Forwards Insp Repts 50-424/88-14 & 50-425/88-11 on 880222-26 & Notice of Violation.Concern Expressed Re Implementation of Security Program That Permitted Situation. Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML20151M581
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/30/1988
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Head G
GEORGIA POWER CO.
Shared Package
ML20151M585 List:
References
NUDOCS 8804250082
Download: ML20151M581 (3)


See also: IR 05000424/1988014

Text

.

.

.

SAFEGUARDS INFORMATION

-

( MM 30 W88

-Docket Nos. 50-424, 50-425

License Nos. NPF-68, CPPR-109

Georgia Power Company

ATTN: Mr. George F. Head-

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/88-14 AND 50-425/88-11)

This refers to the Nuclear _ Regulatory Commission (NRC) inspection conducted by

A. Tillman on February 22-26, 1988. The inspection included a review of

activities authorized for your Vogtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violations, references to pertinent requirements, and

, elements to be included in your response are described in the enclosed Notice

'

of Violation.

j In addition to the need for corrective action regarding the specific matters

, identified in the enclosed Notice, we are concerned about the implementation of

l your security program that permitted this situation to continue. Consequently,

l your response should describe those particular actions taken or planned to

i improve the effectiveness of your program.

The violation described in the enclosed Notice is similar to a violat.on

contained in the Notice sent to you by our letter dated September 4, 1987.

because "similar violations", as described in the NRC Enforcement Policy, are

of significant concern to the NRC, please give particular attention in your

i

l response to the identification of the root cause of this problem and your

failure to complete the corrective action to prevent recurrence, as stated in

your October 21, 1987, letter to the NRC Enforcement Action Letter EA 87-100,

dated September 4, 1987. Specifically, concerning your commitment to install

cipher pads at the entry turnstiles.

.

EttCLOS0nt CotrtAINS

3/.FECtfARDS IliF0PJzATION

l'PON SEPARATIOli THJ S

~"

eeouscoe2 esosso

gas noocxosoog4 RAFEGUARDS INFORMATl0E , s

-

'

'

"

SAFEGUARDS INFonyjg(goy

Georgia Power Company 2

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore, the en' closures

to this letter with the exception of the report cover page, which presents a

nonexempt summary,.will not be placed in the NRC Public Document Room.

The responses directed by this letter and its erclosures are not subject.to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

J. Philip Stohr, Director

Division of Radiation Safety

and Safeguards

Enclosures:

1. Notice of Violation

(Safeguards Information)

2. NRC Inspection Report

(Safeguards Information)

cc w/encis:

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr. , General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

cc w/o encis:

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/encls: (See page 3)

ENCLOSURE CONTAIN3

8AFEGUARb8 IWORMATION

t/PON SEPARATION THIS

'"*""*"'

AFEGUARDS INFORMATl0N

,

'

' -

SAFEGuggDS INFogMATIO

-

.

Georgia Power Company 3

ll

!

bec w/encis:

NRR/DRIS/SB

'

bec w/ Inspection Summary:

' Document Control Desk (RIDS IE04), 016

NRC Resident Inspector -

State of Georgia

s

r

i

l

l

.

l / W/fCd

RII RII - RII I I f

l

AT n:tj son DM u re ' Clin JS oh

03g/88 03p/88 03/ 8 03#3f/88

03%/88

RII RII RI I RII 1RII

fiSin le VBr lee Reyes s kGhard M st

03/f/88 03/;;9 /88 03/M/88 03' 8 03/ /88 0/ /88

l MCMSUR2 00HTArng

SAFECUARDS INFO.WATlay

SAFEGUARDS INFORMATION 'E' IEEoIIrSlIE -

w -

- . - - _