ML20210F463

From kanterella
Jump to navigation Jump to search
Change Notice 2 to Rev 1 to Instruction QI-012, Reinsp of Instrumentation Equipment/I-E-ININ
ML20210F463
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/26/1986
From: Merhan R, Patterson A, Zill R
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20210F162 List:
References
QI-012-02, QI-12-2, NUDOCS 8702110078
Download: ML20210F463 (2)


Text

,

Pcg] 1 ef 2 s

7-t v

EVALUATION RESEARCH CORPORATION ggccHTRGi. LED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN ISAP-VII.c CHANGE NOTICEt 002 INSTRUCTION NO.t QI-012 REVISION:

1 ISSUE DATEt 09/26/86 n

REINSPECTION OF INSTRUMENTATION EQUIPMENT /I-E-ININ

!\\"

The QI identified above is hereby changed as shown on the attached page of this notice.

7[IS[80 Prepared byt 2

Datet Approved byi M /./a i h / A h Datet

//g J//4 Issue Coca;didator Approved by:

Datet

.7 I

"OnfSite p epresentative

/

/

Approved by:

Datet

  1. 2 3

[

1

'/ 'C Review Team' Leader

'/

A

v 0702110070 070126 I

PDR ADOCK 05000445 l

A PDR l

]

f, 9

Chsngs Notico 002 yI-012

.i Rev. 1 i

4 Section 5.0 Location Para. 2.2 Add the following sentence to the first paragraph.

i Horisontal and vertical dimensions shall be measured at i

the centerline of the instrument.

4 l

l 1

j s

I i

4 k

1 l

4 e

k 4

I l

1 4

t i

4 P

i L

i l

.i 1

I i

l t

i 4

L l

f I

i I

1 i

i f

l l

l 1'

i 2

I