Forwards Preoperational Safety Insp Rept 50-440/85-68 on 851015-18.No Noncompliance Noted
ML20198A969
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/01/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20198A972 List:
References
NUDOCS 8511060264
Download: ML20198A969 (2)


See also: IR 05000440/1985068

Text

I l

-

..

NOV .0. t g

Docket No. 50-440

. Docket.No. 50-441

The Cleveland Electric Illuminating

-Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, 0H 44101

Gentlemen:

This refers to the routine preoperational safety inspection conducted by

Mr. D..E. Miller of this office on October 15-18, 1985, of activities at Perry

' Nuclear Power Plant, Unit 1, authorized by NRC Construction Permit No. CPPR-148

and to the discussion of our findings with Mr. Kensicki and others at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective a

examination of procedures and. representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection

In accordance with 10 CFR 2.790 of the Commission's regulations, a cony of

this letter.and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sinterely,

" Original signed by ED. Shafer

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Report

No. 50-440/85068(DRSS)

See Attached Distribution

SDg -3)

8511060264 851101 ,\

ADOCK 05000440 y ol

PDR

G PDR p}i

i \

!

L. _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ ,

,

.

The Cleveland Electric Illuminating 2

Company

NOV 0.I g

Distribution

cc w/ enclosure:

J. J. Waldren, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

'

RIII RIII RII II

Mi r/1s G Kn p er

10/31/85 $cd

,