Forwards Insp Rept 50-298/86-21 on 860601-30 & Notice of Violation
ML20203F654
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20203F659 List:
References
NUDOCS 8607310155
Download: ML20203F654 (2)


See also: IR 05000298/1986021

Text

-

.

.

- In Reply Refer To:

Docket: 50-298/86-21

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

_

Staff-Nuclear Power Group

P. O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. DuBois and E. A.

Plettner of this office during the period June 1 through June-30, 1986, of

activities authorized by NRC Operating License DPR-46 for Cooper Nuclear

Station, and to the discussion of our findings with Mr. G. R. Horn and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included action you have taken with regard

to previously identified inspection findings, Licensee Event Reports, spent

'

fuel shipments, operational safety verification, and monthly surveillance and

maintenance activities. Within these areas, the inspection consisted of

4

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. These findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation.of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's, " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

f

RIV

O bRI RF / RPB //

P ttner DLQuBois JFJaudon JEGagl r 6'-

g/@/86 q g /86 /86 ;7 /g/f

8607310155 860724 8

DR ADOCK 0500 \

p

- --- - .- - - - - - -

. ._ -

r,

,

Nebraska Public Power District -2-

"

Should you have any questions concerning this inspection, we will be pleased to

. discuss them with you.

,

Sincerely,

POriginal Signed bn

'J. E. GAGLI ARDO"

- J. E. Gagliardo, Chief

, Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

. 50-298/86-21

cc w/ enclosure:

1 Nebraska Public Power District

i

Guy R. Horn. Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

i

bcc to DMB (IE01)

l

bcc distrib. by RIV:

  • RPB DRSP

i * Resident Inspector R. D. Martin, RA

  • Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015)
  • E&SPB *RSB
  • MIS System *RSTS Operator

I *RIV File

l

  • w/766

,

,