ML20205S310
| ML20205S310 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/04/1988 |
| From: | Bishop E CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20205K904 | List:
|
| References | |
| ASSD-07, ASSD-7, NUDOCS 8811110020 | |
| Download: ML20205S310 (9) | |
Text
.
a. -..
G~
CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 PROCEDURE TYPE:
ALTERNATIVE SAFE SHUTDOWN PROCEDURE NU M ER:
ASSD-07 PROCEDURE TITLE:
REACTOR BUILDING 20' ELEVATION i
ECCS PIPE TUNNEL b
Rev. 0 i
4/4/88 R B.L QY
.90?g
\\h 5
l so S #.4
, qP&
9 o
dj f,'
y l
\\
t' Yf/6fff f
- ~ [
f Date:
Approved By: i I
[
i General Managt r/ Manager.pperations I
BSEP-1/ASSD-07 Page 1 of 9 Rev. O i
I estilloopo 001025 PDR ADOCK 05000324 P
PDH
LIST OF EFFECTIVE PAGES G)
ASSD-07 p
,)
Revision 1-9 R B.
(U t
I
(.,,
BSEP-1/ASSD-07 Page 2 of 9
A.
TITLE Reactor Building 20' Elevation ECCS Pipe Tunnel B.
REFERENCES 1.
Per 10CFR50 Appendix 'R' sections III.G & L.
2.
Per 10CFR50 Appendix 'R' sections III.J.
C.
ENTRY CONDITION This procedure is entered from Alternative Safe Shutdown Index ASSD-01.
1.
A fire has occurred in an area containing Alternative Safe Shutdown Train A and Train B equipment, AND 2.
The Shift Foreman has determined that the reactor is to be brought to Cold Shutdown using Train A and/or Train B.
The purpose of this procedure is to provide supplemental actions to be used concurrently with ECP's and other operations procedures to achieve and maintain Cold Shutdown coincident with or without a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loss of R g,l off-site power.
i h)
D.
OPERATOR ACTIONS 1.
IF while etect, ting this procedure, the fire is extinguished AND j
tTe Shift Foreman determines that no action within this l
procedure is required, THEN EXIV thi:. procedure.
l 2.
OBSERVE the following parameters on instruments indicated while perfor:ning actions to achieve and maintain cold shutdown.
Instrument Location l
1-CAC-TR-4426-1 Suppression Pool Temp. (Pt.7)
Control Room Panel 1-CAC-LR-2602 Torus Level Control Room Panel 1-C32-PI-R605A Reactor Pressure Control Room Panel 1-C32-LI-R606A Reactor Water Level Control Room Panel 1-CAC-TR-778 Suppression Pool Water Temp. (Pt.1)
Remote Shutdown Panel 1-CAC-LI-3342 Torus Level Remote Shutdown Panel 1-C32-PI-3332 Reactor Pressure Remote Shutdown Panel I
1-B21-LI-R604BX Reactor Water Level Remote Shutdown Penel 3.
,lF. reactor building AND/OR diesel generator building entry is required to restore,0J, monitor equipment, THEN a.
Dispatch the following minimum manpower for perfonnance of this procedure:
(.b.
BSEP-1/ASSD-07 Page 3 of 9 Rev. O
Reactor Building - 1 Auxiliary Operator Diesel Generator Building - 1 Auxiliary Operator b.
OBTAIN the following keys from the Shift Foreman's Key Locker
' ' ' (1 )
ASSD Equipment Cabinet Key #148 (1)
ASSD Flashlight Tool Box Key #160
~
c.
OBTAIN Security Access Keys from SAS Security Officer located in the Control Room AND PROCURE the following equipment from the ASSD WuipmentCabinet:
~
For Reactor Building Flashlights Sound powered phones Copies of this procedure Remote Shutdown Key, Serial T112 (1
Security Access Keys (1
Twenty-five foot sound powered phone extension cords For Diesel Ge'nirst3FButIdiii (1)
Flashlight p g,.;
(1)
Copy of this procedure (1)
Security Access Key (14) Door Wedge Blocks d.
USE appropriate figures in this procedure to provide access / egress routes, equipment and comunication l
locations.
4 IF Train B shutdown is requireo, THEN PLACE Reactor Water Level
'TORMAL/ LOCAL" switch,1-821-CS-3T45-~at the Remote Shutdown Panel, to the "LOCAL" position to make level indicator 1-821-LI-R604BX operable.
5.
IF Diesel Generator operation is required, THEN BLOCK OPEN DTesel Generator Building doors, as indicated on Attachment 1, to establish ventilation for Diesel Generator operations.
h.
BSEP-1/ASSD-07 Page 4 of 9 Rev. O
O CAUTION Performance of the following disables HPCI and P.CIC high area temperature logic.
6.
IF RCIC AtO/0R HPCI operation is required, THEN a.
PLACE RCIC Logic A Switch, B21-55A and RCIC Logic B Switch, B21-55B on panel H12-P614 in the TEST
- position, b.
PLFE HPCI Logic A Switch, B21-56A and HPCI Logic B Sw ',ch, 821-56B on panel H12-P614 in the TEST position.
c.
OPERATE RCIC AND/OR HPCI as required for a fire in the South side of the division wall in the ECCS pipe
- tunnel, d.
OPERATE RCIC as required for a fire in the North side Rd. 5 of the division wall in the ECCS pipe tunnel, n
7.
If operation of RMR Service Water System is required AND RHR
%vice Water Booster Pemps are NOT_ available, THEN RUER to
~~
i 8.
IF RHR is required for Torus Cooling AND/0R Shutdown Cooling, TIIEtt a.
OPERATE RHR Loop A OR, B as required for torus cooling.
b.
OPERAVE RHR Loop A for shutdown cooling for a fire in the South side of the division wai' in the ECCS pipe tunnel, g c.
OPERATE RHR Loop B for shutdown cooling for a fire in l
the North side of the division wall in the ECCS pipe tunnel.
)
- 9. 'WHEN the Shift Foreman determines RCIC AND/OR_ HPCI are no longer required for operation, THEN a.
PLACE RCIC Logic A Switch, B21-SSA and RCIC Logic B Switch, B21-55B on panel H12-P614 to the NORi%L position.
/
l l (fl Ind/Ver BSEP-1/ASSD-07 Page 5 of 9 Reo 0
E t
i b.
PLACE HPCI Logic A Switch, B21-S6A and HPCi Logic B.
g.
Switch, B21-S6B on panel H12-P614 to the NORMAL position.
/
a Ind/Ver
- 10. When the Shift Foreman detennines:
a.
Diesel Generator Building doors that were opened / blocked open for Diesel Generator ventilation are no longer required to be open, THEN RESTORE all Diesel Generator Building doors that were opened on to the closed position.
/
Ind/Ver b.
Reactor Water Level indicator,1-821-LI-R6043X, is no longer required THEN PLACE Reactor Water Level "NORMAL / LOCAL" Switch,1-B21-C5-3345 at the Remote Shutdown Panel, to the "NORMAL" position.
l l
R B.i Ind/Ver ggf
_ 11. WHEN:
f l
a.
The fire has been extinguished,AN_D b.
All breakers, W/OR switenes operated in this l
procedure are restored to their normal posicion, AND_
l c.
No actions within this procedure are required to achieve or maintain Cold Shutdown, THEN d.
EXIT this procedure.
Date/ Time Completed f,
Perfonned By (Print)
Initials I
t l
Q, Shift Foreman BSEP-1/ASSD-07 Page 6 of 9 Rev. 0-
V UfV i TT U E.
G U I4.L/ fly W ro uwir No.s ro u m r 8o.1 ntACTCO $ 0L th S$'0.,
..............3 ctAcron sLc.a, gg, gn. n,*
(')
l lPML 40 IC><G d l
00*w
/23rotsT}
(
It:3v 0/37; j }
'==='1
^
TO PML Jo s my e,
, 3 3 SQk sa:=!
,g up i
2,
\\
i=~it-rutt
.,1 R. Nit-ett3 1
r m~,
l'
/
ll I-#tt-Pfli
- /l !=Mll=Pitt '
l l g p=l Hit
- Pile
- CONTMCC, il if Moon i
n !=M/t = P 614
\\
l
'\\
l
'.MID=P Y l l
l ' 2-Mit-Pit!
0 l
1.Mit=P023l t
- l, t
33 g
i,
~[~~~~~~
- f_ _ _
f L;ggy o gy, litSV 013T.
PNL 3A PNL 4A gg gl,y I
T0: OttSEL GENERATOM OUILCING, StMVICC WATEM DUILulNG, REACTOM SUILDING AND THE LAST YAMO R0
_COMTMOLLEO ACCESS Emit!tWAY_
123/2$0v 0C tt3/2$0v0C C
^ me
$wtTCH80AMO 2D SWITCHBOAMOIR a m=
N em y
f., = " ;;-
y
~
,,0,ce.
, n'0.-
k W -
ye.o-p &g
- s-q)
- gr.
- g,r G
mo OJWAUG LOOLLA
- 7 *""** """l C a t' t CxJ a ggt
-==
==g, X
~"
m f" -
Daft CNenett
\\
f 2!lR SWITCMLB G
.l
,/
IffR SelfCMig t,.
eng N
M98 ht 0
- e
- e gA o.m pg UNIT l CABLE UNir 2 CARLt
^^ f Y L l carr.
w s!Mrso AntA SPMtA0 AntA 6--
o
$wtTCH80AMO 2A)
EL. 23'-O'
%It3/tS0V CC Its/tsov OC swtTCHs0AMO I A L totMO,
~ - ~ Acciss/E0Rtss f PMcNC JACK, TRAIN A CM R 1
f,l_GURE 1 Control Building 23'0" and 49'0" Elevations Access / Egress
,r and Sound Powered Phone Comunications BSEP-1/ASSD-07 Page 7 of 9 Rev, 0
=
UNIT l CEACTOM SUILDING MONTN l
h O
y b
d m
\\
fMON CONTR0t, y
UILDING ACCKss -
meumr
\\
\\
l ro e snow --
\\ /r m
so '-o '
,s,o'.,o,e,lsvar a
/
f
/
\\
) h OMYWELL
~ ' #'* f*
- A l
~
I stoss) p l
-ev u;z=::,1::
3, A -
r
-t
^
) s,,
ix u nsup
- *y' tyL >%
't cac sv toise ixo.:
Y t cac sv.ttsis j
nemort i
\\
' M W
')'
(,lh 79 a snos c~~.)
R C-so o*rLova wA i
%i
/
O" J'
I ro atrow y
= n '
y/ w_,.g~ /
EL EVA h0H 975 "-
t3 y g.g pyg,
lamie" MCCIXC g, y m-ELEVATION 20'0*
7 l
LtetNO f PHONE JACK, TMAIM A CR s
~ ~ ~ ~ ACCESS /t0 MESS e ISCL Art SWITCM i
I i
l I
FIGURL 2 Unit 1 Reactor Building 20' -0" Elevation Access / Egress and jf Sound Powered Phone Comunications j
RSEP-1/ASSD 07 Page 8 of 9 Rev. 0 l
DIESEL GEERATOR YENTILAT10N h
1.
OPEN/3 LOCK OPEN doors identifled on drawing below.
2.
BLOCK OPEN doors using door wedge blocks.
10 3 10 5 10 6 10 7 108 109 11 0 I!1 11 2 11 3 11 4 101 10 4
'k" p.
.............._...?
4 V"
W C'h hl l
R B.
/
0 E.]
s l
l-jyQ t="'
s s[ ggf
. l. (:L
. l. ail.CL.l.I:%
I i
i.:
$p p
8
' " "I I 1
1 i
=.I i
I
.I a
r E
c.
s
- ,=
.:r
=. c
=. o s
I w te I
I I
aI
-' nee rsl i
s I
10 2 l
aa*'s
< P "'"5 Y---
--. ?...
..Y.
..- n - - - - - - - - ?- - - - - - - - A EL. 2 3'-0 *-
I ATTACHMEKI 1 Diesel Generator Building Door Position For Diesel Cell Ventilation
.C BSEP-1/ASSD 0)
Page 9 of 9 hev.0 I
__.