Concurs W/Request to Startup Plant & Proceed W/Startup Test Program.Decision Based on Util 871109 & 13 Ltrs Re Corrective Actions & Commitments & Preliminary Results of Augmented Insp Team Insp
ML20236Q181
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/13/1987
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
CAL-RIII-87-19, NUDOCS 8711190227
Download: ML20236Q181 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

)

NOV 131987 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company l ATTN: Mr. Murray R. Edelman Vice President Nuclear Group

! Post Office Box S000 Cleveland, OH 44101 Gentlemen:

SUBJECT:

CONFIRMATORY ACTION LETTER No. CAL-RIII-87-019 On October 29, 1987, and again on November 3,1987, several Main Steam Isolation

. Valves (MSIV's) failed to close within the maximum allowable time as delineated in the Perry Technical Specifications. As a result of these events an Augmented Inspection Team (AIT) was dispatched to the site and a Confirmatory Action Letter (CAL-RIII-87-019) was issued on November 4, 1987, to document our understanding that you would perform the following actions pursuant to the review of the MSIV failures:

1. Take those actions necessary to ensure that complete documentary evidence of the "as found" condition of equipment being inspected is maintained.
2. Provide a step by step troubleshooting program to establish the root cause of the MSIVs failure to meet acceptance criteria.
3. Not disturb any components that offer a potential for being the root cause including power sources, switches, solenoids, and the air system directly feeding the MISVs until that action is approved by the NRC AIT team leader.
4. Except as dictated by plant safety, advise the NRC AIT Leader prior to conducting any troubleshooting activities. Such notification should be provided soon enough to allow time for the team leader to assign an inspector to observe activities.
5. Submit to NRC Region III a formal report of your findings and conclusions within 30 days of receipt of this letter.

The CAL also specified that the plant would not be restarted without the concurrence of the Regional Administrator or his designee.

8711190227 PDR 871113 0 ADOCK 05000440 pop

\

SE OI

=_ _ _ - _ . _ __ _ - - - - _ _ _ _ - - - - _ _ _ - - _ _ _ -_

. , < r The' Cleveland Electric Illuminating' Company 2 gy13IN 5

. With: respect'to Items 1 through. 4 you have completed all of the specified actions  !

and'these have been evaluated by-the AIT. Their report will be issued shortly.

With regard to Item 5 we understand you' will submit to Region' III a formal report as specified.

Based on a review of your corrective actions and commitments as specified in your letters dated November 9,1987 (PY-CEI/01E-0288L), and November 13,.1987

/

(PY-CEI/0IE-0289L), and based on the preliminary resultsiof our AIT inspection, we believe you have: established ~ adequate plans for continued safe operation of the plant and forLfinal resolution of:this. matter. Therefore I concur with your request to startup the Perry plant and proceed with your Startup Test. Program.

. Sincerely, Original Signed By A. Berc Davis A. Bert Davis

-Regional Administrator cc: F. R. Stead, Manager, Perry Plant Technical Department M. D.~Lyste'r, Manager, Perry Plant Operations Department Ms. E. M..Buzzelli,' General Supervising Engineer, Licensing and Compliance Section DCD/DCB (RIDS)

Licensing Fee Management _ Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health State of Ohio, Public Utilities Commission R. Cooper, ED0 W. Lanning, NRR F. Miraglia, NRR G. Holahan, NRR M. Virgilio, NRR J. Partlow, NRR J. Strasma, RIII RIII- RIII RIII RIII RII RII RIII L nk b /mc di t Chr YWotimos Mker No 'f u s iello D 11/0/87 11/I3/87 11/g /87 Pap)/87 11/S/87 11/q/87 11/3 /87 11//

0 . Fo Yl?

1 ./87- 11 /8Y

_ _ - _ _ -