Rev 0 to Alternative Safe Shutdown Procedure ASSD-13, Diesel Generator Bldg 23 Ft Elevation Diesel Generator Cell 1
ML20205S414
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/12/1988
From: Bishop E
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20205K904 List: ... further results
References
ASSD-13-01, ASSD-13-1, NUDOCS 8811110058
Download: ML20205S414 (12)


Text

, _

./

CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 PROCEDURE TYPE:

ALTERNATIVE SAFE SHUTDOWN PROCEDURE NUMBER:

A550-13 PROCEDURE TITLE:

DIESEL GENERATOR BUILO!NG 23' ELEVATION DIESEL GENERATOR CELL 1 Rev. 0 2/12/88 Q

lh

\\ks *.e o

. >c

.,V q0%,6Gr

$$ ;P).:l f

  • Il 9 #fy[

h L. t' Date:

Approved By:

A 3eneral Ma@ger7Mana)er-Opera tions

.[

B SE P-2/ ASSD-13 Pa ge 1 o f 12 Rev. 0 9811110050 001025g4 DR ADOCK 050 L

LIST OF EFFECTIVE PAGES ASSD-13 Page(*[

Revissen 1-12 0

A S.1 l

BSEP-2/AS50-13 Page 2 af 12 Rev. 0 1

A.

TITLE Diesel Generator Building 23' Elevation Diesel Generator Cel' 1 B.

REFERENCES 1.

Per 10 CFR SO Appendix "R" Sections Ill G & L.

r r 10 CFR 50 Appendix "R" Section !!I.J.

2.

e C.

ENTRY CNDITION This procedure is entered from Alternative Safe Shutdown Index AS50-01.

1.

A fire has occurred in an area containing Alternative Safe Shutdown Train A equipment, AND 2.

The Shif t Foreman has determined that the reactor is to be brought to Cold Shutdown using Alternative Safe Shutdown Train B.

The purpose of this procedure is to provide supplemental actions to be used concur, ently with E0P's and other operations' procedures to achieve and maintain Cold Shutdown coincident with or without a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loss oT-~

of f-site power.

8dl D.

OPERATOR ACTIONS 1.

IF while executing this procedure, the fire is extinguished AND 17ie Shif t Foreman determines that no action within this procedure is required THEN EXIT this procedure.

2.

OBSERVE the following parameters on instruments indicated while performing act f ans to achieve and maintain cold shutdown.

Instrument location 2-CAC-TR-7/8 Suppression Pool Water Temperature Remote Shutdown Panel 2-CAC-Lt-3342 Torus Level Remote Shutdown Panel 2 CAC-PI-3332 Reactor Pressure Remote Shutdown Panel 2-B21-L1-R604BX Reactor Water Level Remote Shutdown Panel 3.

,l_F reactor building entry is required to restore _0R monitor equipment THEN a.

DISPATCH the following minimum manpower for performance of this procedure:

Reactor Building - 2 Auxiliery Operator B SE P-2/ AS SD-13 page 3 of 12 pey, c) ', [, b. OBTA!N the following keys from the SOS Key. Locker-(1) ASSO Equipment Cabinet Key #148-(1) ASSO Flashlight Tool Box Key #160 . AND PROCURE the following equipment from the AS50 T6iiipment Cabinet: For Reactor Building (2) Flashlights (2) Sound Powered Phones (2) Twenty-five foot sound powered phone extension cords (2) Copies of this procedu're. (4) Remote Shutdown Keys, Serial T112 (2) Security Access Keys c. USE appropriate figures in this procedure to provide access / egress routes, equipment and communication locations. (Normal communications may not be available.) NO T,E, RBI Implementation of AS50-13 for Unit 1 will require Diesel

  • ~

Generator No. 3 to be cross-tied to 4KV Bus E2 via 4KV Bus El. When 4KV Bus E2 and Substation E6 are re-energized by Unit 1, Suppression Pool Cooling and Shutdown Cooling for Unit 2 can then be established using Train B safe shutdown equipment. (RHR pump 2D will not be available.) 4. PLACE Reactor Water Level "fiURMAL/ LOCAL" switch, 2-821-05-3345 at the Remote Shutdown Panel, to the "LOCAL" position to make level indicator 2-821-L1-R604BX operable. 5. IF RBCCW Heat Exchangers Service Water Inlet Valve, 2-SW-Y106 TANNOT be operated from the RTGB, THEN Manually OPERATE 2-SW-V106, 6. IF Vital Header Cross-tie Valve, 2-SW-V118 CANNOT be operated Trom the RTGB, TH,E3 Manually OPERATE 2-SW-V118. E 7. IF operation of RHR Service Water System is required AND RHR Tervice Water Booster Pumps are NOT available, THEtt RTTIR to OP-43, 8. IF operation of RCIC Steam Supply Inboard Isolation Valve. TE51-F007 is required AND power is NOT available from MCC 2XC, THEN a. PLACE the circuit breaker control switch in the OFF position for RCIC Steam Supply Inboard Isolation Valve,2-E51 F007, at MCC 2XC compartment 054 BSEP-2/A$$0 13 pa ge 4 o f 12 pey, n

l i b. PLACE the circuit breaker control switch in the ON position for 7,CIC Steam Supply Line Isolation VaTve, 2-E51-F007, ( ASSD FEED) at MCC 2XD compartment DY1. c. IF 2-E51-F007 is required to be Open, THEN PLACE the ESD Keylock Control Switch in the OPEN position at MCC 2XD compartment DY1. d. IF 2-E51-F007 is required to be Closed THEN PLACE the MSD Keylock Control Switch in the CLOSE position, at MCC 2XD compartment DY1. 9. IF operation of RCIC Turbine Exhaust Vacuum Breaker Valve, FE51-F362, is required AND power is _NOT available from MCC 2XA, THEN a. PLACE the circuit breaker control switch in the OFF position for RCIC Turbine Exhaust Vacuum Breaker Valve, 2-E51-F062, at MCC 2XA compartment DE4 b. PLACE the circuit breaker control switch in the ON position for RCIC Turbine Vacuum Breaker Valve, - 2-E51-F062, ( ASSD FEED) at MCC. 2XD compartment DW2. c. IF 2-E51-F062 is required to be Open, THEN PLACE tfie' ESD Keylock Control Switch in the OPEN position, at R. S.1. MCC 2XD compartment OW2. d. IF 2-E51-F062 is required to be Closed, THEN PLACE the MSD Keylock Control Switch in the CLOSE position, at MCC 2XD compartment DW2.

10. IF operation of RHR Suction Isolation Valve, 2-E11-F009 is required AND power is NOT available from MCC 2XA, THEN a.

VERIFY OFF OR PLACE the circuit br eaker control switch in the Off po~sition for RHR Suction Isolation Valve 2-Ell-f6DV, at MCC 2XA compartment DH3. b. PLACE the circuit breaker control switch in the ON position for RHR Suction Isolation valve, 2-E51-7609, ( ASSD FEED) at MCC 2XD compartment DX5. c. IF 2 E11-F009 is required to be Open, THEN PLACE the Rose /Of f/Open ASSD Feed Keylock Switch in the OPEN position, at MCC 2XD compartment DX5. d. IF 2-E11-F009 15 required to be Closed. THEN PLACE the ~ Hose /0f f/Open ASSD Feed Keylock Switch in the CLOSE -~ position, at MCC 2XD compartment DX5. l l B S E P-2/ A S 50- 13 Page 5 o f 12 oev, o I L

e

11. WHEN Shif t Foreman determines:

a. Power is available from MCC 2XC for operation of RCIC Steam Supply Inboard Isolation Valve, 2-E51-F007. THEN (1) PLACE the circuit bre;ker control switch in the ON Position for RCIC Steam Supply Inbo'a7d Isolation Valve, 2-E51-F007, at MCC 2XC compartment DS4. / Ind/Ver (2) PLACE the circuit breaker control switch in the OFF position for RCIC Steam Supply Line Isolation Valve, 2-E51-F007, ( ASSD FCED) at MCC 2XD compartment DY1. / Tn3/ Ver ( 3) PLACE the ASSD Xeylock Control Switch in the OFF position, for RCIC Steam Supply Line Isolation Valve, 2-E51-F007, at MCC 2XD compartment Dil.

  • ~ ~

R B.L / Ind/Ver b. Power is available from MCC 2XA for operation of RCIC Turbine Exhaust Vacuum Breaker Valve, 2-E51-F062, THEN (1) PLACE the circuit breaker control switch in the ON position for RCIC Turbine Exhaust Vacuum Breaker Valve, 2-E51-F062, at MCC 2XA compartment DE4. / Ind/Ver (2) PLACE the circuit breaker control switch in the OFF position for RCIC Turbine Vacuun Breaker Valve, 2-E51-F062, ( ASS 3 FEED) at MCC 2X0 compartment DW2. / Tnd/Ver BSEP-2/ AS$0-13 Page 6 o f 12 Rev. O

(3) PLACE the ASSD Keylock Control Switch in the OFF position for RCIC Turbine Vacuum Breaker Valve, 2-E51-F062, at MCC 2XD compartment DW2. / Ind/ Ve r c. Power is available from MCC 2XA for operation of RHR Suction Isolation Valve, 2-E11-F009 THEN (1) PLACE the circuit breaker control switch in the ON position for RHR Suction Isolation Valve! 2-E11-F009, at MCC 2XA compartment DH3. / Ind/Ver (2) PLACE the circuit breaker control switch in the OFF position for RHR Suction Isolation Valve, 2-E11.F009, ( ASSD FEED) at MCC 2XD' compartment DX5.- / Ind/Ver gg (3) PLACE the Close/Off/Open ASSD Keylock Switch in the OFF position for RHR Suction Isolation Valve, 2-E11 F009, at MCC 2XD compartment DX5. / Ind/Ver e. Reactor Water Level indicator, 2-821-LI-R604BX, is no longer required THEN PLACE Reactor Water Level "NORMAL / LOCAL" Swi tch, 2-821 05-3345 at the Remote Shutdown Panel, to the "NORMAL" position. / Ind/ Ve r

12. WHEN:

a. The fire is extinguished AND b. All breakers AND/OR switches operated in this procedure are restored to their normal position AND c. No actions within this procedure are required to achieve and maintain Cold Shutdown. THEN d. EXIT this procedure. BSEP.2/ ASSD-13 page 7 of 12 p,y, 9

Date/ Time Completed Performed By (Print) Initials Reviewed By: Shift Foreman R.B.L I i BSEP-2/ASSO.13 Page 8 of 12 Rev. O

SulL OldG, CCNTROL ro Unir no.2 ro UNIr w.t stACr0n gt.oa__ q. )so'.C .,,,,,,,,,,,,--,,--------,eq

  • e A C_ r0_n et c$ tt s o'.o.'

,'g'g' 'g',3 T b 00kN ' #VO'0K' k y y'k - y 00wn 3 2 A h ml@m 2 y,_,,,,,, 2-Mll=M623 t , Q, l s 3 g l lLd /[I ' -- - -l - N/2 -P 817 yl 2-HI2-P628 l l CONTMOL l l H12.P614 l l, ,_ ( j' y M00u i, n 2 M/2.P614 l h ~ 'k l -phs ! h lI I 0 l l-HI2= P623 l ~ g.ytt-P622-l s r i 1 1 -e. .Q l _..............r,d---- \\t2S V 015 T. IE0 V OIS Y' PNL 4A o PNL 3A , g, g, 70.' OIESEL GENEMATOM BUILDING, SERVICE WA TEM SUILDING, MEACTOM DUILDING AND R 8,2 THE EA S T YA MO.. C_QBTROLL EO ACCES$ BMEEZE_wA1_ 00eu !!S/b'SOV D C 23/2Sov CC my --wim $WITC180ARO 28' -agn-.., - = = $ MI TCH80A R0 lB a I: I ( l ,pg geg nou EL s reou et y l\\ 49'*0 f 49' 0* u gg pg p ,y C7JI M NT L00tE4 't - - ~,. v & M r ,, rr : j ,4rreu,,,, I!ER SWITCMES -s (. ./ \\ p ',/ srt, sert:ng, G W,*e M3 A gs og UNIT 2 CABLE CA!! W ,arr UNIT I C ABLE SPMEA0 AMEA SPREAD AMEA _muu puma a ] I E E SWI TCH80 A RO 2 A ) EL U L-Q'. 125/2 50V OC ~l23/250V CC SWITCHBCARO IA L tat 40_ fPHONE.taCs,7MAIMACR8 ~ ~ ~ ACCESS / CGMESS FIGURE 1 Control Building 23'0" and 49'0" Elevations Access / Egress and So';nd Powered Phone Co-nunications BSEP-2/A550-13 Page 9 of 12 Rev. J

1 I I UNIT 2 MEACTOM BUILDING Nonyx f c .-,J t l r wy t I I l r 70 e fM06/ ~ 30 '- 0 * ,,,) ~ l 270 e snow ~ l S 0'~ 0 " fL i varto g tttverr0W \\ jW -!XAl04A) OMYWELL A.j 2X9.(0$Z)-~ g ~ "ify- ),& } bv :& .00 e, s ~ "" #' ~ A MU" '~ 2XS-2 Q y t RSDP-REMOTE SMUT 00WM 70 a ##0#

i f

,,, \\ PANEL W = EG,,,,f' O', ; SOLO" ELEVArtCW- ,e I / l' l TO & FM0M n r,J % ' Y "" / EL E VA TION 17'd'- e --- MCC 2x0

  • ~

MCC2XC y ELEVATION 20'- 0

  • I

.r-l LEGENO f PHONC JACK, TMAlH A UR S l ~ ~ ~ ~ ACCESS / EGMESS e ISCL ATE SWITCH FIGURE 2 l Unid 2 Reactor Building 20'-0" Elevation - Access / Egress [ anc Sound Powered Phone Comunications i BSEP-2/ASSD-13 Page 10 of 12 Rev. O

i UNIT 2 REACTOR BUILDING l l NOMrs g 1 1 N lf 2 til 70608 (EL EV. 43'0")%*

  1. 2 til 7060A b

8 h,,. V (ELEV. SS' 0) 70

  • MW

~ 70 e incu E0'0"550# L== l 20*-0"EL EVATION I [ l = .r l t l M DMYWELL l l i l l l ~ b / R B.2. l j %g

o. f ~ye. -

g.sw.vlos # ~ r 2-tiv VM i ( C /( -( t n3. ELEVATION 't m T' G W 7 F' f i go'.o

  • i
2. sw -

EL. S0'-O' nunsa ruuts e i VI00 LEGEND \\ - -- sects:/tentss a vat.vts I 6 1 1 l FIGURE 3 f I l Unit 2 Reactor Building 50'-0" Elevation - Access / Egress i i a BSEP-2/ ASS 0-13 Page 11 of 12 Rev. O i 1 r~ --,------,n.. .,__,__-,,,u_,,,e.,,,

UNIT 2 REACTOR RUILOING vonrn N / \\ CMYWELL / \\ fo e FMod ELEVM MM 2 0'* 0" Lc=- \\ / '-Mcic ruur -T0 & FROM nnn ruurs ELEVATION 20'-0, { R.B.2 / ~ ~ EL. 17'-0* -~ ,..r. \\ SEE DETAIL EL 9 '- 0" f %' [(,gggg \\ "A \\ ~T ~ ~ $% LEGEND +i n ls GRAT/NG " - - - A CCESS/ EGRESS 7 fn 8 VA L VES RHR HX' / / \\ \\ LLA00EP 2-S W-Vll 7 2 - S W-VI18 EL. (A PPR OX) + 2'- 0" EL, (APPROX)-2' 0" EL. 9 '- 0" FIGURE 4 Unit 2 Reactor Building -17' -0" Elevation - Access / Egress i l Rev. 0 SSEP-0/ ASS 0-13 Page 12 of 12 .}}