Text
,
-g 1
EVALUATION RESEARCH CORPORAT
_,r'~
' N.]
COMANCHE PEAK RESPONSE TEAM A
QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c NOTICE OF CANCELLATION INSTRUCTION NO.t QI-009 REVISION: 3 a
EFFECTIVE DATE: 12/04/86 UNCONTROLLED COPY DOCUMENT REVIEW OF CONDUIT /R-E-CDUT
,C The QI identified above is hereby cancelled.
See page 2 for reasoning.
Prepared by:
Dates 12-2.- f4 s,
/
Approved by: M Als/MMa=u Datet _ _ /4/J/#4 Issue Coo fator Approved byt Datet_/M" OnlSite y Re'presentative Approved by:
Datet
/v 3 90 0
Q C Review Team' Leader
//
4 8702110054 070126 PDR ADOCK 05000445 A
-- - - -'-- --~~~~ ~~~
p-QI-009; c.
Rev. 3 v
u1
,v.-
Pcgsl2 of 2 O
All safety-related attributes for conduit, except conduit fabrication.-
are inspected in QI-008. The attribute for conduit fabrication would 4
have been examined in QI-009; exes;t that the. inspection of conduit fabrication is done on a surveillance basis, which is common industry i
practice, and the IR's associated with these inspections are written to t
document only that the surveillance was performed. The conduit numbers -
are not recorded on these IR's and, therefore, the identification of the conduits which were inspected during fabrication cannot be determined.
4 F
However, the adequacy of conduit fabrication will be evaluated in the conduit report based on data from the cable damage attribute of the cable population.
s Because document reviews do not obtain information that can be used relative to the adequacy of conduit fabrication, QI-009, all references and information relating,to QI-009, and all packages inspected to this document review QI are hereby cancelled.
i i
i i
t I
I i
l I
l L
b
<-=w,.--.w
.. -e--.
- - - -