ML20210G255
| ML20210G255 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/06/1986 |
| From: | Patterson A, Tablerian J, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| QI-027-01, QI-27-1, NUDOCS 8702110247 | |
| Download: ML20210G255 (2) | |
Text
f Page 1 of 2
(
q,/
EVALUATION RESEARCH CORPORATION UNCONTROLLED COPY >y COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 INSTRUCTION NO.: QI-027 REVISION:
3 ISSUE DATE:
11/06/86 O
REINSPECTION OF LARGE BORE PIPE SUPPORTS - RIGID The QI identified above is hereby changed as shown on the attached page of this notice.
Prepared by: Mk Ofu Date:
u ded% Ofo U'
- NM 6 Approved by: MM/,r,As MA /h/Mor Datet Issue Coorpt(ator Approved by:
Date
// -dd -ES On-Site QA Re @ sentative Approved by:
I Date:
- e 6 fC QA y.vi..,.
c.a.r 8702110247 870126 PDR ADOCK 05000445 A
Chtngs Notice 001 1
- QI-027 Rev. 3 1.
Revise Note 33 to read as follows:
h "The inspector should record inspection tool code shown on
..4 for those tools used in the inspection. The tool codes should be recorded on Attachment 6.3.
Where tools have serial numbers or calibration due dates, these shall be recorded on Attachmett 6.3.
The information is for possible future use and is not a requirement for these inspections."
2 V
O 2
_ _ _ _ _ _ __. _ _ _