Rev 0 to Alternative Safe Shutdown Procedure ASSD-11, Diesel Generator Cooling Water Valve Pit
ML20205S362
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/04/1988
From: Bishop E
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20205K904 List: ... further results
References
ASSD-11, NUDOCS 8811110035
Download: ML20205S362 (3)


Text

c ... -.

u -_ n ;wa wa..;a..: 2- ;\

, 1-O CAROLINA POWER & LIGHT COMP /,NY BRUNSWICK STEAM ELECTRIC PLANT n UNIT 1 l PROCEDURE TYPE: ALTERNATIVE SAFE SHUTDOWN PROCEDURE  :

I 1

l iMSER: ASSD-11 l

1 I

PROCEDURE TITLE: DIESEL GENERATOR COOLING WATER VALVE PIT I Rev. O

{,)

R B.i 4/4/88 b

h 6, f s@Q

.$ ,f ,,.'

  1. 4 y

, :*p*4??

c .,

1 1

I l Approved By: k A.0 General Mahaiger/ Manage] - Operations Date:

  • Nfich/

//

Ga13 3 3 %

l Q,y ;DR ADocaOUN00$y l PDR BSEP-1/ASSD-11 Page 1 of 3  !

Rev. 0 l q%itti0t35

L15T OF EFFECTIVE PA625

.O AS$D 11 Pane (s) Revision 13 0 MD G

\

1 i

(

4 0

85EP-1/ A35011 Page 2 of 3 Rey, 0

/

)

7

i. .

A. TITLE

@ Diesel Generator Cooling Water Valve Pit B. REFERENCES

1. Per 10CFR50 Appendix 'R' Sections Ill.G & L.
2. Per 10CFR50 Appendix 'R' Section Ill.J. .

C. ENTRY CONDITION This procedure is entered from the Alternative Safe Shutdown Index ASSD-01.

1. A fire has occurred in an area containing equipment common to Alternative Safe Shutdown Train A and Alternative Safe Shutdown Train B, AND The Shift Foreman has determined that the reactor is to be brought to Cold Shutdown using Alternative Safe Shutdown Train A AND/0R Alternative Safe Shutdown Train B.

/t s.

The purpose of this procedure is to provide supplemental actions to be

' S-63) used concurrently with E0Ps and other operations proc 2dures to achieve and maintain Cold Shutdown coincident with or without a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loss of off-site power.

D. OPERATOR ACTIONS None NOTE Train A AND Train B safe shutdown equipment will be operable from normal controls and power supplies for fire in this area. No specific guidance is required by this procedu re.

i N$ A .

BSEP-1/ ASS 0-11 Page 3 of 3 Rev. O m-