Forwards Insp Rept 50-298/87-06 on 870201-28 & Notice of Violation.Unresolved Item Identified
ML20207S431
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/16/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20207S432 List:
References
NUDOCS 8703190438
Download: ML20207S431 (2)


See also: IR 05000298/1987006

Text

i .

MAR 161997

In Reply Refer To:

Docket: 50-298/87-06

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager - Nuclear Support

P. O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and

M. Skow of this office during the period February 1-28, 1987, of activities

authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to

the discussion of our findings with Mr. G. Horn and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection included licensee action on previous

inspection findings, IE Bulletins / Temporary Instructions, IE Information

Notices, 10 CFR Part 21 Reports, independent inspection, measuring and test

equipment calibration, plant trips-safety systems challenges, operational

safety verification, and monthly surveillance and maintenance observations.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

An unresolved item is identified in paragraph 6 of the enclosed inspection

report.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:Pl lip /A C:RPB !

MESkow/[sn [ f}iN,: RI R V: SRI Jaudon JEGagl i'ardo )

< M APlettner }DL0uBois

3 /II/87 k)/\/87

\ / W87 /tl/87 3 //

3 f7{

l

p?S39888RS$8She '[ s g

O

___ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _

, ,

,

'

Nebraska Public Power District -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

OrtRinal Signed Dy '

J. E. Gc:;!\ardo

J. E. Gagliardo, Chief

Reactor Projects Branch  !

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-298/87-06

cc w/ enclosures: ,

Guy R. Horn, Division Manager i

of Nuclear Operations l

Cooper Nuclear Station l

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director l

Nebraska Radiation Control Program Director

'

bec distrib. by RIV:

  • RPB DRSP '

l *RRI R. D. Martin, RA

  • Section Chief (RPB/A) *D. Weiss, RM/ALF
  • R&SPB *RSB
  • MIS System * Project Inspector
  • RIV File *R. Hall

i *RSTS Operator *MESkow

J. Rosenthal, Chief, (EAB) E. L. Jordon, Dir., (EP/ER)

+ Eric Weiss, IE

'

  • w/766

>

l

l

i .

4

l

t