ML20205S362
| ML20205S362 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/04/1988 |
| From: | Bishop E CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20205K904 | List:
|
| References | |
| ASSD-11, NUDOCS 8811110035 | |
| Download: ML20205S362 (3) | |
Text
c...
u n ;wa wa..;a..:
2-
- \\
1-O CAROLINA POWER & LIGHT COMP /,NY BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 n
PROCEDURE TYPE:
ALTERNATIVE SAFE SHUTDOWN PROCEDURE 1
iMSER:
ASSD-11 l
I PROCEDURE TITLE:
DIESEL GENERATOR COOLING WATER VALVE PIT Rev. O
{,)
R B.i 4/4/88 b
s@Q h 6, f
.$,f,,.'
- 4 y
, :*p*4??
c.,
1 1
I
- Nfich/
k A.0 Date:
l Approved By:
//
General Mahaiger/ Manage] - Operations Ga13 3 3 %
l Q,y
- DR ADocaOUN00$y l
PDR Rev. 0 BSEP-1/ASSD-11 Page 1 of 3 l
q%itti0t35
L15T OF EFFECTIVE PA625
.O AS$D 11 Pane (s)
Revision 13 0
MD G
\\
1 i
(
4 0
85EP-1/ A35011 Page 2 of 3 Rey, 0
/
)
7 i.
A.
TITLE Diesel Generator Cooling Water Valve Pit B.
REFERENCES 1.
Per 10CFR50 Appendix 'R' Sections Ill.G & L.
2.
Per 10CFR50 Appendix 'R' Section Ill.J.
C.
ENTRY CONDITION This procedure is entered from the Alternative Safe Shutdown Index ASSD-01.
1.
A fire has occurred in an area containing equipment common to Alternative Safe Shutdown Train A and Alternative Safe Shutdown Train B, AND The Shift Foreman has determined that the reactor is to be brought to Cold Shutdown using Alternative Safe Shutdown Train A AND/0R Alternative Safe Shutdown Train B.
/t s.
The purpose of this procedure is to provide supplemental actions to be
' 63) used concurrently with E0Ps and other operations proc 2dures to achieve and S-maintain Cold Shutdown coincident with or without a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loss of off-site power.
D.
OPERATOR ACTIONS None NOTE Train A AND Train B safe shutdown equipment will be operable from normal controls and power supplies for fire in this area.
No specific guidance is required by this procedu re.
i N$ A.
BSEP-1/ ASS 0-11 Page 3 of 3 Rev. O m-