ML20244C225

From kanterella
Revision as of 01:06, 23 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-440/89-16 on 890502-0602. Violations Noted.Decision Re Enforcement Action Will Be Made Following 890607 Enforcement Conference in Region III Ofc
ML20244C225
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/05/1989
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20244C228 List:
References
EA-89-112, NUDOCS 8906140169
Download: ML20244C225 (2)


See also: IR 05000440/1989016

Text

,

,

c,. ,

y .

Y. .:

.: - ;

kl

JUN 0 51989

,

-Docket.No. 50-440-

'

EA 89-112

i ..

p The Cleveland Electric Illuminating

Company

i? ATTN: :Mr. Alvin Kaplan

,

Vice President

t 1

Nuclear Group

'10 Center. Road'

Perry,.OH 44081

Gentlemen:

This refers to the special special safety inspection: conducted by

Messrs. M. A. Kunowski and R. J. Caniano of this office from May 2 through-

June 2, 1989, of. activities at Perry Nuclear Plant, Unit 1, authorized by NRC

-

Facility Operating 1.icense No. NPF-58 and to'the discussion'of our findings-

.with'Mr. S. F. Kensicki and members of your staff at the conclusion of the.

. inspection,-and to the. telephone discussion with Mr. G. Dunn and others.of.your

staff on June 5, 1989.

The enclosed copy of our inspection report identifies-areas examined during

the inspection. Within'these areas, the inspection consisted.of a selective

examination'of procedures and. representative records, observations, and

interviews with personnel.

.During this inspection, certain of your activities appeared to be in violation

.of NRC requirements. . We are releasing this' report at this' time for your

information. Following the Enforcement Conference which has been scheduled

for June-7;-1989, in the Region III Office, you will be' notified by separate

_

correspondence of.our decision regarding enforcement actions based on the-

findings of this inspection. ~No written response is required until you are

notified'of the proposed enforcement: actions.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in'the

NRC Public Document Room.

'

Sincerely,

l

i

b b Dock $bobb440 Charles E. Norelius, Director

Q PDC Division of Radiation Safety

and Safeguards

Enclosure: Inspection Report

No. 50-440/89016(DRSS) .

Ih

""

$nlowski/Ims

nxtarx x-

Can o

w :"W " g " x'f

SchumacherGrehr Ring

""

W

no%Stapleton--

46 _ _ __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. .

  • *

,

.

l

1

The Cleveland Electric Illuminating 2 JUN 0 51989

Company

I

Distribution

cc w/ enclosure:

F. R. Stead, Director, Nuclear

Support Department

M. D. Lyster, General Manager,

Perry Plant Operations Department

R. A. Newkirk, Manager,

Licensing and Compliance Section

S. F. Kensicki, Director, Perry

Plant Technical Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Roger Suppes Ohio

Department of flealth

State of Ohio, Public

Utilities Commission

SECY

CA

OGPA

J. M. Taylor, DEDR

H. Thompson, DEDS

J. Lieberman, OE

L. Chandler, 0GC

T. Murley, NRR

RA0:RIII

PAO:RIII

SLO:RIII

M. Stabulak, RIII

Enforcement Coordinators

RI, RII, RIII, RIV, RV

Resident Inspector

bec: C. H. Weil, RIII

_ - - . _ _ _ _ _ _ . - _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l