ML20210G445
| ML20210G445 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/29/1986 |
| From: | Beckford R, Patterson A EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| QI-042-02, QI-42-2, NUDOCS 8702110277 | |
| Download: ML20210G445 (2) | |
Text
{
Pega 1 of 2
. [O T
EVALUATION RESEARCH CORPORATION UNCONTROLLED COPY.
COMANCHE PEAK RESPONSE TEAM QUALITY INSPECTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 002 INSTRUCTION: QI-042 REVISION:
1 ISSUE DATE: 10/29/86 ex DOCUMENTATION REVIEW OF FIELD FABRICATED TANKS The QI identified above is hereby changed as shown on the attached page of this notice.
h C,T / 4. / Q 8 6 Prepared by:
Date:
ll Approved by: f/d/<[gM&///
Date:
/#/ 4/d%
Issue Coor @ tor Approved by:
Date:
/d 2,[
[y On-S fte epresentative
//
O Oth o4,4 A,pr.v.e b,:
eat.,
q Review Team' Leader
/
~/
G702110277 870126 PDR ADOCK 05000445 A
~
Chinga Notice 002 QI-042 Rev. 1
(^N)
Page 3, Attribute ID
('
The fi(st sent'ence of this attribute should read:
Verify that the 10 temporary foundation levelness readings are recorded and that the difference between any six (6) sequential readings is within plus or minus 1/8 inch, and that the difference between the maximum and minimum readings is within plus or minus 1/4 inch.
p O
l l
t 2
_ _