Text
(
I Pcg2 1 of 2 p
wl
~
EVALUATION RESEARCH CORPORATION UNCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 INSTRUCTION NO.: QI-019 REVISION NO.
4 ISSUE DATE: 11/06/86 f
\\
bl REINSPECTION OF SMALL BORE PIPE SUPPORTS The QI identified above is hereby changed as shown on the attached page of this notice, n
8 8
bo Prepared byt 20 ht%T AOu-Dates b V ocember Bb of
(}
\\
\\
5orr S S< Approved by:
"c'r/)d, A.4/MA7/dr7.-se Datet
////.,/56 Issue Coord(gafor Approved by:
Dates
/d-dd.Ed
)
on-Site QA RegAantative
['0 Approved by:
Dates
/d 6 2,7ete..a.seeeer
{
Chang 2 Notico QI-019 Rev. 4 1.
Revise Note 12 to read as follows:
f f
'\\m-
"The inspector should record inspection tool code from Attachment 6.18 on the inspection checklist for those tools used in the inspection. The information is for possible future use and is not a requirement for these inspections."
2.
Revise Note 33 to read as follows:
"The inspector shall ensure that torque wrenches used in inspections are properly calibrated. The serial numbers and/or calibration due dates shall be recorded on checklist."