ML20210F463
| ML20210F463 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/26/1986 |
| From: | Merhan R, Patterson A, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| QI-012-02, QI-12-2, NUDOCS 8702110078 | |
| Download: ML20210F463 (2) | |
Text
,
Pcg] 1 ef 2 s
7-t v
EVALUATION RESEARCH CORPORATION ggccHTRGi. LED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN ISAP-VII.c CHANGE NOTICEt 002 INSTRUCTION NO.t QI-012 REVISION:
1 ISSUE DATEt 09/26/86 n
REINSPECTION OF INSTRUMENTATION EQUIPMENT /I-E-ININ
!\\"
The QI identified above is hereby changed as shown on the attached page of this notice.
7[IS[80 Prepared byt 2
Datet Approved byi M /./a i h / A h Datet
//g J//4 Issue Coca;didator Approved by:
Datet
.7 I
"OnfSite p epresentative
/
/
Approved by:
Datet
- 2 3
[
1
'/ 'C Review Team' Leader
'/
A
- v 0702110070 070126 I
PDR ADOCK 05000445 l
A PDR l
]
f, 9
Chsngs Notico 002 yI-012
.i Rev. 1 i
4 Section 5.0 Location Para. 2.2 Add the following sentence to the first paragraph.
i Horisontal and vertical dimensions shall be measured at i
the centerline of the instrument.
4 l
l 1
j s
I i
4 k
1 l
4 e
k 4
I l
1 4
t i
4 P
i L
i l
.i 1
I i
l t
i 4
L l
f I
i I
1 i
i f
l l
l 1'
i 2
I