ML20205S315
| ML20205S315 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/04/1988 |
| From: | Bishop E CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20205K904 | List:
|
| References | |
| ASSD-07-01, ASSD-7-1, NUDOCS 8811110021 | |
| Download: ML20205S315 (9) | |
Text
__
.,g4 l
l i
l CAROLINA POWER & LIGHT COMPANY i
BRUNSWICK STEAM ELECTRIC PLANT I
UNIT 2 l
PROCEDURE TYPE:
ALTERNATIVE SAFE SHUTDOWN PROCEDURE f
i NUMBER:
ASSD-07 l
I PROCEDURE TITLE:
REACTOR BUILDING 20' ELEVAT10t.
ECCS PIPE TUNNEL l
Q Rev. O f
R B.L 4/4/88 l
l
%Ds,#
Approved By:
/
N Date:
' /
General ManageriManager-Operations I
g3 ks BSEP-2/ASSD-07 Page 1 of 9 Rev. 0
LIST OF EFFECTIVE PAGES
.,\\
,)
ASSD-07 Page(s)
Revision 1-9 0
RB h
4
($$
BS EP-I/ ASSD-07 Page 2 of 9 Rey, 0 m ---
A.
TITLE Reactor Building 20' Elevatlon ECCS Pipe Tunnel B.
REFERENCES 1.
Per 10 CFR 50 Appendix 'R' Sections III.G & L.
2.
Per 10 CFR 50 Appendix 'R'Section III.J.
C.
ENTRY CONDITION This procedure is entered from Alternative Safe Shutdown Index ASSD-01.
1.
A fire has occurred in an area containing Alternative Safe Shutdown Train A and Train B equipment.
l AND 2.
The Shift Foreman has determined that the reactor is to be brought to Cold ShJtdown using Trt.in A and/or Train B.
The purpose of this proced6re is to provide supplemental actions to be used concurrently with E0P's and other operations procedures to achieve R B.l and maintain Cold Shutdown coincident with or without a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loss of off-site power.
D.
OPERATOR ACTIONS 1.
IF while executing this procedure, the fire is extinguished IND the Shift Foreman determines that no action within this procedure is required, THEN EXIT this procedure.
2.
OBSERVE the following parameters or, instruments indicated while performing actions to achieve and me.intain cold shutdown.
Instrument Location 2-CAC-TR-4426-1 Suppression Pool Temp. (Pt.1)
Control Room Panel 2-CAC-LR-2602 Torus Level Control Room Panel 2-C32-PI-R605 Reactor Pressure Control Room Panel 2-C32-LI-R606 A Reactor Water Level Control Room Panel 2-CAC-T.1-778 Suppression Pool Water Temp. (Pt. 7)
Remote Shutdown Panel 2-CAC-LI-3342 Torus Level Remote Shutdown Panel 2-C32-PI-3332 Reactor Pressure Remote Shutdown Panel 2-B21-L1-R604BX Reactor Water Level Remote Shutdown Panel l
o.
l U BSEP-2/ASSD-07 Page 3 of 9 Rev. 0 l
t
I 3.
IF reactor building AND/0R diesel generator building entry is h
E quired to restore 3, monitor equipment, THEN a.
DISPATCH the following minimum manpower for performance of this procedure:
Reactor Building - 1 Auxiliary Operators Diesel Generator Building - 1 Auxiliary Operator l
b.
OBTAIN the following keys from the Shift Foreman's Key Locker l
(1) ASSD Equips.ent Cabinet Key #148 (1) ASSD Flashlight Tool Box Key #160 c.
OBTAIN Security Access Keys from SAS Security l
Officer located in the Control Room I
AND PROCURE the following equipment from the ASSD l
Equipment Cabinet:
For Reactor Building (1) Flashlights
- 1) Sound powered phones 1
Copies of this procedure p2 1
Remote Shutdown Key, Serial T112 (1
Security Access Keys M, S.J (1) Twenty-five foot sound powered phone i
extension cord L
For Diesel Generator Building 1
- 1) Flashlight l
- 1) Copy of this procedure i
- 1) Security Access Key l
(14) Door Wedge Blocks d.
USE appropriate figures in this procedure to provide access / egress routes, equipment and comiunication locations.
4 If Train B shutdown is required, THEN PLACE Reactor Water Uvel "NORMAL / LOCAL" switch. 2-B2T~CT-TIT!~at the Remote Shutdown Panel, to the "LOCAL" position to make Level indicator 2-B21-L1-R604BX operable.
5.
1F Diesel Generator operation is required THEN BLOCK OPEN
~
UTesel Generator Building doors, as indicated on Attachment 1 to establish ventilation for Diesel Generator operations.
l hi h
1 i
l l
BSEP-2/ASSD-07 Page 4 of 9 Rev. 0 I
k
h CAUTION Performance of the following disables HPCI al.d RCIC high area temperature logic.
6.
g RCIC AND/0R HPCI operation is required THEN a.
PLACE RCIC Logic A Switch B21-55A and RCIC Logic B Switch B21-55B on panel H12-P614 in the TEST
- position, b.
PLACE HPCI Logic A Switch, B21-56A and HPCI Logic B Switch, B21-56B on panel H12-P614 in the TEST position.
c.
OPERATE RCIC AND/0R HPCI as required for a fire in i
the South side of the division wall in the ECCS pipe tunnel, d.
OPERATE RCIC as required for a fire in the North side of the division wall in the ECCS pipe tunnel.
R8 7.
IF operation of RHR Service Water System is required AND RHR g~?
Wrvice Water Booster Pumps are NOT available. THEN RTITR to O P-4 3.
8.
IF RHR is required for Torus Cooling AND/0R Shutdown Cooling,
,THEN a.
OPERATE RHR Loop Ag B as required for torus cooling.
b.
OPERATE RHR Loop A for shutdown cooling for a fire in the South side of the division wall in the ECCS pipetunnel,g c.
OPERATE RHR Loop B for shutdown cooling for a fire in the Nrth side of the division wall in the ECCS pipe tunnel.
9.
WHEN the Shif t Foreman determines RCIC AND/OR HPCI are no longer required for operation. THEN a.
PLACE RCic Logic A Switch B21-SSA and RCIC Logic B Switch B21-55B on panel H12-P614 to the NORMAL position.
/
O..
Ind/yer BSEP-2/ ASSD-07 Page 5 of 9 Rev. O
b.
PLACE HPCI Logic A Switch, B21-56A and HPCI Logic B Switch B21-56B on panel H12-P614 to the NORMAL h
position.
/
Ind/Ver 10.
WHEN the Shift Foreman determines:
a.
Diesel Generator Building doors that were
~~~~
opened / blocked open for Diesel Generator ventilation are no longer required to be open, THEN RESTORE all Diesel Generator Building doors that were opened on Attachment 1 to the closed position.
/
lnd/Ver 3.
Reactor Water Level indicator, 2-B21-LI-R604BX, is no longer required. THEN PLACE Reactor Water Level "NORMAL / LOCAL" SwitcU-B21-CS-3345 at the Remote Shutdown Panel, to the "NORMA *.* position.
/
R 8.
Ind/Ver 11.WHEN:
a.
The fire is extinguished AND b.
All breakers AND/0R switches operated in this procedure arc restored to their normal position AND c.
No actions within this procedure are required to achieve or maintain Cold shutdown. THEN d.
EXIT this procedure.
Date/ Time Completed Performed By (Prict)
Initials Reviewed By:
Shift Foreman BSEP-2/ ASSD-07 Page 6 nf 9 Rev. O
CONTROL BUILDING M
ro twor no.:
r0 v::or no.:
cla3rca S0a._, ch so'.0.*
c3Ac ro_ n s,3.c3 tt. so o,-
p.....,.......
a-------
IRS V Olh o. '
l T
?m==w i%8 ll 00aN
'E3V0llth 0~
unPNL 4)0 00wM TO PML 38 A
,7,0.,
a __ k3
^
a
~ Qg pg}
YINIR GIR
~
g l l' l
l l=Mit =P C
- )l !=Mit=PG20 ~
l CONTMOL l
l Mit Pete
=
,,-(
p if M00w i
i i
,i a 2.#tta rild l
l h
l i
7 l
[
2.HI2=Pett 0
{
I-Hit *P023l l
i i
i i
ig g
' ' ' ' ' ' ' ' ' ' ^l ^g^g y o_p?
y g r.
LitSY 0137.
PNL 4A
!NL 3A gg g o., gs 70.' OICSEL GENEMATOM SUIL0lN6e SERVICE WATEM GUILDING, MEACTOM DUILDING AND THE CAST YAMO S O'E CONTMOLLED ACCESS 9MitECWAY_
(".
its/23Gv0C tt3/230v 0C m=
/$wlTCHBCAMO18= Q
_ oore
=- $wtTCM80AMO 20 L
-4 g.ge== -
~
f V*.,
~
,"l.',
Y
" ' 'p.
rnou reou y. - -
"' gQ g
('rr.
,'!;r g
bd_
l l
EQUINGT LOOWt h--m WY
~?" ~ ~~,CATT cnJRett i
l N
l BAf r CNA90tR
\\
X.
~~
t
/ seta suorc~ta I
a
~Y t
site svarents ens Mrs W8' A vs A sA pg UNIT 2 CABLE
- ^rtN, UNIT l CABLE s A r r,
$!ntA0 Ants sppgAQ AngA o
6--"
r
$wlTCM80AMD 2Al EL. 23'-0*
123/250V OC
!!3/250V CC l
$wtTCM80AM0 I A LtotNo Qnn0Nt.tAcx,ina: NACRE
- - - acctss/ tentss FIGURE 1 Control Building 23'0" and 49'0" Elevations Access / Egress t
and Sound Powered Phone Comunications B SE P-2/ ASSD- 07 Page 7 of 9 Rev. O
Monru UNIT R MEACTOM OUILDING l
nlc
- =S 1
J Y
i I
r ro, M " "
/ qB
.,,0s j y-
.-. a avar.
aamr=
\\
f /
f
- N*# E ORYlVELL
\\
=h l>~, (\\
2XE(Ost) l
- NetIMc&
Y
- j
- I 'g* ~NCC 2Re j
Q p
1 nCC 2XD
=
I
) QJ
~
u uce l
2XS=2-f.:+
1 n
y-
/
u
(
j RSDP i
i i
nenort l')j
,,o
- &r#0Wir 1 C PAMfL W Rl Gs
)t f}
cmf ro e en0s
[\\1 l
l 88'-** * 'v" * ~
1 y
70 & fn0N
/
- C.p? %y#
l i
l ELEVATION Ii d==
ly segggg )
l
=
nom wee:Xc A J-
~
ELEVATION 20'-0
- J.,L M t.
1 I
Q rnout.isex, rnam a On s j
- - - - sccessitantss l
e 190Left SWITCM i
FIGURE 2 f
Unit 2 Reactor Building 20'-0" Elevation Access / Egress i
and
[
{
Sound Powered Phone Communication BSEP-2/ ASSD-07 Page 8 of 9 Rev. O I
DIESEL GEERATOR VENTILATION I
h 1.
OPEN/ BLOCK OPEN doors identifled on drawing below.
2.
BLOCK OPEN doors using door wedge blocks.
I i
10 3 10 5 10 6 10 7 108 109 110 til lit 11 3 l14 i
/
)
t i
101 10 4 f
a........e4
....-a-----i------r--------
1 1
Y 0
P_h P_-
pv R S eg _I. ct.1. c'i}.I.cil.'wm l:
Y. t' I
ga l*
f l
. g g.
g.
.y
(.
i
- , i
,,1 i
,,i s
s l
IO2 l
...d E E "'*"-
i i
l
?........ ?......Y.........n........n.......J..........d EL. 2 3'-0
- l l
i t
i l
t I
f ATTACHMENT 1 t
Diesel Generator Building Door Position For Diesel Cell Ventilation l
l,C,
y I
I l
i i
I BS EP-2/ASSD-07 p39' 9 of 9 Rev 0
-