Forwards Insp Rept 50-423/87-10 on 870504-08.No Violations Noted
ML20215F142
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/15/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20215F145 List:
References
NUDOCS 8706220258
Download: ML20215F142 (2)


See also: IR 05000423/1987010

Text

..

'a=S

.1 h.

s

JUN 151981

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. E..J. Mroczka

Senior Vice President - Nuclear

Engineering and.0perations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection No. 50-423/87-10

This letter refers to~ the routine inspection conduct'ed by Mr. H. Gregg of this

office on May 4-8, 1987, at the Millstone Nuclear' Power Station, Unit 3,

Waterford, Connecticut. Mr. H. Gregg discussed the findings of the inspection

with Mr. C. Clement and other members of your staff at the conclusion of the-

inspection.

.The objective of.this inspection was to review your activities' related to

snubber visual surveillances and several previously identified problem items.

The previously identified problem items included Main Steam Safety Valve ring

settings, PORV. leakage,'and Control Room pressurization.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection,~no violations were observed.

!

No. reply to this letter is required. Your cooperation with us in this matter

is aopreciated.

!

l

Sincerely, j

$ [2go gg $ $ h 23

PDR.n gog g 4 c 6 7 tgW,

O ,.

1114m V. Johnston, Acting D ctor

Division of Reactor Safety -

Enclosure: NRC Region I Inspection Report No. 50-423/87-10 [ 4

,

OFFICIAL RECORD COPY IR MILL 3 87-10 - 0001.0.0 '

06/12/87

]

..

.

,

Northeast Nuclear Energy Co. 2

l

'

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing

S. E. Scace, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

L. Prividy, RI, BV-2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

R. Bores, DRSS

E. McCabe, DRP Section Chief 3B

L. Marsh, NRR

C. Y. Cheng, NRR

l

'

l

RI:DRS RI:DRS RI:DRS --

HGregg j JStrosnider JDurr

y5/26/87 J 5/2 6/87 6////87

0FFICIAL RECORD COPY IR MILL 3 87-10 - 0002.0.0

05/27/87