Text
i
.
MAR 161997
In Reply Refer To:
Docket:
50-298/87-06
Nebraska Public Power District
ATTN:
George A. Trevors
Division Manager - Nuclear Support
P. O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Messrs. D. DuBois, E. Plettner, and
M. Skow of this office during the period February 1-28, 1987, of activities
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station and to
the discussion of our findings with Mr. G. Horn and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection included licensee action on previous
inspection findings, IE Bulletins / Temporary Instructions, IE Information
Notices, 10 CFR Part 21 Reports, independent inspection, measuring and test
equipment calibration, plant trips-safety systems challenges, operational
safety verification, and monthly surveillance and maintenance observations.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors.
The inspection findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
An unresolved item is identified in paragraph 6 of the enclosed inspection
report.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
MESkow/[sn [ f}iN,: RI
RIV:Pl
R V: SRI
lip /A
C:RPB !
Jaudon
JEGagl i'ardo
M APlettner }DL0uBois
<
3 ;3 f7{
\\
/ W87
/tl/87
3 /II/87
k)/\\/87
//
l
p?S39888RS$8She
'[ s g
O
___
. _ _
. _ _ _ _ _
_ _ _ _ _ _ _
,
,
,
'
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
OrtRinal Signed Dy
'
J. E. Gc:;!\\ardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/87-06
cc w/ enclosures:
,
Guy R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
'
bec distrib. by RIV:
- RPB
DRSP
'
l
- RRI
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, RM/ALF
- R&SPB
- RSB
- MIS System
- Project Inspector
- RIV File
- R. Hall
i
- RSTS Operator
- MESkow
J. Rosenthal, Chief, (EAB)
E. L. Jordon, Dir., (EP/ER)
Eric Weiss, IE
+
- w/766
'
>
i
.
4
t
m.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
.
.
.
.