ML20205L079

From kanterella
Revision as of 14:32, 12 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-298/88-28 on 880901-30 & Notice of Violation.Actions Taken W/Regard to Previously Identified Insp Findings Also Examined & Discussed in Rept Paragraph 3
ML20205L079
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/21/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20205L082 List:
References
NUDOCS 8811010469
Download: ML20205L079 (2)


See also: IR 05000298/1988028

Text

'

. .. . i

w

+ ,

, .

'

, .-

, -

c4 OCT 2 i MB  ;

'

In Reply Refer.To:

Docket: 50-298/88-28

'

Nebraska Public Power Distri'.t >

- ATTN: George A.'Trevors . '

,

Division Manager - Nuclear Support

. ' P.O. Box 499 ,.

Columbus, NE 68601 ,

,

Gentlemen:

This refers to the inspection conducted by Mr. W. R. Bennett of this office 'I

during the pe,'iod September 1-30, 1988, of activities ~ authorized by NRC ,.

,

.'

0perating License DPR-46 for Cooper Nuclear Station, and to the discussion of

our findings with Mr. G. R. Horn and other members of your staff at the  ;

conclusion.of the inspection.

, Areas examined during the inspection included LER followup, transportatinn,  !

facility modifications, operational safety verification, monthly surveillance

and maintenance observations. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspector. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of HRC requirements. ' Consequently, you are required to respond to

l this violation, in writing, in accordance with the provisions of Section 2.201

, of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

1

j We have also examined actions you have taken with regard to previously

The status of these ites is identified in

'

identified inspection findings.

paragraph 3 of the enclosed inspection report. i

r

. The response directed by this letter and the accompanying Notice are not subject  :

to the clearance procedures of the Office of Management and Budget as required l

by the Paperwork Reduction Act of 1980, PL 96-511.  !

c

i

Should you have any questions concerning this inspection, we will be pleased to l

a discuss them with you. l

l Sincerely,  !

,

-

Original Signed By r

A.B.Deach j

L. J. Callan, Director

Division of Reactor Project s l

Enclosures: (seenextpage)  !

RI

nnett/sn

C:D

GL

C

table

D

L

ch

lan

,

l

f/4/88 P/g/88 10M /88 h, i

9911010469 801021

k '

PDR ADOCK 0".iOOO298 r

O PDC L

._. __ ____ _

r' -

g x

. .

' '

>

.

.. ..

Nebraska Public Power District -2-

., tEnclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-208/88-28 ,

'

acc w/ enclosures:

.

'

Cooper Nuclear Station -

ATTN: Guy R. Horn, Division Manager

of Nuclear Operations

P.O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebr/ska Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • NRC Resident Inspector R. D. Martin, RA
  • Section Chief (DRP/C) *A. B. Beach

RPSB-DRSS *Lisa Shea, RM/ALF

  • NRC RIV File * MIS System
  • RSTS Operator *Projer.t Engineer, DRP/C
  • 0RS *P. O' Conner, NRR Project Manager
  • DRP
  • w/766

'\