Change Notice 1 to Rev 1 to Instruction QI-039, Reinsp of HVAC Ducts & Plenums
ML20210H070
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/25/1986
From: Patterson A
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20210F162 List:
References
QI-039-01, QI-39-1, NUDOCS 8702110377
Download: ML20210H070 (6)


Text

5, Page 1 of 2

  • 4

'J ..

EVALUATION RESEARCH CORPORATION

~

UNCONTROLLED COPY COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE SPECIFIC ACTION PLAN VII.c

\

CHANCE NOTICE 001 INSTRUCTION NO: QI-039 REVISION: 1 EFFECTIVE DATE: 11-25-86 O

REINSPECTION OF HVAC DUCTS AND PLENUMS l

l The QI identified above is hereby changed as shown on the attached pages of this notice.

Prepared by: I 11 toc Date: loft!8[

QA/QC DiscipPine Engineer Approved by: * '

! M* Date:

Issue Coordinator Approved by:

On-Site Q @ epresentative Datei // #4' 7d

/

Approved by: [A Date: It ))o 3 (,

QA/fC Review TeamjLe'ader / /

7 870126 hg05000445 A

PDR

i Change Notice 001 Rev 1

..,. ~

QI-039 i

1. Remove Attachment 6.1, Revision 1, page 3 of 3 and replace

! .with' Attachment 6.1, Revision 1, Change Notice 001, page 3 of

.3.

~~

t 9

('

f.

l-e l

l~

1.

i I

1 i

1-1

/

s 1

i, 4

l l

4 s

2 i

l-i

I J >

4

'd COMANCHE PEAK RESPONSE TEAM Attachment 6.1 CHECKLIST QI-039

[ '

POPULATION DESC -

VERIFICATION PKG NO.

Rev. 1 CN001 HVAC Ducts and, Plenums -I-M-DUPL PAGE L OF 1 VERIFICATION A

ACCEPT REJECT DATE 11; Tubing Connection

a. Installation
b. Nuts and bolts
12. Pipe Connection
a. Pipe Size ,
b. Pipe Length *
13. Instrument ^

Mounting

a. Installation
b. Mounting 3 racket -
c. Aats, Bolts and Washers f  ; 14. Plenues s a. Location
b. Sheet Metal Gage
c. Reinforcing Angle Size
d. Reinforcing Angle Spacing -
e. Gasket
f. Nuts and Bolts
15. Flexible Connection
a. Location
b. Companion Angle Size

! c. Nuts, Bolts and l Washers

d. Misalignment l

l t

2 l . .E' l_~'!':' ') hJY P?? * .. -- .-- , - _ _ _ - - _ _ _ . - - - . . .

INSTRUCTION SHEET.

(CPP's)

REMOVE ' INSERT NOTES Table of Contents Table of contents 09/17/86 10/16/86 CPP-010, Rev. 7 In front of Change Notice 002 CPP-010, Rev. 7 Change Notice 001

. CPP-011, Rev. 2 In front of Change Notice 002 CPP-011, Rev. 2 Change Notice 001 CPP-012, Rev. 2 In front of Change Notice 001 CPP-012, Rev. 2 CPP-012, Rev. 2 In front of Change Notice 002 CPP-012, Rev. 2 Change Notice 001 CPP-013, Rev. 1 CPP-013, Rev. 1

' Notice of Cancellation CPP-014, Rev. 2 CPP-014, Rev. 3 CPP-016, Rev. 3 In front of Change Notice 001 CPP-016, Rev. 3 CPP-017, Rev. 2 In front of Change Notice 001 CPP-017, Rev. 2 CPP-020, Rev. 2 CPP-020, Rev. 2 Change Notice 001 CPP-027, Rev. 1 Behind CPP-026, Rev. O CPP-027, Rev. 1 CPP-027, Rev. 1 Change Notice 001

'l

_..J

,o I h/

] Page 1 of 2 l COMANCHE PEAK RESPONSE TEAM QA/QC REVIEW TEAM PROJECT PROCEDURES TABLE OF CONTENTS 10-16-86 UNCONTi101. LED COPY CPP TITLE CHANGE NUMBER REV DATE NOTICE DATE Table of Contents 10-16-86 CPP-001 Preparation of Project 2 01/07/86 1 02/18/86 Procedures and Quality 2 07/08/86 Instructions

CPP-002 Correspondence Control 1 01/07/86 CPP-003 Indoctrination. Training and 3 12/10/85 1 03/24/86 Certification of Personnel 2 04/17/86 O 3 4

06/25/86 07/11/86 CPP-004 Project Working Files 2 12/17/85 CPP-005 Establishing Population 3 05/28/86 1 08/21/86 CPP-006 Sample Selection 2 01/30/86 CPP-007 Preparation of Checklists 2 01/07/86 1 02/21/86 and Data Base Reports CPP-008 Preparation of Verification 2 01/07/86 1 06/30/86 l Packages CPP-009 Performance of Reinspections 4 01/17/86 and Documentation Reviews CPP-010 Preparation of Deviation 7 05/12/86 1 05/15/86 li Reports 2 10/03/86 l CPP-011 Evaluations of Adverse Trend 2 08/21/86 1 09/09/86 Analyses, Construction 2 10/03/86

, Deficiencies and QA/QC Program Deficiencies CPP-012 QA/QC Interface with 2 07/31/86 1 10/03/86 Constructor and TUGC0 2 11/10/86 5057-C/ERCOLD

$l

' Page 2 of 2 o .

CPP TITLE CHANGE NUMBER REV DATE NOTICE DATE CPP-013 Cancelled 10/03/86 CPP-014 Collective Evaluation of 3 10/03/86 Construction QA/QC Program

- and Quality of Construction 4

CPP-015 SpecialEvaluationTeam(SET) 0 07/22/85 (Limited Distribution) l CPP-016 Safety Significance 3 09/17/86 1 10/03/86 Evaluations of Deviations Reports CPP-017 Preparation of QA/QC Program 2 08/13/86 1 10/23/86 Deviation Reports CPP-018 QA/QC Interface with the 1 01/29/86 1 07/24/86 Design Adequacy Program

CPP-019 Cancelled 05/16/86

- CPP-020 Out-of-Scope Observations 2 09/12/86- 1 10/03/86 CPP-021 CPSES Pmject Corrective 1 08/13/86 1 09/09/86 Action CPP-022 Supplementary Evaluation of 0 09/27/85 1 05/21/86 i Visual Welding Inspection Techniques CPP-023 Category I Programatic ISAP' 0 01/30/86 Instructions / Checklists CPP-024 Issue-Specific Action Plan 0 03/18/86 1 04/04/86 Revisions CPP-025 QC Inspector Qualification 0 03/31/86 1 10-08-86 Evaluation CPP-026 Final Review of ISAP VII.c 0 07/23/86 1 07/30/86 Working Files 2 08/14/86 j CPP-027 Reinspection / Documentation 1 10/16/86 1 10/23/86 Review of Purchased Safety-Related Material and Equipment O

5057-C/ERCOLD

.--._-._,._,-,v-.,,,, ._,-.r.__..-._...-,,.

_ _.-..--__..,_.,,m__. , . , . - _ _ _ _ , _ _ , _ . - . . _ _ . . _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ , . - - . - . _