Discusses 880721 Request for Schedular Extension of Util Commitments Re Seismic Margin Evaluation.Proposed Schedule Change Acceptable
ML20248D744
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/30/1989
From: Hannon J
Office of Nuclear Reactor Regulation
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
References
REF-GTECI-A-17, REF-GTECI-A-40, REF-GTECI-A-44, REF-GTECI-EL, REF-GTECI-SC, REF-GTECI-SY, TASK-A-17, TASK-A-40, TASK-A-44, TASK-OR TAC-72197, NUDOCS 8904120023
Download: ML20248D744 (3)


Text

_ _ _ _ _ _

March 30, 1989 Docket No. 50-440 7 DISTRIBUTION:

eDocket Files: 1NRC & Local PDRs i

PDIII-3 r/f ~ "GHolahan MVirgilio JHannon TColburn PKreutzer Mr. Alvin Kaplan, Vice President OGC-WF1 EJordan Nuclear Group BGrimes ACRS(10) ,

The Cleveland Electric Illuminating PDIII-3 Gray GBagchi l Company DPersinko CThomas 10 Center Road Perry, Ohio 44081

Dear Mr. Kaplan:

SUBJECT:

SEISMIC MARGINS EVALUATION FOR THE PERRY NUCLEAR POWER PLANT, UNIT N0. 1 (TAC N0. 72197)

We have reviewed your July 21, 1988 request for schedular extension of your commitments relative to seismic margin evaluation (a plant's seismic capacity above the safe shutdown earthquake (SSE)) for the Perry Nuclear Power Plant.

Your original commitments to the Advisory Committee on Reactor Safeguards (ACRS) indicated that an analysis would be complete by the end of the first refueling outage and any required plant modifications would be implemented by the end of the second refueling outage. Your July 21, 1988 letter proposed the i following revision to that schedule: (1) Finalizing criteria and commencing '

preparatory work by the end of the first refueling outage, (2) completing the preparatory work, walkdowns and specific system /com by the end of the second refueling outage, and (3) ponent/ structure implementation of any.evaluations required modifications and final documentation by the end of the third refueling outage.

In support of your mquest, you provided information regarding your progress in this area, including work with the Seismicity Owners Group and Seismic Qualifi-cation Utility Group. You further indicated your desire to utilize NRC guidance (NUREG/CR's/4334, 4482 and 5073) and EPRI guidance in development of your program. Finally, you indicated a desire to integrate work on this issue with potentially interactive emergent NRC initiatives such as resolution of Unresolved Safety Issues USI A-17 Systems Interaction, USI A-40 Seismic Design Bases, USI A-44 Station Clackcut, and Eastern Seismicity issues.

The :,taff has consulted with the ACRS regarding your proposed schedule change.  ;

The ACRS has no objections to that change. Based upon the need to inject I industry and regulatory guidance into formulation and scope of your seismic l margins evaluation program, and your intention to coordinate that program with other related NRC ongoing initiatives, the staff finds your proposed schedule change regarding seismic margins evaluation to be acceptable. I I

l OM  !

I I (

8904120023 890330 1 PDR ADOCK 05000440 P FDC

1 0. s Mr. Alvin Kaplan In order to enable the staff to more effectively track your new commitment in this area, it is requested that you add this commitment to those listed in Appendix 1B of the Perry Nuclear Power Plant Updated Safety Analysis Report for Unit 1 at its next scheduled update.

Regarding your request for a meeting with the staff, the staff is favorable to this kind of informational exchange. Please provide the Perry project manager, Mr. Timothy G. Colburn, with a proposed agenda and list of potential meeting dates. Please bear in mind that a meeting date must be agreed upon at least 2 weeks in advance of the meeting to allow appropriate tine for issuing a meeting notice.

Sincerely,

/s/

John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page 1

Ec -

Office: LA/PDIII-3 PM/PDIII-3 gNRR

/ESGB NRR/PTSB Surname: PKreuher TColburn/tg GBagchi DPersinko Date: )'/,4l/89 3/g?f89 3 /L4 /89 3 /26/89 Office: PD/PDIII Surname: JHannon fgMVirgilioA)AD/DRSP g Date: 3 /g t I 3 /4r'/89

'a 1. j

.3 : -

i.*

Mr. Alvin Kaplan Perry Nuclear Power Plant The Cleveland Electric Unit 1 '

Illuminating Company l: I l cc: Jay E. Silberg Esq. . Mr. James' W. Harris, Director Shaw, Pittman, Potts & Trowbridge Division of Power Generation 2300 N Street, N.W. Ohio Department of Industrial' l Washington,-D.C. 20037 Relations P. 0. Box 825 David E. Burke Columbus, Ohio 43216 I

The Cleveland Electric Illuminating Company The Honorable Lawrence Logan P.O. Box 5000 Mayor,, Village of Perry Cleveland, Ohio 44101 4203 Harper Street Perry,- Ohio 44081 Resident Inspector's Office 1 U.S. Nuclear Regulatory Comission The Honorable Robert V. Orosz l Parmly at Center Road Mayor, Village of North Perry. i Perry, Ohio 44081- North Perry Village Hall I' 4778 Lockwood Road Regional Administrator, Region III North Perry Village, Ohio 44081 U.S. Nuclear Regulatory Comission )

799 Roosevelt Road Attorney General

Glen Ellyn, Illinois 60137 Department of Attorney General 30 East Broad Street Frank P. Weiss, Esq. Columbus, Ohio 43216 Assistant' Prosecuting Attorney i 105 Main Street Radiological Health' Program I Lake County Administration Center Ohio Department of Health ']

Painesville, Ohio 44077 1224 Kinnear Road )

Columbus, Ohio 43212 l OCRE-Interim Representative Ohio Environmental Protection 8275 Munson Agency Mentor, Ohio 44060 361 East Broad Street Terry J. Lodge, Esq.  !

618 N. Michigan Street Mr. Phillip S. Haskell, Chairman Suite'105 Perry Township Board of Trustees Toledo, Ohio 43624 Box 65 4171 Main Street John G. Cardinal, Esq. Perry, Ohio 44081 Prosecuting Attorney Ashtabula County Courthouse State of Ohio

. Jefferson, Ohio 44047 Public Utilities Commission 180 East Broad Street Robert A. Newkirk Columbus, Ohio 43266-0573 Cleveland Electric Illuminating Company Michael D. Lyster 3 Perry Nuclear Power Plant Cleveland Electric '

P. O. Box 97 E-210 Illuminating Company Perry, Ohio .44081 Perry Nuclear Power Plant P. O. Box 97 SB306 Perry, Ohio 44081 i

]