ML20203F654
| ML20203F654 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 07/24/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20203F659 | List: |
| References | |
| NUDOCS 8607310155 | |
| Download: ML20203F654 (2) | |
See also: IR 05000298/1986021
Text
-
.
.
- In Reply Refer To:
Docket:
50-298/86-21
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
_
Staff-Nuclear Power Group
P. O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Messrs. D. L. DuBois and E. A.
Plettner of this office during the period June 1 through June-30, 1986, of
activities authorized by NRC Operating License DPR-46 for Cooper Nuclear
Station, and to the discussion of our findings with Mr. G. R. Horn and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included action you have taken with regard
to previously identified inspection findings, Licensee Event Reports, spent
fuel shipments, operational safety verification, and monthly surveillance and
'
maintenance activities. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
4
personnel, and observations by the inspectors.
These findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation.of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's, " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
f
bRI
RF
/
RPB
//
O
RIV
P ttner
DLQuBois
JFJaudon
JEGagl
r 6'-
g/@/86
q g /86
/86
- 7 /g/f
8607310155 860724
DR
ADOCK 0500
8
\\
p
.
-
---
-
.-
-
-
-
- -
-
. .
-
r,
,
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
"
.
Sincerely,
,
POriginal Signed bn
'J. E. GAGLI ARDO"
J. E. Gagliardo, Chief
-
,
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/86-21
.
cc w/ enclosure:
1
Nebraska Public Power District
i
Guy R. Horn. Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
i
bcc to DMB (IE01)
l
bcc distrib. by RIV:
- RPB
DRSP
i
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- E&SPB
- RSB
- MIS System
- RSTS Operator
I
- RIV File
l
- w/766
,
,
I
i
. - ,
-
-
-
. . . - ~,-.-.
.
. . - , .
-- . - - . . - - - - - -
- .-
. . - - . -