f Page 1 of 2 Ob EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLANS CHANGE NOTICE: 002 PROCEDURE NO.: CPP-010 REVISION NO.:
7 ISSUE DATE: 10-03-86 f
l PREPARATION OF DEVIATION REPORTS The CPP identified above is hereby changed as shown on the attached page of this notice.
g2110391 870126 A
ADOCK 05000445 PDR
/0[/[84F Prepared by:
s Date:
Approved by Date:
M-9/-74 On-Site Representative qgILa uhk A,Pr.v.d,,:
0.t.:
QAi,.v..,.a.t..d.r
Change Notice 002 CPP-010 Revision:
7 1.
Change Section 2.0, in part, to read:
"... purchased safety-related equipment and material as well as safety-related hardware...."
2.
Add Reference 3.8 as follows:
"3.8 CPP-027, Reinspection / Documentation Review for Purchased Safety-Related Material and Equipment."
3.
Change the footnote on pages 6, 9, 11, add 2 of Attachment 6.1 to read:
"* For ISAP VII.b.2, VII.b.3, and VII.c, this.may be accomplished upon transmittal of the Verification Package in accordance with Reference 3.4.
Also see Paragraph 5.3.1.
For ISAP VII.a.9 this will be accomplished upon the transmittal of the verification package in accordance with Reference 3.8."
4.
Change the second^ paragraph in Section 5.1 to read:
" Inspectors shall identify the hardware associated with each s
(construction) deviation by attaching a tag in a conspicuous s
location."
Note: For ISAP VII.a.9, tags will be picced af ter the DR is validated in~accordance with Reference 3.8.
Tags shall, as a minimum, indicate:
DR NO:
(Number)
ID:
(Item Number ERC:
Signature of Inspector and Date)
O w
O
- ---