Forwards Safety Insp Repts 50-245/86-06 & 50-336/86-06 on 860324-27.Enforcement Conference Scheduled on 860618 to Discuss Apparent Loss of Mgt Control of Radwaste Program
ML20198Q837
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/30/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20198Q841 List:
References
NUDOCS 8606090395
Download: ML20198Q837 (2)


See also: IR 05000245/1986006

Text

. -.

O O

J MAY 3 01986

,

1

Docket Nos. 50-245 License Nos. DPR-21

50-336 DPR-65

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

i Engineering and Operations Group

P. O. Box 270

,

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Combined Inspection Report Numbers 50-245/86-06 and 50-336/86-06

A routine safety inspection of your solid radioactive waste preparation,

packaging and shipping program was conducted by Mr. P. Clemons of this office

on March 24-27, 1986, of activities authorized by NRC License Nos. DPR-21 and

DPR-65. Our findings were discussed with Mr. W. Romberg and other members of I

your staff at the conclusion of the inspection on March 27, 1986.

. The areas examined during this inspection are described in the NRC Region I

l Inspection Report which is enclosed with this letter. Within these areas, the

l inspection consisted of selective examination of procedures and representative

,

records, interviews with personnel and observations by the inspector. The

l inspection indicated an apparent loss of management control of certain aspects

of the radwaste program. Several items were identified as not being conducted

i in full compliance with NRC requirements. Details are provided in the

i enclosed inspection report.

We are concerned about the number of problems associated with transportation

!

requirements at Millstone Point Nuclear Power Station identified in the

i Inspection Report. In addition, similar problems were identified during an

,

inspection at the Haddam Neck Nuclear Power Plant as described in NRC Region I

j Inspection Report No. 50-213/86-04. Further, several violations were brought

to your attention in Notices of Violation dated June 18, 1985, for the

Millstone Point Nuclear Power Station and in June 24, 1985, for the Haddam

'

Neck Nuclear Power Plant. These violations and weaknesses in your program

'

were also identified in NRC Region ! Inspection Reports 50-245/85-11,

50-336/85-14, and 50-213/85-09. Accordingly, we have scheduled an enforcement

conference with you in the Region I office on June 18, 1986, at 1:15 p.m., t)

discuss the recent identified problems, previously identified violations and

j program weaknesses, associated causes, reasons for re-occurrence, and your

'

corrective actions. Enforcement action will be the subject of separate

correspondence at a later date.

'

0FFICIAL RECORD COPY

i

0 $

'

"

Le"L'

. .

,

'

Northeast Nuclear Energy Company 2

Your cooperation with us in this matter is appreciated.

Sincerely,

OrldO31Sl?"O&II

as . a r

/O vision of Radiation Safety

U and Safeguards

Enclosure: NRC Region I Combined Inspection Report Nos. 50-245/86-06 and

50-336/86-06

cc w/ encl:

E. J. Mroczka, Vice President, Nuclear Operations

W. D. Romberg, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Safety

Nuclear Public Document

Information CenterRoom (LPDR) (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Regior.IDocketRoom(withconcurrences)

ManagementAssistant,DRMA(w/oencl)

DRP Section Chief

M. McBride, RI, Pilgrim

P. Swetland, SRI, Haddam Neck

J. T. Shedlosky, SRI. Millstone 3

J. Shea, LPM, NRR

D. Holody, ES, RI

D. Osborne LPM, NRR

__

f'

c

4DRSS R SS

Lt6

RI{:DRSS RI RSS

/  !

lemons /mm Pasciak Bellamy M ' tNn )

4/gb/86 4/p/86 4/h/86 /4l/86

0FFICIAL RECORD COPY C/R MILE 86-06 - 0002.0.0