MAY 3 01986
J
,
1
Docket Nos. 50-245
License Nos. DPR-21
50-336
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
i
P. O. Box 270
Hartford, Connecticut 06141-0270
,
Gentlemen:
Subject: Combined Inspection Report Numbers 50-245/86-06 and 50-336/86-06
A routine safety inspection of your solid radioactive waste preparation,
packaging and shipping program was conducted by Mr. P. Clemons of this office
on March 24-27, 1986, of activities authorized by NRC License Nos. DPR-21 and
I
DPR-65. Our findings were discussed with Mr. W. Romberg and other members of
your staff at the conclusion of the inspection on March 27, 1986.
The areas examined during this inspection are described in the NRC Region I
.
l
Inspection Report which is enclosed with this letter. Within these areas, the
l
inspection consisted of selective examination of procedures and representative
records, interviews with personnel and observations by the inspector.
The
,
l
inspection indicated an apparent loss of management control of certain aspects
of the radwaste program. Several items were identified as not being conducted
i
in full compliance with NRC requirements.
Details are provided in the
enclosed inspection report.
i
We are concerned about the number of problems associated with transportation
!
requirements at Millstone Point Nuclear Power Station identified in the
i
Inspection Report.
In addition, similar problems were identified during an
inspection at the Haddam Neck Nuclear Power Plant as described in NRC Region I
,
j
Inspection Report No. 50-213/86-04.
Further, several violations were brought
to your attention in Notices of Violation dated June 18, 1985, for the
Millstone Point Nuclear Power Station and in June 24, 1985, for the Haddam
Neck Nuclear Power Plant.
These violations and weaknesses in your program
'
'
were also identified in NRC Region
!
Inspection Reports 50-245/85-11,
50-336/85-14, and 50-213/85-09. Accordingly, we have scheduled an enforcement
conference with you in the Region I office on June 18, 1986, at 1:15 p.m., t)
discuss the recent identified problems, previously identified violations and
j
program weaknesses, associated causes, reasons for re-occurrence, and your
corrective actions.
Enforcement action will be the subject of separate
'
correspondence at a later date.
0FFICIAL RECORD COPY
'
i
$
0
Le"L'
'
"
--
-
---
--
.
.
,
'
Northeast Nuclear Energy Company
2
Your cooperation with us in this matter is appreciated.
Sincerely,
OrldO31Sl?"O&II
as
a
r
.
/O
vision of Radiation Safety
U
and Safeguards
Enclosure: NRC Region I Combined Inspection Report Nos. 50-245/86-06 and
50-336/86-06
cc w/ encl:
E. J. Mroczka, Vice President, Nuclear Operations
W. D. Romberg, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR) (NSIC)
Nuclear Safety Information Center
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Regior.IDocketRoom(withconcurrences)
ManagementAssistant,DRMA(w/oencl)
DRP Section Chief
M. McBride, RI, Pilgrim
P. Swetland, SRI, Haddam Neck
J. T. Shedlosky, SRI. Millstone 3
J. Shea, LPM, NRR
D. Holody, ES, RI
D. Osborne LPM, NRR
__
RI{:DRSS
/
f'
Lt6
c
RI RSS
!
4DRSS
R
lemons /mm
Pasciak
Bellamy
M ' tNn
)
4/gb/86
4/p/86
4/h/86
/4l/86
0FFICIAL RECORD COPY
C/R MILE 86-06 - 0002.0.0
04/15/86
J