ML20212B062

From kanterella
Revision as of 19:55, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-440/87-02 on 870126-30.No Violations Identified
ML20212B062
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/23/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20212B066 List:
References
NUDOCS 8703030469
Download: ML20212B062 (2)


See also: IR 05000440/1987002

Text

- _ _ _ _ - _ _ _ _ _ _

.

. ..

'

.

FEB 2 31987

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen: $

This refers to the routine safety inspection conducted by Dr. R. B. Holtzman

of this office on January 26-30, 1987, of activities at the Perry Nuclear Power

Plant, Unit 1, authorized by NRC Operating License No. NPF-58 and to the

discussion of our findings with Mr. F. Stead at the conclusion of the

inspection. Additional discussions were held by telephone with J. Grimm on

February 3, 1987, and with D. Reyes and B. Ferrell on February 5, 6, and 12,

1987.

The enclosed copy of our inspection re) ort identifies areas examined during

the inspection. Within these areas, t1e inspection consisted of a selective

examination of procedures and representative records, observations,

independent measurements, and interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y

of this letter and the enclosed inspection report will be placed in tie

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-440/87002(DRSS);

See Attached Distribution

RIIE RITI

kh

HoltimaA/Im

'\

RIII[}

Schuma he [ hRRt)f,y-

Knop

RII,

H a

&@

7

0703030469 070223

gDR ADOCK 05000440

PDR

.. . _ _ _ _ _ _ _ _ _ _ _ _ _ )

i

,

The Cleveland Electric Illuminating 2 FEB 2 3 D87

Company

Distribution

cc w/ enclosure:

F. R. Stead, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

Ms. E. M. Buzzelli, General Supervising

Engineer, Nuclear Licensing and

Compliance Section

DCS/RSB(RIDS) '

Licensing Fee Management Branch

Resident Insaector, RIII

Harold W. Koln, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

4

4

- - - - ---.------.-_---.-,m -

e, - -, ---- -- ,-_-,----,. y, w , - - - - ,