ML20151N619
| ML20151N619 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/24/1985 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20151N623 | List: |
| References | |
| NUDOCS 8601030035 | |
| Download: ML20151N619 (2) | |
See also: IR 05000298/1985026
Text
_
_ _ _ . . _ _ .
_ -
[
b
T
.
,
DEC 41985
2
,
)
In Reply Refer To:
Docket:
50-298/85-26
.
.
'
Nebraska Public Power District
'
ATIN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
'
lI
This refers to the inspection conducted by Mr. R. E. Baer of this office during
the period September 30 through October 4, 1985,.of activities authorized by
NRC Operating License DPR-46 for Cooper Nuclear Station, and to the discussion
-
of our findings with Mr. P. V. Thomason, and other members of your staff at the
conclusion of.the inspection.
Areas examined during the. inspection included the radioactive waste activities
and controls for effluent releases. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
)
interviews with personnel, and observations by the inspector.
These findings
>
1
are documented.in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
'
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
.
.Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
.
!
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
-
,
!
.
b
I
1 JJa6 on
JEG
ardo
i
REBaer:jt/de
BMurray
RE a -
[5 /2/ 0 /85
g /pgp/85
G/p/85
g/D/85
[y/q /8E,
860,1030035 851224aoocs o5o$2g8
,p
go
_ _ _ _ . .
i
.
.
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
[5 J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/85-26
cc w/ enclosures:
Paul V. Thomason, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE06)
bec distrib. by RIV:
- RPB
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015
- R&SPB
- R.
Baer
- MIS System
- B. Murray
- RIV File
R. L. Bangart
- RSTS Operator
'
- w/766