ML20237H270

From kanterella
Revision as of 15:32, 9 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Safety Evaluation Accepting 870601 Proposed Deletion of Electrical Penetration Filter & Exhaust Sys, Based on Review of 870715 & 23 Ltrs
ML20237H270
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/19/1987
From: Mark Miller
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20237H272 List:
References
TAC-65503, NUDOCS 8708240414
Download: ML20237H270 (2)


Text

_ _ _ - . _ _ ._ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _

Docket No.: 50-425 Mr. James P. O'Reilly Senior.Vice President - Nuclear Operations Georgia Power Company AUO 181907 P. O. Box 4545 Atlanta, Georgia 30302-

Dear Mr.'O'Reilly:

Subject:

Staff Acceptance of Vogtle Unit 2 Electrical Penetration Filter and Exhaust System Deletion (tac 65503)

By letter dated June 1,1987, Georgia Power Company (GPC) proposed to delete the Electrical Penetration Filter and Exhaust System from Vogtle Unit 2. This submittal was supplemented by letters dated July'15 and 23, 1987. Based on our review of these GPC submittals, we conclude that the proposed change does not alter the conclusion stated in the Vogtle SER regarding control room habitability and radiological consequences following a loss-of-coolant acci-dent, and therefore, we find the deletion of the Unit 2 Electrical Penetration

Filter and Exhaust System to be acceptable. Our detailed evaluation is enclosed.

Sincerely,

\%\

Melanie A. Miller, Project Manager Project Directorate 11-3 Division of Reactor Projects, I/II

Enclosure:

As stated cc: See next page DLSTRTRU"10N:

Local PDR PRC System PD23 Reading

~MDuncan MMiller i JPartlow.

EJordan ACRS (10) 8709240414 870819 1 OGC-Bethesda. PDR ADOCK 05000425 f A PDR SVarga/Glainas JLee. l JWermiel. i FC RP-I/II PD#p PD#II-3/DRP-I/II MA /mec MDunch- DRP-I/II DHood/ Acting PD 08/ q/87 08//j/87 08/ /87 t

r n

Mr. J. P. 0'Reilly

,. Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear. Regulatory Comission Georgia Power Company- P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr.' Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Yogtle Project Council Georgia ' Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project General Manager & Ashmore .

Georgia Power Company Candler Building

' Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesbore, Georgia 30830 Atlanta, Georgia 30303 Danny Feig

, Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.  !

P.O. Box 2625 Carol Stangler 1 Birmingham, Alabama 35202 Georgians Against Nuclear Energy j 425 Euclid Terrace  ;

Ernest L. Blake, Jr. Atlanta, Georgia 30307 l Bruce 'J. Churchill, Esq. I Shaw, Pittman, Potts and Trowbridge l 2300 N Street, N. W.  !

Mashington, D. C. 20037 l Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830

- - - _ . - _ - _ _ - - - - - - _ _ _ _ _