quality 2

07/08/86 Instructions CPP-002 Correspondence Control 1

01/07/86 CPP-003 Indoctrination. Training and 3

12/10/85 1

03/24/86 Certification of Personnel 2

04/17/86 O

3 06/25/86 4

07/11/86 CPP-004 Project Working Files 2

12/17/85 CPP-005 Establishing Population 3

05/28/86 1

08/21/86 CPP-006 Sample Selection 2

01/30/86 CPP-007 Preparation of Checklists 2

01/07/86 1

02/21/86 and Data Base Reports CPP-008 Preparation of Verification 2

01/07/86 1

06/30/86 l

Packages CPP-009 Performance of Reinspections 4

01/17/86 and Documentation Reviews CPP-010 Preparation of Deviation 7

05/12/86 1

05/15/86 li Reports 2

10/03/86 l

CPP-011 Evaluations of Adverse Trend 2

08/21/86 1

09/09/86 Analyses, Construction 2

10/03/86 Deficiencies and QA/QC Program Deficiencies CPP-012 QA/QC Interface with 2

07/31/86 1

10/03/86 Constructor and TUGC0 2

11/10/86 5057-C/ERCOLD

$l Page 2 of 2 o

CPP TITLE CHANGE NUMBER REV DATE NOTICE DATE CPP-013 Cancelled 10/03/86 CPP-014 Collective Evaluation of 3

10/03/86 Construction QA/QC Program

- and Quality of Construction 4

CPP-015 SpecialEvaluationTeam(SET) 0 07/22/85 (Limited Distribution) l CPP-016 Safety Significance 3

09/17/86 1

10/03/86 Evaluations of Deviations Reports CPP-017 Preparation of QA/QC Program 2

08/13/86 1

10/23/86 Deviation Reports CPP-018 QA/QC Interface with the 1

01/29/86 1

07/24/86 Design Adequacy Program CPP-019 Cancelled 05/16/86

- CPP-020 Out-of-Scope Observations 2

09/12/86-1 10/03/86 CPP-021 CPSES Pmject Corrective 1

08/13/86 1

09/09/86 Action CPP-022 Supplementary Evaluation of 0

09/27/85 1

05/21/86 Visual Welding Inspection i

Techniques CPP-023 Category I Programatic ISAP' 0 01/30/86 Instructions / Checklists CPP-024 Issue-Specific Action Plan 0

03/18/86 1

04/04/86 Revisions CPP-025 QC Inspector Qualification 0

03/31/86 1

10-08-86 Evaluation CPP-026 Final Review of ISAP VII.c 0

07/23/86 1

07/30/86 Working Files 2

08/14/86 j

CPP-027 Reinspection / Documentation 1

10/16/86 1

10/23/86 Review of Purchased Safety-Related Material and Equipment O

5057-C/ERCOLD

.--._-._,._,-,v-.,,,,

._,-.r.__..-._...-,,.

_.-..--__..,_.,,m__.

-