ML20210G544
| ML20210G544 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/24/1986 |
| From: | Patterson A, Zill R EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20210F162 | List:
|
| References | |
| QI-045-01, QI-45-1, NUDOCS 8702110293 | |
| Download: ML20210G544 (2) | |
Text
a
\\
Pega 1 of 2 n
./N, V
EVALUATION RESEARCH CORPORATION MCORROLLED copy COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE 001 INSTRUCTION N0' QI-045 REVISION NO: 3 ISSUE DATE: 10/24/86
~
(Q
\\
REINSPECTION PROCEDURES FOR STRUCTURAL STEEL The QI identified above is hereby changed as shown on the attached pages of this notice.
Prepared by:
Date: MO8 f
U l
/W/NM.
/ " D'Id Approved by:
Dater Issue Coordinator Date:
/deO//-Yd Approved by:
On-Site Q p presentative Approved by:
Date:
h yQCReviewTeamLeadcr 8702110293 870126 PDR ADOCK 05000445
.. A PDR
..s8 u.j Changs Notico 001 4
QI-045 Rev. 3
'l.
Revise Note 5 to read:
The inspector should record the inspection tool code, on Attachment 6.14 for those tools used in the inspection. The information'is for possible future use and is not a requirement for these inspections.
The serial number and calibration due date of any torque wrench used for the inspection shall be recorded on Attachment 6.14 and is a requirement for these inspections.
I i
i O s
I I
l l
[
O 2
. ~
.