Forwards Insp Rept 50-425/88-10 on 880222-25 & Notice of Violation
ML20151B538
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/31/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Head G
GEORGIA POWER CO.
Shared Package
ML20151B541 List:
References
NUDOCS 8804080275
Download: ML20151B538 (2)


See also: IR 05000425/1988010

Text

. . _ _ _ _ _ _ _ _ __ _ _ _ _ _.

I

..

~'

$gl W

  • i

3 .

'

MAR 811988

Docket No. 50-425

License No. CPPR-109

Georgia Power Company

ATTN: Mr. George F. Head

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-425/88-10)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

M. D. Hunt on February 22-25, 1988. The inspection included a review of

activities authorized for .your Vogtle Unit 2 facility. At the conclusion of

the inspection, the findings we'e discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the ins;,ection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

>

ictivities in progress.

a

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

Your attention is invited to the unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

l In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be pla:ed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not sub. ject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

,

-. ,,

48R*RB85"ot888

Q

%'

'DCD

sI

- - . - . . . _ _ . . -

~ '- - - -

-

. y.

.

.. . MAR 81.1988

,.x .

.

4

Georgia Power Company 2

. . -

Should you have any questions concerning this letter, please contact us.

Sincerely,

Sl

Alan R. Herdt, Chief

4

Engineering Branch

Division of Reactor Safety

. Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

'

P. D. Rice, Vice President, Project

Director.

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager,

Nuclear Operatione

L. Gucwa, Manager, Nuclear Safety

and Licensing

-

J. A. Bailey, Project Licensing

Manager

,

B. W. Charchill ., Esq. , Shaw,

'

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of tN Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

l bec w/encls:

E. Reis, OGC

'

J. Hopkins, NRR

M. Sinkule, RII

! DRS Technical Assistant

! NRC Resident' Inspector

i Document Control Desk

i

State of Georgia

Merle N. Miller

RII R RI RI

M Hunt:er NNMiller TEConlon MVSinkule

03/g/88 p

03go/88 03gp/88 03/b/88