ML20151N619

From kanterella
Revision as of 01:55, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-298/85-26 on 850930-1004 & Notice of Violation
ML20151N619
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/24/1985
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20151N623 List:
References
NUDOCS 8601030035
Download: ML20151N619 (2)


See also: IR 05000298/1985026

Text

_ _ _ _ . . _ _ . _ -

[

b

, T .

, DEC241985

) In Reply Refer To:

Docket: 50-298/85-26 .

.

'

'

Nebraska Public Power District

ATIN: J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

'

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

lI the period September 30 through October 4, 1985,.of activities authorized by

-

NRC Operating License DPR-46 for Cooper Nuclear Station, and to the discussion

of our findings with Mr. P. V. Thomason, and other members of your staff at the

conclusion of.the inspection.

Areas examined during the. inspection included the radioactive waste activities

and controls for effluent releases. Within these areas, the inspection

) consisted of selective examination of procedures and representative records,  ;

>

interviews with personnel, and observations by the inspector. These findings

1

are documented.in the enclosed inspection report.

'

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

.

.Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

. Federal Regulations. Your response should be based on the specifics contained

! in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

,

by the Paperwork Reduction Act of 1980, PL 96-511. -

!

.

b

I

i REBaer:jt/de BMurray RE a - 1 JJa6 on JEG ardo

G/p/85 g /pgp/85

g/D/85 [y/q /8E, [5 /2/ 0 /85

860,1030035

go 851224aoocs o5o$2g8 ,p

_ _ _ _ . .

.

i .

Nebraska Public Power District -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

[5 J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-298/85-26

cc w/ enclosures:

Paul V. Thomason, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RPB R. P. Denise, DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015
  • R&SPB *R. Baer
  • MIS System *B. Murray
  • RIV File R. L. Bangart
  • RSTS Operator

'

  • w/766