CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 PROCEDURE TYPE:

ALTERNATIVE SAFE SHUT 00WN PROCEDURE NUMSER:

AS50-14 PROCEDURE TITLE: DIESEL GENERATOR BUILD'NG 23' ELEVAT 01ESEL GENERATOR CELL 2 Rev. O A B:

l 4/4/88 Y

ONL. h**4 m

8f INF0 w.tt5tt.a ?#Jr%

t mefitat FOR

/

u dxu m Mete %

r nd or fvh's ptet tit e

dJ {ft.

l t

f Nato > u i

,A bi r tra p %L s

4 4

o c;erve 15.;IM or de

/

wi l

1 l

l fff"!W Date:

Approved By: ~ General Riiiigli7Ranage he~ rations l

l Rev. O BSEP-2/A550-14 Page 1 of 11 8811110065 001025 i

PDR ADOCA ObOOO324 D

T0lal

LIST OF EFFECTIVE PAGES ASSD-14 Page(s)_

Revision 1-11 0

R S.:

l l

l l

BSEP-2/ASSD-14 Page 2 of 11 Rev. O

l A.

TITLE Diesel Generator Building 23' Elevation Diesci Generator Cell 2 l

B.

_RE FEREti_CES 1.

Per 10 CFR 50 Appendix "R" Sections Ill.G & L.

2.

Per 10 CFR 50 Appendix H"Section I!!.J.

l l

C.

Et4TRY CONDITION l

l inis procedure is entered frora Alternative Safe Shutdown Index ASSD-01.

1.

A fire has occurred in an area containing Alternative Safe

~

Shutdown Train B equipment, AND 2.

The Shift Foreman has determined that the reactor is to be

~

brought to Cold Shutdown using Alternative Safe Shutdown Train A.

l l

The purpose of this procedure is to provide supplemental actions to be used concurrently with E0Ps and other operations procedures to achieve 7nd maintain Cold Shutdown coincident with or without a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loss of off-R B.I l

site power.

l D.

OPERATOR ACT!0fiS 1.

IF while executing this procedure, the fire is extinguished AND tKe Shif t Foreman determines that no action within this j

procedure is required T_ HEN Exli this procedure.

l 2.

OBSERVE the following parameters on instruments indicated while

~~

l performing actions to achieve and maintain cold shutdown.

Instrunent Location 2-CAC TR-4426-1 Suppression Pool Temp. (Pt.1)

Control Room Panel 2-CAC-LR-2602 Torus Level Control Room Panel 2-C32-P!-R605 Reactor Pressure Control Room Panel 2-C32 L1-R606A Reactor Water Level Control Room Panel 3.

IF re ntor building entry is required to restore g monitor i

l equipraent THEN i

a.

DISPATCH the following minimum manpower for performance of this procedure:

Reactor Building - 1 Auxiliary Operator BSEP-2/ASSD-1A Page 3 of 11 Rev. O L

.V

_ b.

OBTAIN the following keys from the Shift Foremm's Key Locker (1)

ASSD Equipment Cabinet Key #148 (1)

ASSD Flashlight Tool Box Key #160 j

_ c.

OBTAIN Security Access Keys from SAS Security Officer f

located in the Control Room AND PROCURE the following equipment from the ASSO f

liiuipmentCabinet i

_F_or Reactor _ Building

_(1)

Flashlight

~~~ ((1)

Sound powerer' phone 1)

Twenty-five teot sound powered phone extension cord (1) Copy of this procedure (3) Remote Shutdown Keys Serial T112

,_ _ (1)

Security Access Key l

L d.

USE appropriate figures in this procedure to nrovide access / egress routes, equipment and comuntutJon I

locations.

I 4.

IF Nuclear Service Water to Vital lleader Valve, 2-SW-V117 U NNOT be operated from the RTGB, THEN Manually OPERAir M W V117.

i I

S.

IF ' Nuclear Service Water Supply Valve, 2-SW 1105 CANNOT be Werated from the RTGB, THEN Manually OPERATE 2-57-VfDT.

l 6.

IF Conventional-Nuclear Header Cross-tie Valve, 2 SW-V102 i

UNNOT be operated from the PTGB, THEN Manually OPL3 ATE' I

R W V102.

7.

IF operation of RHR Service Water System is required AND RHR Te~rvice Water Booster Pumps are NOT_ available. THEN RUTR to i

~

0P-43.

[

8.

IF operation of HPCI Steam Supply Inboard Isolation Valve, f

Y~E41-F002 is required AND power is NOT available from MCC 2XD, THEN l

l t

a.

PLACE the circuit breaker control switch in the OFF l

position for HPCI Steam Supply Inboard Isolation

{

Valve, 2-E41-F002, at MCC 2XD compartment DW1.

l l

t b.

PLACE the circuit breaker control switch in the ON position for HPCI Steam Supply Line Isolation YaTve,

}

2-E41-F002, ( ASSD FEED) at MCC 2XC compartment 051.

j B5EP-2/ ASSD-14 Page 4 of 11 Rev. 0

[

I l

i

+

__c.

IF 2-E41-F002 is required to be Open THEN PLACE the MSD Keylock Control Switch in the OPEN position, at

~

MCC 2XC compartment DS1.

d.

IF 2-E41-F002 is requised to be Closed. THEN PLACE We ASSD Keylock Control Switch in the CT05T

~

position, at MCC 2XC compartment 051.

9.

IF operation of HPCI Turbine Exhaust Vacuum Breaker Valvs.

TE41-F079 is required _AND_ power is NOT available from hCC 2XB,

.TH E N_

a.

PLACE the circuit breaker control switch in the OFF position for HPCI Turbine Exhaust Vacuum Breaker Valve, 2-E41-F079, et MCC 2XB compartment 9Q0.

b.

PLACE the circuit breaker control switch in the ON

~~

position for HPCI Turbine Exhaust.Vacuur. Breaker 7alve, 2-E41-F079, ( ASSD FEED) at MCC 2XC compartment DT2.

c.

IF 2-E41-F079 is required to be Open. THEN PLACE the ESD Keylock Control Switch in the OPEW po'sition, at

~~

MCC 2XC compartment DT2.

d.

IF 2-E41-F079 is required to be Open, THEN PLACE'tSe E SD Keylock Control Switch in the CLOTE position, at MCC 2XC compartment DT2.

A S..

10.

IF operation of Shutdown Cooling Outboard Suction Throttle Tilve, 2-E11-F008 is required AND power is NOT availabl,e f rom MCC 2XDB,_THEN a.

VERIFY OFF OR PLACE the circuit breaker control switch in tTie OFF position for Shutdown Cooling Suction ThrottTe7alve, 2-E11-F008, at MCC 2XDB compartment B50.

b.

PLACE the circuit breaker control switch in the ON position for RHR Suction Isolation Valve, 2-E11-T608.

(ASSD FEED) at MCC 2XDA compartment B26.

c.

IF 2-E11-F008 is required to be Open. THEN PLACE We Close/Off/Open Keylock Switch in the OPEN position, at MCC 2XDA compartment B26.

I d.

IF 2-E11-F008 is required to be Closed. THEN' PLACE We Close/Of f/Open Keylock Switch in the E5sE_

position, at WC 2X0A compartment B26.

g 11.

KN Shift Foreman determines:

a.

Power is available from MCC 2XD for operation of HPCI Steam Supply Inboard Isolation Valve, 2-E41-F002, THEN BSEP-2/ ASSD-14 Page 5 of 11 Rev. O

(1)

PLACF. the circuit breaker control switch in the ON position for HPCI Steam Supply Inboard Tsolation valve. 2-E41-F002, at MCC 2XD compartment DW1.

/

Ind/ Ver (2)

PLACE the circuit breaker control switch in the _OFF position for HPCI Steam Supply Line Inboard Isolation Valve. 2-E41-F002

( A550 FEED) at MCC 2XC compartment 051.

/

Ind/Ver (3)

PLACE the ASSD Keylock Control Switch in the OFF position, for HPCI Steam Supply Line Isolation Valve. 2-E41-F002, at MCC 2XC compartment 051.

/

Ind/yer b.

Power is available from MCC 2XB for operation of HPCI Turbine Exhaust vacuum Breaker valve 2-E41-F0797 THEN R d.

(1)

PLACE the circuit breaker control switch in the ON position for HPCI Turbine Exhaust 7acuum Breaker valve 2-E41-F079, at MCC 2XB compartmerit DQO.

l l

~~

Ind/Ver (2)

PLACE the circuit breaker control switch in the OFF position for HPCI Turbine Vacuum Trifaker Valve. 2-E41-F079. ( ASSD FEED) at MCC ?IC compartment DT2.

/

Ind/Ver j

(3)

PLACE the ASSD Keylock Control Switch in the OFF position for,HPCI Turbine Vacuum Breaker Valve. 2 E41-F079, at MCC 2XC compartment DT2.

4 Ind/Ver BSE P-2/ AS50- 14 Page 6 of 11 Rev. O

\\

i

l c.

Power is available from MCC 2XDB for operation of

~

Shutdown Cooling Outboard Suction Throttle Valve.

[

2. Ell-F008,_THEN i

(

(1)

PLACE the circuit breaker control switch i

[_

in the ON position-for Shutdown Cooling OutboarTsuction Throttle Valve, 2-E11-F008, at MCC 2XDB compartment 850.

l w

j Ind/ Ver (2)

PLACE the circuit breaker control switch in the 0FF position for RHR Suction e

Isolation Valve, 2-E11.F008, ( ASSD FF.ED) at MCC 2XDA compartment 826.

i l

/

Ind/Ver j

l (3)

PLACE the Close/Off/Open Keylock Switch in i

l' the _OFF position for RHR Suction Isolation i

Valve, 2-E11-F008, at MCC 2XDA compartment l

B26.

L l

L

/

i Ind/Ver AS 12.

WHEN:

a.

The fire has been extinguished AND l

l b.

All breakers. AND/0R switches operated in this i

i procedure are restored to their normal position AND I

c.

No actions within this procedure are required to t

achieve or maintain Cold Shutdown, THEN j

L d.

EXIT this procedure.

I f

Date/ Time Completed Performed By (Print)-

Initials t

i l

Reviewed By:

Shif t Foreman

(

BSEP-2/ ASSD-14 page 7 of 11 gey, g L

-_ CON TROL BUILDING 40MTM

.amm

- - - ~ ~

M TO UNIT N3.2 TO U IT NO.I MEAC TOM gDL EL. SO' O.*

MEA C TOM SL C3. EL SO' O"

.----.a

',,,';n,'

PNL di lJ T

powy y

P ro,. w 7 Y I..- -

l y

\\~,~~,,T,g7, a

s

" '?

l I: l1 l

~

f

'. nit Na lll n

t i

y a nit-Pete '

l ccwrM0L l

l Hit P614 if nocW

(

l' i

i r

l "I "? ?'

'.ui}.p

\\ l n

l a nrt-ritt 0

l

!H!!-Pet 3l i

i i

r i (

(

'l l

h

. q;i Q 9,/

l ta.

c2 C

e I... _....

.., w, C, nea r h

- - - - - + - -

its v ots r,

"-(itsy otsr.

L PNL 4A PNL 3A y, g o g, 70: CICsCL GENEMATOM BUILolNG, SERVICE WATEM SUILDING, MEACTOM DUILolNG AND THE EAsi ramo..

.GMLRQ.LLED ACCESS s_ntitzwA1, R B.

coa, its/tsov oc its/tsov oc

/s WI TCHB OA Ro 18 me *-----*=

~ m % swtTCH80ARo 28&4----

= * - - - "

==*

. y *'*

p(

i

__;e l*. s l

' *0" l ' '

reou tL.

49'*0 fl\\

yg.,

gg I a p'. 0*

l og sgr.

sgr uso r-(Qul M c toar-te h 7

~~l sarr ca nasta N_P 7

ser1 Cwanete g

I!!*3*IrC*ls

\\

[

\\

G

./

,/

sign searcnts I

l aos "8

vs A 8'

r'l s'a r t UNIT I CABLE 8

Barr %*

UNIT 2 CABLE srREso AREA srMEA0 AnEA

,._ f

"'f"i

^

swlicH80Ano 2A) EL n*-0^* %tts/tsov oc 125/tsov oc switcHBoApo te LEGENO f enCht JACK,inAIN A CR 8

- ~ ~ ACCtss/t0MEs$

FIGURE 1 Control Building 23'0" and 49'0" Elevations Access / Egress and Sound Powered Phone Comunications BSEP-2/ASSD-14 Page 8 of 11 Rey, O

MonrH UNIT 2 MEACTOM BUIL0ll.1_

l W6

,e J

f I

I I

I }E!

,r0 a n 0g r

3 ro a race s o '- o *

-3 y

3 0 '- 0 * (L f va r/C N ELE VA M =

l

~'XAIO4AI OMYWEll.

A 2XS(OSZ) -

=

A j

,,)C,

~MCC2XDA X#nW ~e n

MCC 2XS -

-ygg fys

=

l A

1

~

M,C C, -

sf

,0 y-Q,b f

2XB-2 R$0P-

=

REMOTE SMUTOOWN V

a h

) '}

f~}

PANEL W RD 70 0 FROM

.s.1 ca. __r

'1b l

l

/

::]'

30'.0" (L[YATM- _:::f/ i x%

,5

/

]

n a*

To a FROM EL EVA TION 17'd'~

MCC 2x

~

M" MCC2xC y

ELEVAil0N 20 '- 0

  • LEGEN0 f PHONE JACK, TRAIM A OR 8

~ ~ ~ ~ ACCESS /EGMESS e /SQL AT! SWITCH FIGURE 2 Unit 2 Reactor Building 20' -0* Elevation Access / Egress and Sound Powered Phone ComJnic8tions BSEP-2/ ASS 0-14 Page 9 of 11 Rey, 0

s UNIT 2 REACTOR BUILDING N0nTM I

j.

1 2 f//-f06tS lN N

N N

r I

(EL EV. 4S O")%"

  1. 2 t/l*f040A Y

(ELEV, $$' 0")

f 70 & FROM 20 0~tttys/xw Y

%T0 e rnow t

i L

20 o*fLEVATION C

\\

l $b

"l I 09YWfLL

-l i

)

/

I

,/

RB

~

L

=

+._

s 2 Sw VICS # ~

i

\\ 'p e _ f ~f -SF-VKM 2

9

-1 (-

70 & FMOM L &

kN

,# 6 1

N F' TM D

ELEVATION r

2 sw-EL. S0'-d,

aussw ruurs yjg LE0tNO t

-ummimuses=r-

~ ~ ~ ACCESS /tentst a vnvts i

FIGURE 3 Unit 2 Reactor Building 50' -0* Elevation Access / Egress BSE P-2/ AS50 14 Page 10 of 11 Rev. O t

I l

UNIT 2 QEACTCM BUILOING koern

~

/

/

s CMYWELL

\\

/

J

. s

,,ca l.htynt0M 20' 0*

Lc=

\\

/

-ncic ruu!

TO & FROM nns g.ups l

9 9

ELEVATION 20'-0" Ra

~

EL.

I7*-0*

, <o --

j SEE DETAIL

\\

l EL 9 '- 0**

<\\

LADDER

~

s i

u jEGEND_

GRA TING "

y l

~ ~ ~ ACCESS /[GRESS a VALVES RHR HX' fP 4y &;

i

/

T

\\

NLA00ER l

2-S W-V/17 2 SW Vitt EL. (A PPR OX) + 2'- 0" EL. (AFPROX)-t' 0" l

EL. 9'- 0"_

l l

F1GURE 4 U11t 2 Reactor Building -17' -0" Elevation Access / Egress BSEP-2/A550-14 Page 11 of 11 Rev. O l