Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20198K041 | 21 December 1998 | Rev 1 to Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 | |
ML20238F667 | 28 August 1998 | Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 | |
ML20237A571 | 16 July 1998 | Rev 10 to OENP-16.7, Administrative Control of Check Valve Disassembly Program | Anchor Darling |
ML20217H306 | 16 April 1998 | Rev 0 to ISI Program for Class 1,2 & 3 Components & Supports | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld Scaffolding |
ML20197A937 | 25 February 1998 | Rev 4 to 0AP-025, Bnp Integrated Scheduling | Safe Shutdown Half scram Scram Discharge Volume Maintenance Rule Program Scaffolding Downpower |
ML20203M403 | 18 February 1998 | Rev 0 to Pump & Valve IST Program Plan Third Interval for Cp&L,Units 1 & 2 | Reactor Vessel Water Level Stroke time Excess Flow Check Valve Cold shutdown justification Power-Operated Valves |
ML20197A928 | 12 February 1998 | Rev 22 to 0A0P-13.0, Operation During Hurricane,Flood Conditions,Tornado or Earthquake | Design basis earthquake Earthquake Operability Assessment |
ML20204A755 | 2 February 1998 | Rev 0 to ESR 97-00706, Benchmark of Dll Computer Program | |
ML20199A929 | 22 January 1998 | Core Shroud Insp Plan Unit 1 B112R1 Outage April 1998 | |
ML20202D915 | 2 December 1997 | Rev 11 to 0AOP-34.0, Chlorine Emergencies | Met Tower |
ML20199J571 | 14 November 1997 | Rev 3 to 0AP-025, Bnp Integrated Scheduling | Safe Shutdown Half scram Scram Discharge Volume Maintenance Rule Program Scaffolding Downpower |
ML20199J560 | 13 October 1997 | Rev 2 to 0AP-022, Bnp Outage Risk Mgt | Safe Shutdown Unanalyzed Condition Fitness for Duty Shutdown Margin Water Inventory Control Time to boil Maintenance Rule Program |
ML20198P484 | 8 October 1997 | Rev 1 to BSEP Unit 2 Core Shroud Insp Plan Outage B213R1 | Nondestructive Examination |
ML20196J568 | 17 July 1997 | 1 to 2ASSD-05 Plant Operating Manual,Alternative Safe Shutdown Procedure Unit 2, Reactor Bldg North | Safe Shutdown Overspeed trip |
ML20148L761 | 12 June 1997 | Core Shroud Insp Plan Unit 2 B213R1 Outage,Sept 1997 | |
ML20202D933 | 23 April 1997 | Rev 1 to 0FPP-038, Operation of SCBA Refill Sys | |
ML20202D937 | 18 March 1997 | Rev 2 to Fire Protection Procedure OFPP-039, SCBA Use & Maint | Hydrostatic |
ML20115C690 | 30 June 1996 | Core Shroud Reinspection Plan for Unit 1 B111R1 Outage Oct 1996 | |
ML20094E086 | 2 November 1995 | Core Shroud Reinspection Plan Unit 2 B2121R1 Outage for Feb 1996 | |
ML20078P673 | 9 February 1995 | Core Shroud Reinsp Plan Unit 1 B110R1 Outage,Apr 1995 | |
ML20079B081 | 14 December 1994 | Three-Yr Business Plan Performance Improvement Initiatives & Projects | |
ML20073K899 | 3 October 1994 | Rev 47C to Plant Emergency Procedure (Pep) 0PEP-APPENDIX a, Emergency Response Resources | |
ML20071P149 | 2 August 1994 | Three-Yr Business Plan Performance Improvement Initiatives & Projects | Safe Shutdown High winds Reactor Vessel Water Level Loop seal High Radiation Area Non-Destructive Examination Fire Barrier Probabilistic Risk Assessment Coatings Temporary Modification Condition Adverse to Quality Stress corrosion cracking License Renewal Exemption Request Earthquake Liquid penetrant Through-Wall Leak Power Uprate Thermography Loss of condenser vacuum |
ML20029E247 | 4 May 1994 | Three Yr Business Plan Performance Improvement Initiatives & Projects. | Safe Shutdown High winds Reactor Vessel Water Level Loop seal High Radiation Area Non-Destructive Examination Fire Barrier Hydrostatic Probabilistic Risk Assessment Coatings Temporary Modification Emergency Lighting Condition Adverse to Quality Stress corrosion cracking Systematic Assessment of Licensee Performance License Renewal Earthquake Liquid penetrant Through-Wall Leak Siren Power Uprate Thermography |
ML20072M857 | 29 March 1994 | Rev 0 to Plan Mod 94-0077, Unit 2 Core Shroud Mod | Safe Shutdown High Radiation Area Operating Basis Earthquake Abnormal operational transient Double blade guide Design basis earthquake Process Control Program Stress corrosion cracking Earthquake Liquid penetrant Power Uprate |
ML20217D491 | 30 July 1993 | Rev 0 to B-SP-93-06 Assessment Plan Outline, Program or Area:BNP-1 Startup & Power Ascension Readiness Assessment | Foreign Material Exclusion Stress corrosion cracking Operability Determination Scaffolding |
ML20045E097 | 16 May 1993 | Mod 91-038 to Field Rev 3 to Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & RHR Procedure | |
ML20044G613 | 11 May 1993 | Rev 5 to Design Guide DG-II.20, Design Guide for Civil/Structural Operability Reviews. | Safe Shutdown Probabilistic Risk Assessment Operability Determination Operability Assessment |
ML20044C619 | 1 March 1993 | Rev 4 to Design Guide DG-II.20, Civil/Structural Operability Reviews. | Safe Shutdown Operability Determination |
ML20116D296 | 31 August 1992 | Rev 2 to Nuclear Generation Group Manual 305-05, Prioritization Process | Probabilistic Risk Assessment Earthquake |
ML20044G614 | 31 July 1992 | Rev 0 to 92C1737A, Recommended Operability Review Criteria for Piping Sys Subj to Level D Svc Loadings for Carolina Power & Light Nuclear Stations. | |
ML20099G310 | 17 July 1992 | Rev 1 to Procedure WDP-002, Phase II Walkdown Procedure for Reactor Building Miscellaneous Steel & Drywell Platform Steel | High Radiation Area Coatings Scaffolding |
PM-91-038, Rev 0 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & Rhr | 21 May 1992 | Rev 0 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & Rhr | Safe Shutdown Anticipated operational occurrence Process Control Program |
ML20056D601 | 19 November 1991 | Rev 2 to Performance Test Procedure 2-PT-24.6.4, SWS Hydraulic Performance Test for Bsep,Unit 2 | |
ML20082H752 | 21 August 1991 | Rev 11 to ODCM | |
ML20082H750 | 21 August 1991 | Rev 3 to Process Control Program | Process Control Program |
ML20083A654 | 19 August 1991 | Rev 1 to Design Guide DG-VIII.50, Instrument Setpoints | Safe Shutdown Earthquake |
ML20056D600 | 25 January 1991 | Rev 1 to Performance Test Procedure 1-PT-24.6.4, SWS Hydraulic Performance Test for Bsep,Unit 1 | |
ML20062C393 | 15 October 1990 | Rev 28 to Plant Emergency Procedure PEP-02.1, Initial Emergency Actions | Reactor Vessel Water Level |
ML20062C399 | 11 October 1990 | Rev 5 to Plant Emergency Procedure PEP-02.6.10, Emergency Security Team Leader | |
ML20081E739 | 20 April 1990 | Rev 6 to 25-2F, Operator Training Student Study Matl. Related Matl Encl | Squib |
ML20205S701 | 22 April 1988 | Rev 4 to Emergency Operating Procedure EOP-01-LEP-02, Alternate Control Rod Insertion:LEP-02 | Scram Discharge Volume |
ML20205K907 | 13 April 1988 | Rev 0 to Alternative Safe Shutdown Procedure ASSD-00, User Guide | Safe Shutdown Ultimate heat sink Emergency Lighting Earthquake |
ML20205S766 | 8 April 1988 | Rev 5 to Emergency Operating Procedure EOP-01-UG, Users Guide | Safe Shutdown Shutdown Margin Fuel cladding Failure to Scram |
ML20205S689 | 8 April 1988 | Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, End Path Procedure 2B | |
ML20205S698 | 8 April 1988 | Rev 4 to Emergency Operating Procedure EOP-01-LEP-01, Alternate Coolant Injection | Squib |
ML20205S709 | 8 April 1988 | Rev 3 to Emergency Operating Procedure EOP-01-LEP-03, Alternate Boron Injection | Boric Acid |
ML20205S772 | 8 April 1988 | Rev 6 to Emergency Operating Procedure EOP-01-ACCP, ATWS - Containment Control Procedure | |
ML20205S744 | 8 April 1988 | Rev 3 to Emergency Operating Procedure EOP-01-SRP-NSW, Nuclear Svc Water Sys Recovery | |
ML20205S799 | 8 April 1988 | Rev 4 to Emergency Operating Procedure EOP-01-EPP-1M, End Path Procedure 1M |