_ - _ - - -.

I

  • - 1

.J. -

CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT UNIT 0 EMERGENCY OPERATING PROCEDURE-01 E0P-01-LEP-02 ALTERNA12 CONTROL ROD INSERTION: LEP-02 VOLUME VI Rev. 004 FOR INFO O'al.Y m!r.tsnance,tritt eni!!stit.

t is t e

stems, exwnent activite,

pottobe t$ed to piffen cptratt W rJaipu!sts p' ant sy charf4 PtIts W ly!4xdot design

/

%/

Datet kV N Approved By:

Gener(1 Manager /f-

'I

/

Manager - Operations Page 1 of 12 8811110145 081025 gDR ADOCK050gy4 m

4 LIST OF EFFECTIVE PAGES E0P-01-LEP-02 Page(s)_

Revision 1-3 4

1 4

3 5-7 4

8-12 3

l l

l i

f I

L i

BSEP/fol. VI/EOP-01-LEP-02 Page 2 of 12 Rev. 4 i

l-

A.

,TITt.E - Alternate Control Rod Insertion B.

ENTRY CONDITION As directed from Flovpath 1, 2, 3, 4, or 5.

C.

OPERATOR ACTIONS (Alft>4ft CmfRA 200 IpMAfloM PROCEDtsit 1

FOR IW0munfl0No ACAl*l DOAQH

> ll Cw M ACAt 28 4Cf0R H SWT DC 1s0 I

eff 0Rt stPPAliSION POOL r

7 fletAafuM Ulf M 'tWO PatW

\\ttatMES Il8'f Pn0Crount* On Flee PATH ACAl*2 Stikt flLICuftD M

~

CD AND uttuft if CDCtmAthTLY tifM TMil Con $x"b Tis k

J ACal 8 tmst4fta fg PollI10M is aCAl-4 w0 r

FULLY Ik$taf ALL CONTROL R00$ Of Pt# 0Rutal SECfl >

I W TMil PRott0LAt dI,g y M

k J ACAl-4

$*f CCM

=

ACAl-S r

7 NO BrPASS Stanu elsCwants v0Ltadt Mi&H Livil TRIP AND M5ti F5 aLL SCA4m L

J yg3 V&Lvt3 0FLM AS ACAI-14 impttaita af Stut $CA44 Li6ut$ > ftLL CORE DISPLAf EATRI g g,y E f g

r c i-is

.in,r 70,o.a SCR4m vu,vts af PtN caulpt MCflom I & TMil PA0Ctpst FerPtis Matica SCaam A47 k

d Dalvt COMf*0L A005 V5thi aCAg-8 SE 4C f 04 d AW4L C ONim0L 7

lt S

60 l$

F thstaf Ah? CChf ax ROD myg ga L PA0C40Lmt CmCupathfLT j grullt Ikitetto flTH Sv5f t$ tNENC SCA44 v m HW 6 cal 16 lhl g

MCfl> $ W TMil L

PeOCI DL*f J

ACAl-4 NO T13 WS l

ACRI 21 mut r

vint Citvilf> ARta,j vtAttf Staat 015CM4Mt c '*lI W 4MT CONI"0L A00 *01.

gout vtpf *0 Opulu 7

ulkt S Cfl

?

g m

Pt,ly im ww E j

r imiiT I M T-7 I* I 0/ m L

f f&

SCA&M Comin0t SeifCu 70 M eiscw.mst votv=t 50

  • i=0P= Posifica aa0 fatz vtat eD canin vaLvts acwLuf 4AILY PtaCl>$ M AAI PLM 5'"

' Cal-18 F

"Hf f.'@f lustat of C0wfax n00 t

f

%' ansi'!!"'dJ" n' a' "

its FOR IW C4m4fl04 M PLMOAulhi SECTIDM SW F

THI$ PPMI.D@(

M4C7QA WCCL SeiiCM 18.5i M 2

in 'saufgw ^m 'auttL' TO Ptwmu stCilm 6

  • ra's **==

ai-a

'30% J tMMP L

J & cal t$

BSEP/Vol. VI/EOP-01-LEP-02 Page 3 of 12 Rev. 4

Section 1 - The purpose of this section is to ensure all control rods are fully inserted following a scram.

1.

IF fuel failure is suspected THEN PLACE the DISCH VOL VENT & DRAIN

~

YEST switch to "ISOLATE."

~

2.

& CRD is NOT needed to maintain reactor vessel level AND normal

% trument air is available, EEN, PERFORM the followin'g7 tepst

~

0 e.

7P' FY ecrn discharge volume vent and drain valves are closed.

.)

i'ent 'i 'ves C11(C12)-CV-F010 AND C11(C12)-V139.

PD Drain Valves C11(C12)-CV-F011 AND C11(C12)-V140.

l b.

iM th -

txCH VOL HIGH TRIP BYPASS, C71(C72)-S4, keylock PASS."

.'.uh to 4

l c.

Un; 2 e.4y - IF the ARI AUT0/ MANUAL INITIATION control switch was placed in tiie "INOP" position THEN PLACE the switch to the "AUT0" position.

NOTE To reset ARI, the reset 4 witch must be held in "RESET" position for 5 seconds.

l d.

Unit 2 only - E ARI was initiated THEN RESET ARI.

e.

RESET RPS.

3.

DETERMINE control rod position using OD-7, Option 2 full core display, four rod group display, or RWM NUMAC.

4 IF any control rod is NOT fully inserted THEN INSERT control rods by performing the following steps a.

PLACE the REACTOR HODE SWITCH to "REFUEL."

b.

BYPASS the rod worth minisitzer, c.

INSERT control rods with the EMERGENCY ROD IN NOTCH OVERRIDE

~

switch.

5.

WHEN all control rods are fully insarted THEN PERFORM the following steps:

a.

NOIITY the Shift Foreman, b.

IF boron injection was cor.tnenced. THEN TERMINATE boron injection.

BSEP/Vol. VI/EOP-01-LEP-02 Page 4 of 12 Rev. 3

c.

I t' fuses were pulled to deenergize the scram pilot valve solenoids, JHEE VERIFY INSTALLED the following fusest l

Ind. Ver.

/

(1) "In, Panel H12-P609. Terminal Board CC-C71A (C72A)

Fuse in Position F18A Fuse in Position F18E

~

Fuse in Position FISC Fuse in Position F18G

/

(2)

In Panel H12-P611. Terminal Board CC-C71A'(C72A)

Fuse in Position F18B Fuse in Position F18F Fuse in Position F18D Fuse in Position F18H d.

IF jumpers were installed to bypass the reactor scram. THEN REMOVE the f ollowing jumpers:

Ind. Ver.

/

(1)

In Panel H12-P609 From Fuse Block F14A to Terminal 4 of Relay K12E From Fuse Block F14C to Terminal 4 of Relay K12G

/

(2)

In Panel H12-P611 From Fuse Block F14B to Terminal 4 of Relay K12F From Fuse Eleck F14D to Terminal 4 of Pelay K12H s.

EXIT this procedure.

BSEP/Vol. VI/EOP-01-LEP-02 Page 5 of 12 Rev. 4

Section 2 - All scram valves are NOT open.

Th5 purpose of this section is to deenergize the scram pilot valve colenoids, initiate ARI (Unit 2 only), and vent the scram air header in order to open all scram l

valves.

1.

Unit 2 only - INITIATE ARI if not previously initiated.

2.

Unit 2 only - IF all scram valves are open, THEN RETURN to Flow Path Block ACRI-4 of this procedure.

3.

PLACE the following keylock RPS test chancel trip logic switches to

~

"TRIP" and RETURN to "NORMAL."

a.

Panel H12-P609

~~'

RPS TEST CH Al TRIP LOCIC RPS TEST CH A2 TRIP LOGIC b.

Panel H12-P611

~

RPS TEST CH B1 TRIP LOGIC RPS TEST CH B2 TRIP LOGIC 4.

IT all scram valves are open, THEN RETURN to Flow Path Block ACRI-4

~~

of this procedure.

5.-

PULL the following fuses to deenergize all scram pilot valve solenoids.

I s.

Panel H12-P609. Terminal Board CC-C71A (C72A)

Fuse in Position FISA I

Fuse in Position F18E Fuse in Position F18C 4

1 Fuse in Position F18G b-Panel H12-P611, Terminal Board CC-C71A (C72A)

Fuse in Position F18B Fuse in Position F18F Puse in Position F180 Pase in Position T18H l

6.

WHEN all control rods are no longer moving inward THEN, INSTALL the

~~

ToIIoving fuses to reenergize all scram pilot valve solenoidst s.

Fanel H12-P609. Terminal Board CC-C71A (C72A)

Fuse in Position F18A Fuse in Position F18E i

Fuse in Position F18C Fuse in Position F18G t

b.

Panel H12-P611 Terminal Board CC-C71A (C72A)

Fuse in Position F18B Fuse in Porition F18F Fuse in Position F18D Fuse in Position F18H BSEP/Vol. VI/EOP-01-LEP-02 Page 6 of 12 Rev. 4

7.

IF all scram valves have been opened, THEN RETURN to Flow Path

~

Ifock ACRI-9 of this procedure.

j 8.

VENT the scram air header as followst

~

I a.

OBSERVE scram air header pressure on C11(C12)-PI-R013 (located

~

by CRD instrument zack 20 foot elevation in the Reactor Building).

i b.

IF the scram air header pressure has decreased to O psig, THEN

~

TETURN to Flow Path Block ACRI-4 of this procedure.

c.

CLOSE Backup Scram Valves Instrument Air Isolation Valve,

~

C11(C12)-F095.

d.

RD40VE screw pipe cap on test connection for Pressure

~

Switch C11(C12)-PSL-3363 OR C11(C12)-PSL-3364 OR C11(C12)-PSL-N012 (locateTby CRD instrument rE k, 20 foot elevation in the Reactor Building).

e.

OPEN the instrument drain valve for the pressure switch selected in Step 8.d. as necessary, to vent the scram air header.

f.

WHEN the scram air header pressure decreases to O psig, _THEN PERFORM the following steps Ind. Ver.

/

(1) CLOSE the instrument drain valve for the pressure switch selected in Step 8.d.

/

(2) REPLACE screw pipe cap on test conntetion for the pressure switch selected in Step 8.d.

l,

/

(3) OPEN Backup Scram Valves Instrument Air Isolation Valve, C11(C12)-F095.

l 9.

RETURN to Flow Path Block ACRI-9 of this procedure.

BSE?/Vol. VI/EOP-01-LEP-02 Page 7 of 12 Rev. 4

Section 3 - h purpose of this section is to manually scram the reactor.

1.

ALLOW the scram discharge volume to drain for approximately 2 l

minutes OR until annunciator DISCH VOL HI WTR LVL CRD TRIP (A-05 1-6) cleais.

2.

Manually SCRAM the reactor.

3.

IF control rods did NOT move inward, THEN EXIT this section and EliOCEED to Flov Path Block ACRI-20 of this procedure.

~

4.

IF control rods moved inward, AM! the reactor is shutdown, THEN EXIT

~

tiiis section and CONTINUE in Section 1.

5.

IF control rods moved inward, AND the reactor is NOT shutdown, THEN RESET RPS.

i 5.

RETURN to Flow Path Block ACRI-15 of this procedure.

i r

l l

i i

i

[

t 1

i I

BSEP/Vol. VI/EOP-01-LEP-02 Page 8 of 12 Rev. 3

[

[

t l

I

t Section 4,- ALL scram valves are open; RPS CANNOT be reset.

[

r the purpose of this section is to install jumpers that bypass t

all scram signals and reset RPS.

l 1.

IF RPS will NOT reset AND power is available to the RPS bus, THEN i

IiPASS the reactor scram by installing the following jumpers f

~

s.

In Panel H12-P609. INSTALL the following jumpers:

From Fuse Block F14A to Terminal 4 of Relay K12E t

}

From Fuse Block F14C to Terminal 4 on Relay K12G b.

In Panel H12-P611 INSTALL the following jumpers:

I From Fuse Block F14B to Terminal 4 on Relay K12F From Tuse Block F14D to Terminal 4 on Relay K12H

[

2.

Unit 2 only - INHIBIT ARI by placing the ARI AUT0/ MANUAL INITIATION control switch to the "INOP" position and THEN momentarily placing i

the ARI RESET control switch to "RESET."

}

3.

RESET RPS.

4.

RETURN to Flow Path Block ACRI-17 of this procedure.

i f

I I

l t

A i

l BSEP/Vol. VI/EOP-01-LEP-02 Page 9 of 12 Rev. 3

Section 5 - A manual scram has been inserted and control rods did NOT move inward OR RPS was reset and the scram discharge volume vent and drain vaTves did NOT open.

The purpose of this section is to scram control rods with I

individual scram test switches.

1.

Unit 2 only - INHIBIT ARI by placing the ARI AUT0/ MANUAL INITIATION control switch to the "INOP" position and THEN momentarily placing the ARI RESET control switch to "RESET."

2.

RESET RPS.

3.

IF RPS CANNOT be reset, THEN CONTINUE on Plow Path Block ACRI-15 of E is procedure.

~

4.

INSERT control rods with individual scram test switches as follows:

s.

OBTAIN a copy of Control Rod Position Printout (OD-7, i

Option 2).

l b.

PLACE the individual scram test switch to the SCRAM position I

~~

for any control rod NOT inserted to Position 00.

c.

WNEN the control rod reaches Position 00 OR is no longer moving inward, THEN PLACE the individual scram test switch to "NORMAL" for the affected control rod in Step b.

l d.

REPEAT Steps b and e for all control rods NOT inserted to Position 00.

5.

IT all control rods CAN be inserted to Position 00, THEN EXIT this i

~~

section and CONTINUE in Section 1 of this procedure.

I 2

6.

IF all control rods CANNOT be inserted to Position 00, THEN EXIT this section and PROCEED to Flow Path Block ACRI-21 of this procedure.

r r

I i

e i

l BSEP/Vol. VI/EOP-01-LEP-02 Page 10 of 12 lev. 3 l

l

Section 6 - RPS CANNOT be reset, all scram valves CANNOT be opened OR control rods CANNOT be inserted with individual scram test switches or manual scrams.

The purpose of this section is to insert control rods with the Reactor Manual Control System.

1.

INSERT control rods with RMCS as follows:

a.

START both CRD pumps if available.

f b.

IF no CRD pump can be started. THEN CONTINUE in Flow Chart Hock ACRI-22 of this procedure.

~

c.

INCREASE flow controller setpoint to maximum.

d.

PLACE RWM NORMAL / BYPASS switch to "BYPASS."

e.

IF the REACTOR MODE SWITCH is in "SHUTDOWN " THEN PLACE the

~

EACT0A MODE SWITCH to "START & HOT STBY" position.

f.

INSERT control rods with the EMERGENCY ROD IN NOTCH OVERRIDE switch.

2.

WHEN all control rods ARE inserted to Position 00, ~THE., 'XIT this i

~

section and CONTINUE in Section 1 of this procedure 3.

IF all control rods CANNOT be inserted to Position 00, THEN EXIT Uiis section and PROIEED to Flow Path Block ACRI-22 of this

~

procedure.

l BSEP/Vol. VI/EOP-01-LEP-02 Page 11 of 12 Rev. 3

\\

...... _ _ _ _ _ _ _ _ _.. _ _., _ = _ _ = ~

n Section 7 - Control rods CANNOT be inserted by manual scrams, individual scrna switches, OR RMCS.

The purpose of this section is to insert control rods by venting the overpiston area of any control rod NOT inserted to l

Position 00.

NOTE CRD vent rigs are located in the LEP toolbox on the 20 foot elevation in the Rehetor Building.

1.

INSERT control rods by venting the overpiston area of any control l

~~

rod NOT inserted to Position 00 as follows:

a.

OBTAIN a copy of Control Rod Position Printout (OD-7, Option 2).

b.

CLOSE Withdrawal-Riser Isolation Valve, C11(C12)-102, for the control rod to be inserted.

c.

REMOVE vent plug on riser vent block for Drive Water Withdrawal Header Vent Valve, C11(C12)-F102, for the control rod to be inserted.

d.

INSTALL vent hose to floor drain.

e.

OPEN Drive Water Withdrawal Header Vent Valve, C11(C12)-F102.

2.

WHEN the control rod is NOT moving inward THEN PERFORM the

~

ToTroving steps Ind. Ver.

/

a.

CLOSE Drive Water Withdrawal Header Vent Valve, C11(C12)-102.

b.

REMOVE the vent hose from riser vent block.

1 Ind. Ver.

/

c.

REPLACE vent plug on riser vent block.

/

d.

OPEN Withdrawal-Riser Isolation Valve, C11(C12)-102.

e.

RETURN to Step 1.b for any rod NOT inserted to Position 00.

l 3.

WHEN all control rods are inserted to Position 00, THEN EXIT this 4

~~~

section and CONTINUE in Section 1 of this procedure.

4 i

BSEP/Vol. VI/EOP-01-LEP-02 Page 12 of 12 Rev. 3 l

l

_ _ _ _.. _ _ _..