Partially Withheld Physical Security Insp Repts 50-424/88-14 & 50-425/88-11 on 880222-26.Violations Noted.Major Areas Inspected:Mgt Effectiveness,Security Program & Physical Protection.Details Withheld (Ref 10CFR2.790 & 73.21)
ML20151M596
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/28/1988
From: Mcguire D, Thompson D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20151M585 List:
References
50-424-88-14, 50-425-88-11, NUDOCS 8804250085
Download: ML20151M596 (1)


See also: IR 05000424/1988014

Text

,

' , , , , SAFEGLM3jNFORMATION

',/* o NUCLEAR REGULATORY COMMISSION

[ .' p REGloN 11

g Ij 101 MARIETTA STREET, N.W,.

  • i e ATLANTA, GEORGI A 30323

%...../

4

Report Nos.: 50-424/88-14 and 50-425/88-11

Licensee: Georgia Power Company

P. O. Box 4545

Atlanta, GA 30302

Docket Nos.: 50-424 and 50-425 License Nos.: NPP 68 and CPPR-109

Facility Name: Vogtle 1 and 2

Inspection Cond te - February 22-26, 1988

Inspectors: it/d/h //M[ . M b

A. T i ll'mpi, PriysTeal Security Inspector 4) ate Signed

Okk%he- DwLV 3 bO$l$$

,

D Th bpson, hysicalSe{urityInspector Dat'e Si ned

Approved by: .

- 28 88

D. R. McGuire, Chief, Physical Security Section Dhte 61gned

Nuclear Materials Safety and Safeguards Branch

Division of Radiation Safety and Safeguards

,

SUMMARY

'

Scope: This routine, unannounced physical security inspection included a

l

review and inspection of: Management Effectiveness -

Security Program;

l Security Program Audit; Records and Reports; Testing and Maintenance; Locks,

l Keys, and Combinations; Compensatory Measures; Access Control - Personnel;

Access Control - Packages; Access Control - Vehicles, and Physical Protection

'

Safeguards-Information. The status of corrective actions for previously cited

violations and licensee reported Physical Security Events was also reviewed.

l In addition, the inspectors attended the Project Director's weekly meeting on

i

the status of Unit Two construction and installation of security related

facilities and equipment, toured Unit Two facilities, and discussed the Unit

Two readiness review with the Manager of Readiness Review Group.

Results: Five violations of regulatory requirements were identified.

1. Failure to control access to a vital area.

2. Failure to control access to the protected area.

! 3. Failure to provide detection capability for areas of the protected

area barrier.

4. Security officer asleep on post.

5. Failure to control and secure Safeguards Information.

Elici,0sURE CO!i?AINS

r ATT.CUARD3 INFORMATION

CPO!! % PAP.ATIOtt T11f 3