ML20247L292

From kanterella
Revision as of 07:15, 10 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-440/OL-89-01 Administered on 890626-29.One Operator Remediated by Training Staff.Individual Scheduled for NRC Reexam on 890823
ML20247L292
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/27/1989
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20247L297 List:
References
NUDOCS 8908010205
Download: ML20247L292 (2)


Text

-

+-

JUL 2 71989 Docket No. 50-440 Docket No. 50-441 The~ Cleveland Electric Illuminating Company ATTN: fir. Alvin Kaplan-Vice President Nuclear Group 10 Center Road Perry, OH 44081 Gentlemen:

SUBJECT:

REQUALIFICATION EXAMINATION REPORT On June 26-29, 1989, the NRC administered requalification examinations to twelve employees of your organization who operate your Perry Nuclear Power Station.

The requalification materials that were provided were excellent. Also, the examinations were implemented very well by your Training Staff. As a result of this evaluation your requalification program has been assigned an overall program rating of satisfactory, in accordance with the criteria of NUREG-1021, ES 601.

The one operator, who did not achieve a passing grade for written portion of the NRC Requalification Examination, has been remediated by your Training Staff. This individual is scheduled for a NRC re-examination on August 23, 1989.

In accordance with 10 CFR 2.790 of the Cocaission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, L Geoffrey C. Wright, Chief Operations Branch

~s

)

RII RIII RIII Ne t g Jo kR wt 1 890801020D 890727 gDR ADOCK0500gj0 L__ __

1 o

O The Cleveland Electric Illuminating 2 JUL 2 7199 Company

Enclosures:

1. Examination Report No. 50-440/0L-89-01
2. Examinations and Answer Keys SR0/R0 ,

cc w/ enclosure:

F. R. Stead, Director, Nuclear Support Department M. D, Lyster, General Manager, Perry Plant Operations Department R. A. Newkirk, Manager, Licensing and Conpliance Section S. F. Kensicki, Director, Perry Plant Technical Department H. Ray.Caldwell, General Superintendent Nuclear Operations DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Terry J. Lodge, Esq.

James W. Harris, State of Ohio Roger Suppes, Ohio Department of Health A. Grandjean, State of Ohio, Public Utilities Commission cc w/o enclosures:

T. Colburn, Project Manager, NRR I

i

_________m-___w