Forwards Safety Insp Repts 50-440/89-19 & 50-441/89-01 on 890425-28.No Violations Noted
ML20247A488
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/16/1989
From: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20247A494 List:
References
NUDOCS 8905230170
Download: ML20247A488 (2)


See also: IR 05000440/1989019

Text

p

p

'

. , ,.

. .

MAY 161989

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Alvin Kaplan

Vice President

Nuclear Group

10 Center Road

Perry, OH 44081

Gentlemen:

. This refers to the routine safety inspection conducted by Mr. J. H. Neisler

of.this office on April 25-28, 1989, of activities at Perry Nuclear Power

Plant, Units 1 and 2, authorized by NRC Operating License No. NPF-58 and NRC

Construction Permit No. CPPR-149 and to the discussion of our findings with

Mr. E. Riley and other members of your staff at the conclusion of the inspection.

The purpose of the inspection was to examine the preservation of Unit 2 structures,

components and materials during the extended construction delay.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

-

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original Signad by it V!. C;opar II"

R. W. Cooper, II, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-440/89019 and

No. 50-441/89001(DRS)

See Attached Distribution

1Lr ,

RIII RII RIII RII

R\4 i

ff' er/jk ing Gardner ooper

05/11/89 05/n./89 05/i t/89 05//6/89

8905230170 890516

gDR ADOCK 0500 0

._ . _ _ _ _ _ _________________-_____-__-__A

_ _ _ . ___ - ___ - . _ - . _ _

,

.

.l /', C

..' ..

. ,

. ..

t

~

,  :

.t .Thd Cleveland Electric ~ Illuminating .2

." '

Company-

MAY 161989 ~ .

'

E , ' Distribution ~'

-cc w/ enclosure: .

.

v; -

^ F. LR. Stead,: Director, Nuclear

. -Support Department .

M. D.nlyster, General ~ Manager, '

Perry Plant Operations Department

R. A..Newkirk,-Manager,. .

' Licensing and' Compliance Section-

, S.'S. Kensicki, Director,; Perry

JPla'nt. Technical Department:

DCD/DCB (RIDS)-

LLicensing Fee Management Branch

. Resident: Inspector,ERIII

',

- ' Harold-W. Kohn, Ohio'EPAi -

'

Terry J. Lodge, Esq.

t

' James.W.LHarris, State of Ohio

6 Roger Suppes, Ohio l. .

?Depa'rtment.of Health-

'

State of, Ohio', Public

' Utilities. Commission:

n

.

]

y

i

_ _ _ - .__ __ _. __ ._ _ _ _ - _ _ _ _ _ _ _ - - - _ _ _ - - _ _ _ _ _ _ _ - __-___-