ML20247R573

From kanterella
Revision as of 17:28, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-443/89-03 on 890228-0424 & Notice of Violation.Ack Util Intention to Initiate Appropriate Corrective Action as Described in 890428 Ltr.Notice of Violation Re Welding Program Deficiencies Not Issued
ML20247R573
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/25/1989
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20245E996 List:
References
NUDOCS 8906070259
Download: ML20247R573 (3)


See also: IR 05000443/1989003

Text

m - -

,

,

,

%

!

A

6

m o

' '

s

.

, p

.

,2 MAY 251989

.

p' ,

,

L/ -

.

Docket No.'50-443

"

l lPublic Service Company of New Hampshire

,

,  : ATTN: Mr. Edward A. Brown

President and Chief Executive Officer

New Hampshire Yankee Division

Post Office Box 300

i Seabrook,'New Hampshire 03874.

. Gentlemen:

r ,

Y

L Subject: NRC' Region I Inspet. tion Report No. 50-443/89-03

a 'This' refers to the routine safety inspection conducted by Messrs. D. Ruscitto

and D. Dempsey of this office on February 28 - April 24,1989, at the Seabrook

Station, Unit No. 1, Seabrook, New Hampshire. The inspection consisted of

selective examination of procedures and representative records, interviews with

personnel and observations by the inspectors. The results of the inspection

'

'are. described in the NRC . Region I Inspection Report enclosed. with this letter

and were discussed with Messrs. T. Feigenbaum and G.' Thomas of your staff-after

the conclusion ~of the inspection.

Based on the results of this inspection, it appears that certain of your activ-

-ities' were not conducted in ful) compliance with NRC requirements as set forth

W in the Notice of Violation enclosed herewith as Appendix A. The violation con-

cerns the failure on two occasions to comply with the special measures of

Facility Operating License No. NPF-56 which requires certain valves to be

locked closed to prevent inadvertent boron dilu . ion. This violation has been

-

r-ategorized by . severity level in accordance with the " General Statement of

.. Policy and Procedure ~ for NRC Enforcement Actions," 10 CFR Part 2, Appendix C,

53 Federal Register 40019 (October 13,1988). These two incidents, when viewed

in conjunction with several other recent minor operations, maintenance and sur-

veillance errors appear to indicate a potential weakness in what has been, to

date,' an- excellent operating record. Although we are concerned that such

lapses have occurred at this critical time when you are preparing to conduct

initial criticality. and low power testing, we acknowledge your intention to

. initiate appropriate corrective action as described in your letter to the NRC

dated April 28, 1989 (NYN-89047).

A' second violation of NRC requirements was identified by one of your quality

'

assurance audits. This violation involved welding program deficiencies. A

. third violation, also identified by your staff, involved the failure to report

the ~ discovery. of a controlled substance inside the protected area within one

hour as required. A Notice of Violation has not been issued for either of these

two violations because they were self-identified and meet the other criteria

described in 10 CFR part 2, Appendix C for the exercise of enforcement

discretion.

.1c1- -

a e " ' - 0001.0.0

,-p/

wn

{ ]a[90d $ $ ,[f

w

. - - - -

- - - - - - -

w,- <

..

N

[&s*

. . . ,

1. , 'Public Service Carrp:ny of 2:

MM 251989

"

>7r ,

New Hampshire

c0ne other. violation .of the Seabrook Technical Specifications was identified in

. your follow-up of instrument- overlap testing as reported in a Licensee Event

L Report. The violation is not being cited because the criteria specified in

Section V.A of the Enforcement Policy were satisfied.

In ~accordance with 10 CFR Part 2.50 of the NRC's " Rules of Practice," a copy

of this ;1etter . and - the enclosures will be placed in the NRC Public Document

Room.

..

Your cooperation with us is' appreciated.

Sincerely,

%

James T. Wiggins, Chief

Reactor Projects Branch No. 3

Division of Reactor Projects

Enclosures:

I. Appendix A, Notice of Violation

2. NRC Region I Inspection Report No. 50-443/89-03

cc w/encis:

J..C. Duffett, President and Chief Executive Officer, PSNH'

T.'C. Feigenbaum, Vice President, Engineering, Licensing and Quality

' Programs, NHY

J. M. Peschel, Operational Programs Manager, NHY

D. E. Moody, Station Manager, NHY

P. W. Agnes,.Jr., Assistant Secretary of Public Safety, Commonwealth of

Massachusetts  ;

Public Document Room

Local Public Document Room

Nuclear Safety Information Center

NRC Resident Inspector

State of New Hampshire

Commonwealth of Massachusetts

Seabrook Hearing Service List

l

1'

0FFICIAL RECORD COPY IR SEABROOK 89-03 - 0002.0.0

05/25/89

l

L

L -

.

_ . _ ..- --

_ _ _ _ --- - - - - - - - - - _ _ _ _ _ _ _ --___ _ __ _ _

,. .

,

Public Service Company of 3

New Hampshire

M 25 M9

bec w/encis:

Region I Docket Room (with concurrences)

M. Perkins, DRMA (w/o encis)

J. Wiggins, DRP

D. Haverkamp, DRP

N. Dudley, RI - Seabrook (w/ concurrences)

A. Cerne, Seabrook

G. Grant, SRI - Vermont Yankee

J. Macdonald, SRI - Yankee

R. Bores, DRSS

K. Abraham, PA0 (2)

V. Nerses, NRR

V RI:DRP RI:DR)

RI:

DRusc@itto/mjd

D%/ amp g

v5/2W89 5/2 'f/89 5/ 3/89

0FFICIAL f.ECORD COPY IR SEABROCK 89-03 - 0003.0.0

05/23/89

>

l

_ _ _ _ _ _ - - _.